Ready project Wood Chips and Sawdust with capacity for 25 tons/day.

CODE - IND-M-073

Ready project Wood Chips and Sawdust with capacity for 25 tons/day.

CODE - IND-M-073


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Production Room
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Wood Chips and Sawdust

How to start Wood Chips and Sawdust with capacity for 25 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Wood Chips and Sawdust

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Sawmill Floor Plan | How to Set Up a Sawmill Office | How to Build Sawmills | How to Start a Sawmill | How to Set Up a Sawmill Office | Sawmill Floor Plan | Ethanol Plant Mount | Poultry Farm Floor Plan | Material for raising rabbits | Liquid Soap Manufacturing Flowchart | What It Takes to Set Up an Electrical Store | What You Need to Open an Oil Change | I Want to Set Up a Fruit and Vegetable Business | Sales of empty gas cylinders | Floor Plan Sales Lingerie Store | Cliché Making Factory | Food Distribution Shipping Flowchart | Financing for Setting Up a Daycare Center | IT Course Project for Financing | Plant for the sausage industry | How to Build a Hospital Model | How to Finance Material for a Dental Radiology Clinic | Floor Plan for Construction of Private Hospital | Motel Construction and Model | Projects for Swimming School | How to Set Up a Kitchen to Make Lunch Boxes | Gas Station Convenience Store Project | Ready-made Snack Bar Project Templates | Tanning Room Design | Medicine Business Plan | Insecticide for Ants | Jeans Layout Production | Viability of a Plastic Injection Company | How to Set Up a Sandblasting Workshop | Clothespin Assembler | Skateboard Production Flowchart | CAD Post Project | Coffee Filter Making Machine | Electroplating Sector Layout | Gas Plant Tank Project | Pop for Clinical Analysis Laboratory Reception | Retz Cheese Factory | What You Need to Open an EPI Company | Mechanical Flowchart Template | Paint Ball Entrepreneurship | Project - Beauty Center | Optical Floor Plan | Condominium Organizational Chart Template | Do I Need To Be The One To Set Up An Office? | How to Set Up a Computer Maintenance Workshop | Mount a Winch | Soft Drink Manufacturing Technique | Industrial Equipment For Instant Noodle Production | Machine for Making Crystallized Banana Candy | Corn Juice Machine Where To Buy | Ready Kennel Project |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Yogurt, Milky Beverages, with capacity of 6000 liters/day.
Project Factory to Produce Ceramic Floors with capacity for 10.000 m2/day.
PDF Industrial Bakery to Produce Loaf Bread, French Bread, Frozen French Bread and Cakes with capacity for 1.000 Kg/day.
Plant and layout Factory Galvanoplasty with capacity for 3.000 Kg/day.
Project Factory to Produce Hydrophilic Cotton with capacity for 3.000 packages per day.
Project Factory to Produce Disposable Syringe with capacity for 100.000 Syringes per day.
FeasibilitySlaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 400 animals/day.
Business plant Clothing Industry to Produce Knitwear and Sweatshirts with capacity for 500 garments/day.
Project Factory to Produce Cachaça of Honey with capacity for 1.000 liters/day.
How to start Clothing Industry to Produce Shorts with capacity for 500 garments/day.

Project - how to start Wood Chips and Sawdust with capacity for 25 tons/day.