Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Auto Body Repair with an area of 1.000 m2.
CODE - PRS-037
Ready project Auto Body Repair with an area of 1.000 m2.
CODE - PRS-037
Project ready with:
Industry with the following sections:
Services
Workshop
Painting Room
Storage
Bathroom
Dressing Room
Pantry
Administration
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Auto Body Repair
OPTIONAL SERVICES:
Financial Feasibility Study of Auto Body Repair with an area of 1.000 m2.
Business plan for Auto Body Repair with an area of 1.000 m2.
3D project of Auto Body Repair with an area of 1.000 m2.
Projects with other capacities
Auto Body Repair
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
|
How to Open a Farm
|
Homemade Chocolate Factory Financial Plan Chart
|
Essence Extraction Devices
|
What Do I Need to Open an Instrument Store?
|
How to Perform an Oil Change
|
Tobacco Shop Projects
|
Empadas Snack Bar Business Plan
|
Home Appliance Stores Layout
|
Tips on How to Set Up a Dress Rental Store
|
Pulp Industrialization Project
|
Beverage Distribution Flowchart Template
|
Recycling Business Plan
|
How to Set Up a Tech School
|
I Would Like to See Models of Butcher Shop Facades
|
Investment in refrigeration
|
How to Set Up an Outpatient Clinic
|
Radiology Equipment Price List
|
Dentist Clinic Percentage Scheme
|
Budget for Setting Up a 3D Cinema
|
How to Manage a Campsite in RS
|
Convenience Store Layout In Dwg Plan
|
Elderly Shelter Construction Project Template
|
Feasibility Study of Aesthetic Center
|
Spinning Mill Project
|
How to Acquire Candle Making Machines
|
Production of a Plush Factory
|
Underwear - Production
|
Women's Sandals
|
Picture Frame Factory Minas Gerais
|
Toothpick Making Video Video
|
Design of a model airplane to manufacture
|
Slab Factory Equipment
|
Parts for assembling a clock
|
Bricks Price Thousands Poa
|
Galvanizing Floor Plan
|
Equipment for Setting Up a Clinical Analysis Laboratory
|
Reception of Milk for Yogurt Production
|
Laundry Price List
|
Motorcycle Workshop Facade Model
|
Project Template for Setting Up a Club
|
Pop Model Equipment Maintenance
|
Budget and Layout of an Animal Exhibition Park
|
Set Up a Sewing Studio
|
Ready-made Cooperative Project Template
|
What You Need to Set Up a Calibration Company
|
Bicycle Workshop Equipment
|
Asphalt Blanket Installation
|
Leaf Abubo Factory Model
|
Forms for producing tiles
|
How to Set Up a Cake Industry
|
Coffee Roasting Flowchart
|
Equipment for Setting Up a Condiment Factory
|
How to Make Paraffined Cassava
|
Veterinary Hospital Organization Chart
|
Other projects ready:
How to start Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Brewery with Bar, Restaurant and Brewery and Chopp Factory with capacity for 300 liters/day.
PDF Slaughterhouse Quails with capacity for 10.000 birds per day.
Plant and layout Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters.
Project Slaughterhouse for bovines slaughter and Charque - 100 animals/day - area of 1.200 m² (1435,2 sq.yd).
Project Factory to Produce Vinegar made from Honey with capacity for 1.000 liters/day.
FeasibilityFactory to Produce Capsaicin with capacity for 300 Kg/day.
Business plant Slaughterhouse Buffaloes with capacity for 20 animals per day.
Project Factory to Produce Manioc (Cassava) Starch with capacity for 200 ton/day.
How to start Factory to Produce Concrete Blocks and Pierced Bricks (5.000 units per day), Premolded and Premolded Rock Soil (500 m2/day).
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US