Ready project Auto Body Repair with an area of 1.000 m2.

CODE - PRS-037

Ready project Auto Body Repair with an area of 1.000 m2.

CODE - PRS-037


Project ready with:

Industry with the following sections:
Services
Workshop
Painting Room
Storage
Bathroom
Dressing Room
Pantry
Administration

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Auto Body Repair

How to start Auto Body Repair with an area of 1.000 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Auto Body Repair

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| How to Open a Farm | Homemade Chocolate Factory Financial Plan Chart | Essence Extraction Devices | What Do I Need to Open an Instrument Store? | How to Perform an Oil Change | Tobacco Shop Projects | Empadas Snack Bar Business Plan | Home Appliance Stores Layout | Tips on How to Set Up a Dress Rental Store | Pulp Industrialization Project | Beverage Distribution Flowchart Template | Recycling Business Plan | How to Set Up a Tech School | I Would Like to See Models of Butcher Shop Facades | Investment in refrigeration | How to Set Up an Outpatient Clinic | Radiology Equipment Price List | Dentist Clinic Percentage Scheme | Budget for Setting Up a 3D Cinema | How to Manage a Campsite in RS | Convenience Store Layout In Dwg Plan | Elderly Shelter Construction Project Template | Feasibility Study of Aesthetic Center | Spinning Mill Project | How to Acquire Candle Making Machines | Production of a Plush Factory | Underwear - Production | Women's Sandals | Picture Frame Factory Minas Gerais | Toothpick Making Video Video | Design of a model airplane to manufacture | Slab Factory Equipment | Parts for assembling a clock | Bricks Price Thousands Poa | Galvanizing Floor Plan | Equipment for Setting Up a Clinical Analysis Laboratory | Reception of Milk for Yogurt Production | Laundry Price List | Motorcycle Workshop Facade Model | Project Template for Setting Up a Club | Pop Model Equipment Maintenance | Budget and Layout of an Animal Exhibition Park | Set Up a Sewing Studio | Ready-made Cooperative Project Template | What You Need to Set Up a Calibration Company | Bicycle Workshop Equipment | Asphalt Blanket Installation | Leaf Abubo Factory Model | Forms for producing tiles | How to Set Up a Cake Industry | Coffee Roasting Flowchart | Equipment for Setting Up a Condiment Factory | How to Make Paraffined Cassava | Veterinary Hospital Organization Chart |

 

Other projects ready:

How to start Factory to Produce English Sauce and Shoyu Sauce with capacity for 1.000 liters per day.
Project Sterilization Unit (by Ethylene Oxide) with capacity for 15.000 Units per day.
PDF Factory to Produce Soap Powder with capacity for 1.000 Kg/day.
Plant and layout Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 8000 liters/day.
Project Factory for Fried Potato Processing, made from potato paste, with capacity of 5.000 kg/day and 2500m² (2990 sq.yd.) area (automatized) - Chips type.
Project Factory to Produce Cachaça of Honey with capacity for 5.000 liters/day.
FeasibilityFactory to Produce Pine Nut Flour with capacity for 500 Kg per day.
Business plant Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 10.000 Kg/day.
Project Milk and Dairy Industry to be built in 2 phases: 1st Phase: Milk Packing, with an area of 95 m2 and capacity for 4.000 liters/day. 2nd Phase: Milk Packing and Organic Cheese Factory to Produce Fresh Cheese, Yoghurt and Milky Beverages, with an area of 200 m2 and capacity for 8.000 liters/day.
How to start Factory to Recycle Paper with capacity for 5.000 Kg/day.

Project - how to start Auto Body Repair with an area of 1.000 m2.