Ready project Graphical with an area of 100 m2.

CODE - PRS-039

Ready project Graphical with an area of 100 m2.

CODE - PRS-039


Project ready with:

Industry with the following sections:
Services
Storage for Papel
Storage for Paint and Pieces
Graphical (impression, cut, bookbinding, etc)
Bathroom
Dressing Room
Pantry
Administration

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Graphical

How to start Graphical with an area of 100 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Graphical

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Prs Graphics | Small Store Projects | Fishing Store Business Plan Template | Construction ProjectNewsstand | How Much Does It Cost to Set Up an Oriental Products Store | Set Up a Party Supplies Store | Clothing Store Research Project | Hard Candy Flowchart Process Description | Pharmacy Compounding Flowchart | Small Recycling Factory | How to Set Up a School Reinforcement Project | Economic Viability of a Small Cattle and Pork Slaughterhouse | How to Set Up a Meat Skewers Factory | Soccer Court Society How Much Does It Cost to Set One Up? | Credit to Set Up a Clinic | How to Design a Physiotherapy Room | Dwg Project Academy | Bar and Brewery Assembly | Project to Build a Theme Park | Electronic Bowling Alley Budget | Environmental Regulation Lava Jato | How to Start a Biscuit Business | Bone Embroidery Equipment | Flowchart of a Packaging Factory | Work From Home Assembling Clothes Pegs | Ready Office Layout Template | Raw Material For Concrete Blocks | Ready Gate Project | Set up a Paper Bag Factory | Magnet Manufacturers | How to Make a Cold Room Project | Milk Fondant Needs Inspection Registration | Motor Homes In Pocos De Caldas | 2 Bedroom Popular House Plans | How to Make a Pop Pharmacy Standard Operating Procedure | Business Service Pop Template | Elderly Devices Dwg | Baby Sitter How to Set Up an Agency | Budget to Open a Computer Technical Assistance | How Much Does It Cost to Set Up a R24 Jewelry Store | Floor Plan Projects for Stands | Ra Ranario Breeding | Ice Cream Factory Layout | How to Set Up a Small Pie Factory | Italian Worm Farming Model | Corn Processing Technology | Palm Oil Factories | How to Get Finance for a Crematorium |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day.
Project Factory to Produce Caffeine (Transform Coffee in Caffeine) with capacity for 300 liters/day.
PDF Factory to Produce Premolded Rock Soil with capacity for 1.000 m2/day.
Plant and layout Factory industrialization of Mocotó Sweet with an area of 200 m² ( 239 sq.yd).
Project Clothing Industry to Produce Upholstery with capacity for 200 garments/day.
Project Factory of Mustard in Conserve with 150m² (179,4 sq.yd.) area and capacity of 1.500 kg/day.
FeasibilityFactory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 3.000 Kg per day.
Business plant Slaughterhouse Swines Slaughter and Cold Meat Production (Sausages, Hams, Cold Meat and Smoked Products) with capacity to Slaughter 500 animals/day.
Project Factory Milk Powder Reconstitution with capacity for 3.000 liters/day.
How to start Factory to Produce Lipstick with capacity for 500 kg/day.

Project - how to start Graphical with an area of 100 m2.