Ready project Graphical with an area of 100 m2.

CODE - PRS-039

Ready project Graphical with an area of 100 m2.

CODE - PRS-039


Project ready with:

Industry with the following sections:
Services
Storage for Papel
Storage for Paint and Pieces
Graphical (impression, cut, bookbinding, etc)
Bathroom
Dressing Room
Pantry
Administration

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Graphical

How to start Graphical with an area of 100 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Graphical

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Prs Graphics | Small Store Projects | Fishing Store Business Plan Template | Construction ProjectNewsstand | How Much Does It Cost to Set Up an Oriental Products Store | Set Up a Party Supplies Store | Clothing Store Research Project | Hard Candy Flowchart Process Description | Pharmacy Compounding Flowchart | Small Recycling Factory | How to Set Up a School Reinforcement Project | Economic Viability of a Small Cattle and Pork Slaughterhouse | How to Set Up a Meat Skewers Factory | Soccer Court Society How Much Does It Cost to Set One Up? | Credit to Set Up a Clinic | How to Design a Physiotherapy Room | Dwg Project Academy | Bar and Brewery Assembly | Project to Build a Theme Park | Electronic Bowling Alley Budget | Environmental Regulation Lava Jato | How to Start a Biscuit Business | Bone Embroidery Equipment | Flowchart of a Packaging Factory | Work From Home Assembling Clothes Pegs | Ready Office Layout Template | Raw Material For Concrete Blocks | Ready Gate Project | Set up a Paper Bag Factory | Magnet Manufacturers | How to Make a Cold Room Project | Milk Fondant Needs Inspection Registration | Motor Homes In Pocos De Caldas | 2 Bedroom Popular House Plans | How to Make a Pop Pharmacy Standard Operating Procedure | Business Service Pop Template | Elderly Devices Dwg | Baby Sitter How to Set Up an Agency | Budget to Open a Computer Technical Assistance | How Much Does It Cost to Set Up a R24 Jewelry Store | Floor Plan Projects for Stands | Ra Ranario Breeding | Ice Cream Factory Layout | How to Set Up a Small Pie Factory | Italian Worm Farming Model | Corn Processing Technology | Palm Oil Factories | How to Get Finance for a Crematorium |

 

Other projects ready:

How to start Industry to Produce Wax, Wax for Car Polish, Wax for Automobiles Brightness, Wax for Wooden Floor, Wax for Furniture Polish with capacity for 1.000 Kg/day.
Project Factory to Produce Frozen Açaí Pulp with capacity for 1.000 Kg per day.
PDF Slaughterhouse Swines Slaughter and Cold Meat Production (Sausages, Hams, Cold Meat and Smoked Products) with capacity to Slaughter 800 animals/day.
Plant and layout Factory to Produce Banana Flour, Banana Sweet, Banana Purée and Biomass of Banana with capacity for 3.000 Kg per day.
Project Cowshed for Milk Cattles with capacity for 60 Cows, with Automatic Milking and Built area of 700 m² and Milk Packaging (TYPE A MILK).
Project Factory to Produce Cachaça (Liquor), Mascavo( Brown Sugar), Rapadura and Melado, with capacity for 20.000 liters/day. (To be built in a flat land).
FeasibilityFactory to Produce Tomato Extract and Tomato Pulp with capacity for 3.000 Kg per day.
Business plant Bookbinding Workshop with an area of 300 m2.
Project Factory to Produce Banana Sweet with capacity for 1.000 Kg per day.
How to start Factory to Produce Ceramics (French Tiles and Bricks) with capacity for 35.000 Kg/day.

Project - how to start Graphical with an area of 100 m2.