Ready project Bakery with an area of 100 m2.

CODE - TRG-120

Ready project Bakery with an area of 100 m2.

CODE - TRG-120


Project ready with:

Industry with the following sections:
Services
Reception of Raw Material
Storage of Raw Material
Production
Oven
Packages
Administration
Pantry
Dressing Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Bakery

How to start Bakery with an area of 100 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Bakery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Feasibility Study for Opening a Bakery | Name Suggestions for Confectionery | Bakery Feasibility Project | Economic Feasibility Projects for a Bakery | Investment in Rapadura Industry | Assembly of a Shed for Raising Quails | I Want to See Cosmetics Factories | How to Build a Goat Farm | Pet Food Store For Sale | How to Open a Windshield Repair Shop | Selling Roasted Chicken At Home | What is needed to open a fish shop? | Shop Floor Plan 200 M | How to Set Up a Maternity Clothing Store | Goods Deposit Flowchart | How to Open an Ice Distributor | Business Plan to Open a Daycare Center for the Elderly | Kosher slaughter | Snack Production Flowchart | Sausage Industry Production Flowchart Model | S Maternity Projects | Pop Model For Psf | How to Set Up a CCIH in an Emergency Room | Gym Plates | Floor Plan of a 15-Room Inn | Equipment for food by weight | Nightclub Projects | How to Set Up a Car Wash | Art Exhibition Project Template | What It Takes to Open a Surgical Shop | Tire Retreading Projects | Knitting Business Plan | Making Scraper Gloves | Flowchart of a Mirror Factory | Factories To Get Toys To Assemble | How to Set Up a Wooden Body Factory | Paper Bag Factory Know About Production | Key Factory Project | Lathe Workshop Assemble | Prosthetics Laboratory Equipment List | Long Life Milk Manufacturers | Ready Example Good Practices Manual | Ready Project About Industry | Pop Model For Assembly | Pop Cc81s Nutrition | Organization Chart of a Studio | Basic List for Manicure Startup | Tractor Resale Project | How to Set Up an Accounting Office | Where to Buy Fire Extinguisher Machines | Pig Maternity Projects | Cake Making Flowchart | Sandwich Making Equipment | How to Set Up a Coconut Milk Industry | Warehouse and Silos for Sale | Dog Bone Making Machine For Sale |

 

Other projects ready:

How to start Factory to Process Corn on the Cob with capacity for 500 Kg per day.
Project Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 20 liters.
PDF Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
Plant and layout Factory to Produce Brooms with capacity for 30.000 units per day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 20.000 Kg/day.
Project Factory to Produce Cachaça (Liquor), Mascavo( Brown Sugar), Rapadura and Melado, with capacity for 1.000 liters/day. (To be built in a flat land).
FeasibilityFactory for Palmito de Pupunha (Pupunha Palm) with capacity of 12.000 kg/day.
Business plant Rendering with capacity for 300 tons/day.
Project Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 3.000 Kg/day.
How to start Factory to Produce T-Shirts with capacity for 50 units por day.

Project - how to start Bakery with an area of 100 m2.