Ready project Bakery with an area of 1.000 m2.

CODE - TRG-123

Ready project Bakery with an area of 1.000 m2.

CODE - TRG-123


Project ready with:

Industry with the following sections:
Services
Reception of Raw Material
Storage of Raw Material
Production
Oven
Packages
Administration
Pantry
Dressing Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Bakery

How to start Bakery with an area of 1.000 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Bakery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Recommendations for Designing a Bakery | Materials for Opening a Bakery | Blueprint for Building a Bakery | How to Design a Bakery | Bakery Floor Plan Template | Ready Bakery Project | Conditioner Manufacturing | Project for Minimarkets | Layiut Sports Store | Project Description Vehicle Shop | Natural Products Store Model | Shoe Store Layout | Set up a Bovine Tannery | Manipula Pharmacy Model25c325a7ao | Construction of horse riding tracks | Rabbit Slaughter | Salami Making Equipment | Football Stadium Bathrooms | Surgical Center Model | Taking Out a Loan to Set Up a Physiotherapy Clinic | Uti Floor Plan Model | Photos of Steakhouse Floor Plans | Plan Ta Baixa Supermarkets | Industrial Dressing Room Design | Set Up a Bowling Center | How to Make a Business Plan 3D Projects | Dance Clubs Floor Plan | Toothbrush Making Machine | Educational Toy Factory | Lingerie Manufacturing Process | Project to Set Up a Leather Bag Factory | PVC Laminate Companies | Plastic Wood Manufacturers | Furniture Factory Plant | Investment to Set Up a Concrete Plant | I need Golden Grass | The Use of Aluminum in the Manufacture of Cookware | Screen Production Flowchart | Design of a Dental Prosthesis Laboratory Project | Truck Washer Plants | Ice Factory Business Plan | Automotive Battery Assembly Equipment | Standard Operating Procedure Pest Control | Standard Operating Plan Template for Veterinary Clinics | Telemarketing Flowchart Template | Materials for setting up a seedling nursery | How to Make an Internet Service Provider Flowchart | Materials for Setting Up a Flyer and Poster Business | Truck Trunk Workshop | Photo Studio Construction Project | Ice Cream Industry Floor Plan | Cheese Bread Factory Model | Vegetable Processing Companies | Syrup Production Flowchart | Soybean Oil Manufacturing Flowchart | Dog Bakery Melody |

 

Other projects ready:

How to start Factory to Produce Condensed Soy Milk with capacity for 5.000 liters/day.
Project Factory to Produce Shiitake Dehydrated with capacity for 100 Kg/day.
PDF Clothing Industry to Produce Women's Clothing (Party Clothes) with capacity for 500 garments/day.
Plant and layout Factory to Produce Soymilk Yogurt with capacity for 10.000 liters per day.
Project Clothing Industry to Produce Lingerie with capacity for 300 garments/day.
Project Factory to Produce Cachaça (Liquor), Rapadura and Açúcar Mascavo (Brown Sugar) with capacity for 300 liters of Cachaça per day and 300 Kg of Açúcar Mascavo (Brown Sugar) per day.
FeasibilityFactory to Produce Organic Cachaça (Liquor) with capacity for 100 liters/day.
Business plant Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 100 liters/day.
Project Factory to Produce Lipstick with capacity for 500 kg/day.
How to start Factory for Manioc Flour with capacity of 1000 kg/day and 225 m² (269,1 sq.yd.) area.

Project - how to start Bakery with an area of 1.000 m2.