Ready project Bakery with an area of 300 m2.

CODE - TRG-121

Ready project Bakery with an area of 300 m2.

CODE - TRG-121


Project ready with:

Industry with the following sections:
Services
Reception of Raw Material
Storage of Raw Material
Production
Oven
Packages
Administration
Pantry
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Bakery

How to start Bakery with an area of 300 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Bakery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Bakery 300 M2 | Develop a Project for a Cosmetics Factory for BNDES | I want a motorcycle shop plan | Information About Motorcycle Venture | Models of Stores to Sell Chicken | Business Plan for a Fish Market | Setting Up An Air Conditioning Store | How to Plan to Open a Children's Clothing Store | How to Open a Basic Food Basket Assembly Company | Example of Senior Citizen Coexistence Project | What is needed to set up a meat slaughterhouse? | Pasta Industry Layout | How to Make Anchovy | Central Material Project | What It Takes to Set Up a Medical Products Distributor Step by Step | Projects for Ambulance Acquisition | Gymnastics Pool | Model Projects Construction Inns | Industrial Kitchen Flowchart Pdf | Snack Bar Business Plan Template | Hydrogen Flowchart | Paint Factory Projects | Materials for Making Lingerie | Sc39as Factory Project Model | Factory Dwg Layout | Model of a Factory with Styrofoam | Squeegee Making Machine | Matchstick Making Machines | Mortar Company | Graphic Business Plan | Anodizing Aluminum Products Sales | Setting Up a Small Machining Workshop | Asphalt Analysis Laboratories | Set Up a Cheese Factory $$ Profit and Profitability | Condensed Milk Processing | Good Manufacturing Practices Manual for Correlatos2c How to Prepare | Tips for Setting Up a Modern Tire Shop | Quail Eggs Legislation | Procedure for Setting Up a Company | Lpg Gas Tank Plan In Dwg | Manicure Project | Wooden Plank Templates for Office to Place Products | Accounting Office Facades | Fire Extinguisher Workshop Machines | How to Set Up a Small Kiosk | Pig Farm Floor Plan Finishing | Technological Production of Pastry Dough | How to Start a Garlic Bread Business | How to Set Up Pepper Factories | Wheat Flour Mill Machines By Bndes | What is the name of the person who makes the bone with the leather scraps for dogs? |

 

Other projects ready:

How to start Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
Project Factory to Produce Pepper Powder Packed in Capsules with capacity for 300 Kg/day.
PDF Factory to Produce Banana Purée with capacity for 120.000 Kg/day.
Plant and layout Wood Chips and Sawdust with capacity for 25 tons/day.
Project Factory to Produce Fodder in Cans for Dogs and Cats with capacity for 20.000 Kg/day.
Project Factory to Produce Cachaça dos Alemães (elaborated from the melado de cana, concentraded sugar cane juice), with capacity for 500 liters/day.
FeasibilityCold Storage Room to Produce Salted Fish and Fish Products with capacity for 40.000 Kg/day.
Business plant Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 8.000 Kg per day.
Project Breastfeeding with a Collection capacity for 10 donation chairs.
How to start Factory to Produce Soap Powder with capacity for 500 Kg/day.

Project - how to start Bakery with an area of 300 m2.