Ready project Beauty Salon with an area of 50 m2.

CODE - PRS-058

Ready project Beauty Salon with an area of 50 m2.

CODE - PRS-058


Project ready with:

Industry with the following sections:
Reception of Customers
Waiting Room
Area to Register Customers
Services (Hairdresser, Waxing, Nails - hand/foot)
Therapy Boxes
Administration
Pantry
Bathroom
Dressing Room
Storage for Cleaning Material
Linen Room
Storage for Equipments

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Beauty Salon

How to start Beauty Salon with an area of 50 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Beauty Salon

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

35 Square Meter Beauty Salon | Hair Salon Projects | Beauty Salon Floor Plan 50m2 | Beauty Salon Schedule | Beauty Salon Flowcharts | Floor Plan Or Design Of A Hair Salon 50m2 | Beauty Salon Flowchart Pdf | Beauty Salon Project With Floor Plan And Layout | Build Beauty Salon | Beauty Salon Name Examples | Beauty Salon Assembly Flowchart | Beauty Salon Project | Financing for Beauty Salon Equipment | Organizational Structure of a Beauty Salon | Flowchart of a Hair Salon | How to Set Up a Beauty Salon in a Hospital | Financial Flowchart of a Beauty Salon | Hair Salon Project Dwg | Beauty Salon Flowchart Example | Flowchart of a Salon | Beauty Salon Development | Flowchart of a Beauty Salon | Beauty Salon Project Timeline | Salon Flowchart | Ready-made Hair Salon Project Template | Beauty Project | Beauty Salon Layout Project | Beauty Salon Flowchart | I would like to finance a hair salon | Beauty Salon Process Flowchart | Hairdressing Flowchart | Beauty Salon Flowchart | Beauty Salon Layout And Building Models | Ebeleza Room Plan with 50 M2 | Salon Flowchart Templates | Beauty Salon Layout Templates | Beauty Salon Project Schedule | Beauty Salon Dwg | Beauty Salon Construction Projects | Physical Financial Schedule of a Beauty Salon | List of Equipment for Setting Up a Beauty Salon | Floor Plan Design for Beauty Salon | How to Set Up a Beauty Business | I Have 50 Square Meters to Build My Hair Salon | Beauty Salon Layout Example | Flowchart of the Process and/or Service Provision of a Beauty Salon | Beauty Salon Room Layout | Beauty Flowchart | Flowchart Examples Of A Salon | How to Create a Beauty Salon Organization Chart | How to Set Up a Digital Print | How to Set Up a Tire Distributorship | Setting Up a Rotisserie | What Do I Need to Set Up a Shower Assembly Workshop? | How to Set Up a Fabric Store | Medicine Deposit Layout | How to Open a Business to Provide Basic Food Baskets | School Financial Plan Template | Small Refrigerator | Beef Burger Making Machine | Machines for Sausage Production | Medical Office Set Up | Psf Plants Models | How to Set Up an Emergency Room | What Are The Activities Of A Buffet? | Example of a guesthouse project | Light Food Drawings | How to Open a Nightclub | Car Wash Project In Cad | Studies on Children's Party House | Pharmaceutical Company Flowchart | Mattress Factory Layout | Clothing Production Layout | How to Make a Uniform Production | TNT by BNDES | Styrofoam Food Tray Manufacturer | School Wallet Dwg | How to Set Up a Wooden Door Store | Forms for Making Concrete Posts | Kite Production Wins | Courses How to Assemble Aluminum Frames | Flux for Hot Galvanizing | Dental Prosthesis Laboratory Equipment Stores | Chocolate Production Process | Good Clinical Medical Practices Manual Template | Pop Cross Contamination Prevention | Examples of Standard Operating Procedures in Restaurants | Florist Business Plan | Setting Up a Service Company | Mobile Content Production Software | Accounting Office Decoration Template | Fire Extinguisher Recharging Project | How to Set Up a Pig Farm | What It Takes to Open a Bakery | Cream Cracker Company Organization Chart | Bean Processing Phase Flowchart | Flowchart of a Fruit Processing Business | Minas Pepper Sauce Factory | Materials for Setting Up a Pet Shop |

 

Other projects ready:

How to start Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 1.000 Kg/day.
Project Sterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 250.000 Units per day.
PDF Poultry House with capacity for 1.000 Broiler Breeders (to Produce Matrix and Egg Incubators to Produce Chicks).
Plant and layout Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 5.000 Kg/day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters.
Project Milk and Dairy Industry for Sour Cheese production, with capacity of 3000 liters/day.
FeasibilityFactory to Produce Macaroni for dry Pasta with capacity for 5.000 kg/day.
Business plant Frog Meat Processing with capacity for 3.000 frogs per day.
Project Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
How to start Unit of Mental Health Care with 10 beds.

Project - how to start Beauty Salon with an area of 50 m2.