Ready project Maternity Hospital for 5 beds.

CODE - HP-012

Ready project Maternity Hospital for 5 beds.

CODE - HP-012


Project ready with:

Unit Services with the following sections:
Patients Reception
Waiting Room
Patients Registration Area
Woman in Labor Reception Area
Room for Woman in Labor Examination, Admission and Hygienic Cleaning
Rooms for Prebirth and Birth
Post-Birth Rooms
Living Room
Shift
Nursing Health Center
Room to Keep and Prepare Anaesthetics
Prebirth Room
Area for Anaesthetical Introduction
Normal Birth Room
Area to Wash Hands
Room for Surgical Birth / Curettage
Room for Intrauterine Manual Aspiration ( AMIU )
Area for Assistance of Newborn
Area for Medical Prescription
Area for After-Anaesthetical Recovery
Expugation Room
Utilities Room
Pantry
Kitchen
Storage for Cleaning Material
Laundry
Leisure
Parking Lot
Other Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Maternity Hospital for 5 beds.

How to start Maternity Hospital for 5 beds. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Maternity Hospital for 5 beds.

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Maternity Nursing Pop | Standard Operating Procedure in Maternity | Maternity Equipment Design Template | Standard Operating Procedure Templates for Maternity Nursing | Reception Pop | How to Set Up a Nursing Consultancy | Standard Operating Procedure for Parturients | Maternity Nursing Consultancy | How to Start a Nursing Consulting Business | Maternity Nursing Pop Model | Pop Maternity | Pop Nursing Flowchart Example | How to Set Up a Pre-Birth | Pop Model Recep25c325a725c325a3o | Pop Template for Reception | How to Put Together Pop in Nursing | Nursing Pop Model | Maternity Pop Model | Standard Operating Procedure for Maternity Wards | How to Build a Nursing Pop | Delivery Room Project Model | Pop Example In Maternity | Org Chart Templates | Delivery Room Design | Materials Needed to Set Up a Maternity Ward | Pop Nursing Ready Or Organizational Chart Template | Nursing Pop Model | How to Set Up Delivery Rooms in a Hospital | What to Say About Nursing Pop in Maternity | Pop In Nursing Legislation | Standard Operating Procedure for Maternity Nursing | Project Model - Delivery Room | Pop For Reception | Delivery Room Construction Model | Standard Operating Procedure (SOP) Delivery Room | List of Necessary Equipment for Maternity | Standard Operating Procedure for Pre-Labor and Delivery Nursing | Materials Needed to Set Up a Maternity Ward in General | How to Set Up a Nursing Service Provider | Nursing Project Template for Equipment | Pop Model For Maternity | Maternity Nursing Pop | Anesthesia Service Provision Budget Template | Assemble Maternity Hospital standard RDC-50 ANVISA | Standard Operating Procedure for Maternity Ward | Maternity Flowchart Template | Maternity Business Plan | Maternity Standard Operating Protocol | Pop Maternity Admission | Opening a Company Providing Anesthesia Services How to Open | Ready-to-Farm Broiler Project | What You Need to Set Up a Soap Factory | How to Stock Up on Soap | Organizing an Electrical Supplies Store | Oil Change Shop Business Plan | Ready-made Layouts for Agricultural Stores | How to Open a Fruit and Vegetable Store | How to Open a Gas Sales Business | How Much Does It Take to Open a Lingerie Store? | How to Set Up a Chewing Gum Factory | Organization Chart of the Food Distribution Company | Ready-to-Set-Up Project for a Nursery | Language School Organization Chart | Machines for Making Charque | Pig Slaughterhouse Layout Plans | Setting Up a Private Clinic - What You Need | Ready Business Plan for Dental Radiology Laboratory | What You Need to Set Up an Audiology Room | Motel Flowchart Template | Ready-made Internet Cafe Floor Plan Drawing | Mamitex Kitchen | Designs for Convenience | Snack Bar Design Drawings | Massage Patient Care Form Template | Medication Production Flow | Main Synthetic Sink Factories | Name of Companies That Manufacture Pants | Sock Factory Business Plan | Straw Factory | Sandblasting Drawings | How to Assemble a Surfboard Factory | Make Concrete Post | Coffee Stand Manufacturers | How Much Does It Cost To Open A Galvanizing Company? | How Gas Cylinders Are Made | Laboratory Assembly Project for Clinical Analysis | How to Set Up a Mozzarella Cheese Factory | Cheese Industry Layout | Mandatory PPE in Cafeterias | Financial Plan Ready for Macanica Workshop | How to Preserve Chicken Eggs | How to Create a Pop for Sales | Physical Arrangement Layout of a Beauty Clinic | List of Materials to Assemble a Cartridge Recycler | Business Plan for Condominium Management Company | How to Set Up an Engineering Office | Floor Plan of a Maintenance Workshop | Organizational Chart of a Towing Company | Machines to Manufacture Soft Drink | French Bread Dough Dispenser | Gnocchi Fabric | What Equipment Is Needed to Set Up a Candy Factory? | How to Assemble Rice Packaging | Importance of Orange Quality Control | Kennel Models for About 50 Dogs |

 

Other projects ready:

How to start Laboratory for Concrete Analysis with capacity for 100 tests per day.
Project Industrial Kitchen with Restaurant with capacity for 500 meals per day.
PDF Educational and Psycho-Social Establishment Service (APAE), with an area of 1.200 m².
Plant and layout Footwear Industry to Produce Sneakers with capacity for 1.000 pairs/day.
Project Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 1.000 garments/day.
Project Clothing Industry to Produce Jeans Pants with capacity for 500 garments/day.
FeasibilityCyberCafé with an area of 50 m2.
Business plant Auditorium and Convention Center with capacity for 500 people.
Project Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 30.000 liters/day.
How to start Factory for automatic Processing of Legumes with 500m² (598 sq.yd.) and capacity of 7.500 kg/day.

Project - how to start Maternity Hospital for 5 beds.