Ready project Charque factory with area of 541 m² (647 sq.yd).
CODE - FRIG-034
Ready project Charque factory with area of 541 m² (647 sq.yd).
CODE - FRIG-034Project ready with:
Industry with the following sections:Reception Platform
Carcass Reception
Cold Storage for Carcass
Climatized Deboning Room
Reception area for Animal rests
Salting Room
Package Room
Package Storage
Salt Storage
Finished Products Storage
Shipyard
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Charque factory
OPTIONAL SERVICES:
- Financial Feasibility Study of Charque factory with area of 541 m² (647 sq.yd).
- Business plan for Charque factory with area of 541 m² (647 sq.yd).
- 3D project of Charque factory with area of 541 m² (647 sq.yd).
Projects with other capacities
Charque factory
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Charque Factory Layout | Charque Factory Project Model | Charque Sif | Sparkling Wine Production Flowchart | Cattle Confinement Plant | Nail Polish Factories | How to Set Up a Mobile Store | Setting Up a Fishing and Camping Supplies Store | ATM Projects | I want to set up a candy store 2cdo what I need | Party Supplies Viability | Men's Clothing Store Business Plan | How to Create a Factory to Produce Dulce De Leche | Homeopathy Pharmacy Floor Plan | How to Build a Sewage Treatment Plant Model | School Reinforcement Ready Planning | Micro Slaughterhouse for Cattle and Pigs | Impact Machines | Putting Together A Society | What is needed to set up a surgical center? | How to Prepare a Clinic Budget | Gym Layout Bodybuilding | Beer Factory Ornogram | Gym Drawing Templates | Value of Setting Up a Bowling Alley | Environmental Project for Licensing of Car Wash | Set up a Chemical Analysis Company | Image Production | Computerized Embroidery Business Plan | How to Set Up a Textile Industry | Ornograms of Companies that Manufacture Packaging | Clothes Pegs Companies | Business Plan for Autoclave Treatment Plant | Block Factory to Produce 3,000 Units Per Day | Guitar Projects | Paper Cup Machines | Wire Work | Boiler In A Yogurt Factory | Industrial Chantilly | How to Assemble a Motorcycle at Home Project | One Bedroom House Floor Plan | Standard Operating Procedure for Ice Cream Shops | How to Make a Pop for a Pest Control Company | C3b4nibus Floor Plan Project | How to Set Up a Spring Workshop | Small Delivery Businesses | How to Set Up a Clothing Atelier | Equipment Rental Flowchart | How to Make a Project to Implement an Ice Cream Shop | Economic Feasibility Project for BNDES Ready | Shrimp Farming Project Template | Cassava Dishes | Price of an ice factory with a capacity of 200kg | Oil Extraction Project | Dog Parties |
Other projects ready:
How to start Clothing Industry to Produce T-Shirts with Printing Sector and with capacity for 1.000 garments/day.
Project Slaughterhouse to Produce Cold Meat and Cured Food, with area of 150 m² (179,4 sq.yd) and capacity for 2000 kg/day (with reception for Boneless Meat).
PDF Slaughterhouse Caprines with capacity to Slaughter 800 animals/day.
Plant and layout Clothing Industry to Produce Caps with capacity for 1.000 garments/day.
Project Factory to Produce Pepper Oleoresin with capacity for 5.000 Kg/day.
Project Lottery Agency with an area of 50 m2.
FeasibilityFactory for Matutinal Cereal production with 250m² (299 sq.yd.) area and capacity of 1.500 kg/day.
Business plant Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 400 animals/day.
Project Brewery with Bar, Restaurant and Brewery and Chopp Factory with capacity for 1.000 liters/day.
How to start Factory to Produce in Natura Pepper with capacity for 3.000 Kg/day.



