Ready project Factory Milk Powder Packing with capacity for 10.000 Kg/day.

CODE - LTC-094-D

Ready project Factory Milk Powder Packing with capacity for 10.000 Kg/day.

CODE - LTC-094-D


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Milk Powder Packing

How to start Factory Milk Powder Packing with capacity for 10.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Milk Powder Packing

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Treat Packaging Factory | How to Open an Esoteric Online Business | How to Set Up a Car Rental Company | What Do I Need to Open a Car Dealership? | Natural Products Store Projects | Floor Plan of a Shoe Store | Tannery Academic Work | Business Plan for a Compounding Pharmacy | School Plan Drawings | Rabbit Slaughtering Refrigerator | How to Set Up a Salami Factory | Football Stadium Floor Plan | Set Up Operating Room | Physiotherapy Clinic Project .dwg | Uti Floor Plan | Small Steakhouse Layout | Construction and Design of Tennis Courts | Bowling Business Plan | List of Materials for Setting Up a Car Wash | How Do I Start Selling Marmitex? | Toothbrush Factory Financial Projection | Educational Toys Project | Where to Buy Raw Material for Lingerie Manufacturing | Monter Bag Factory | PVC Partition Manufacturers | Plastic Wood Factory | A Furniture Industry Project | Business Plan for a Block Factory | Plant for Construction of Concrete Plant | How to Set Up a Cardboard Factory | Production of a pan | Wire Mesh Dwg* | Ready-Made Dental Prosthesis Business Plan | Dairy Project | Ice Making Room Model | Meat Standard Operating Procedures | Pop Models for Analysis | How to Set Up a Real Estate Agency | Setting Up A Plant Nursery Is Expensive | Radio Provider Project | Water Flyer Templates | Ready-made Projects for Sockets for Refrigerated Trucks | Maintenance Company Business Plan | Setting Up An Ice Cream Manufacturing Company | Machines and Equipment for Cheese Bread Production | Grape Juice Production Flowchart | Onion Processing Stages | Guarana Syrup Production | Tofu Production Equipment | How to Build a Cemetery Boneyard |

 

Other projects ready:

How to start Industry to Produce Bleach with capacity for 1.000 liters/day.
Project Factory to Produce Physiologic Serum with capacity for 20.000 liters/day.
PDF Factory to Produce Corn Flour, Canjica (corn grits), Corn Flakes with capacity for 10.000 Kg per day
Plant and layout Factory to Produce Capsaicin with capacity for 3.000 Kg/day.
Project Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 50.000 bandages per day.
Project Day Care with capacity for 20 children
FeasibilitySlaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
Business plant Farm Breeding and Slaughter of Quails with: Farm to Produce Quail Eggs, Farm for Broiler Quail Breeding, Slaughterhouse for Quails, Factory of Canned Quail Eggs, Egg Incubator and Nursery for Quails, with capacity for 500 Eggs and Birds per day.
Project Cachaça (Liquor) Factory, with capacity for 1.000 liters/day. (To be built in a different level land).
How to start Slaughterhouse Alligator with capacity for 50 animals per day.

Project - how to start Factory Milk Powder Packing with capacity for 10.000 Kg/day.