Ready project Drugstore with an area of 200 m².

CODE - DR-006

Ready project Drugstore with an area of 200 m².

CODE - DR-006


Project ready with:

Drugstore with the following sections:
Area for Sales
Administration
Pantry
Dressing Room
Storage for Cleaning Material
Storage

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Drugstore

How to start Drugstore with an area of 200 m². Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Drugstore

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Ready-made Business Plan for Drugstores | Pharmacy Profitability | I want to set up a pharmacy with the support of BNDS | Drugstore Business Plan | Drugstore Viability | Drugstore Business Plan | Pharmacy Business Plan Template | Drugstore Financial | Project for opening a company2fdrogaria | Drugstore Business Plan Template | Profitability of a Drugstore | Drugstore Business Plan | Business Plan for a Drugstore | How Much Do I Need to Open a Mini Market? | Can I Start By Renting Just A Concrete Mixer? | Setting Up a Dental Products Resale Business | Setting Up a Cold Cuts Company | How to Set Up a Cereal Shop | Baby Store Business Plan | I Want to Set Up My Costume Shop | Lau Out For Compounding Pharmacy | I Want to Open a Condiment Industry | Kindergarten School.dwg | Refrigerator How to Assemble One | Dog Crematory Oven | Multi-sports court Dwg project | Medical Clinic Project | Basic Health Unit Project | Drawing of a Floor Plan of an Intensive Care Unit | Floor Plan of a Coffee Shop | Supermarket Floor Plan Template | How to Make a Financial Plan for a Gym or Business | Building Plans for Bar and Nightclub | What is needed to set up a dance club? | Toothbrush Industry | How to Clean Beef Bones | Work on Business Plan Jeans Brazil | Shirt Factory Layout | I Want to Open a Broom Company | Dog Drinking Fountain Factory | Coal Factory | Concrete Plants.dwg | Cardboard Tube Machines | Pot Production | Mount Exhaust | Animal Analysis Laboratory | Models on Milk Reception in Industries | Mineral Water Bottling Process Flowchart | Parking Project .dwg | Pop From A Fridge | Pop Biological Material Disposal | Plant for Beauty Salon | Organic garden model | How to Set Up a Tracker Sales Store | Can I Open a Surveying Company? | Refrigeration Workshop Facade | Filming Equipment Financing | Popsicle Flowchart | Pasta Making Equipment | Canned Peas Manufacturing | Project Model for Development of Fruit Pulp Industry | Tomato Paste Factory | Tips on How to Open a Cosmetics Industry |

 

Other projects ready:

How to start Clothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 300 garments/day.
Project Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 20 liters.
PDF Clothing Industry to Produce Shorts with capacity for 50 garments/day.
Plant and layout Meat, Cold Meat and Colds Deliverer with capacity for 5.000 kg/day.
Project Cabinetmaking with capacity for 25 tons/day.
Project Egg Sorters with capacity for 50.000 Eggs/day.
FeasibilityCold Meat Production (Bovines, Swines, Caprines, Ovines and Ostrich) with Deboned Meat Reception and capacity to produce 20.000 Kg/day
Business plant Inn with capacity for 5 quartos.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 3.000 Kg/day.
How to start Deliverer of Gas Cylinder for Kitchen with capacity for 50 Cylinders per day.

Project - how to start Drugstore with an area of 200 m².