Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Energy Drinks with capacity for 10.000 liters/day.
CODE - REFR-023
Ready project Factory to Produce Energy Drinks with capacity for 10.000 liters/day.
CODE - REFR-023
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Energy Drinks
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Energy Drinks with capacity for 10.000 liters/day.
Business plan for Factory to Produce Energy Drinks with capacity for 10.000 liters/day.
3D project of Factory to Produce Energy Drinks with capacity for 10.000 liters/day.
Projects with other capacities
Factory to Produce Energy Drinks
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Set Up Energy Industry
|
How to Set Up an Energy Factory
|
Energy Production
|
How to Set Up an Energy Factory
|
How to Set Up an Energy Factory
|
Energy Production
|
What Projects Are Required to Build a Cleaning Products Factory
|
I Want to Invest in a Screw Shop
|
What It Takes to Set Up an Oil Change
|
How to Start a Roast Chicken Business25
|
How to Get Sif for Fishmonger
|
I want the address of the tempered glass factory
|
How Much Does It Cost to Start Selling Clothes?
|
Setting Up a Banana Candy Industry
|
Beverage Distribution Store Layout25c325a725c325a3o
|
Business Plan to Set Up a Nursery
|
Slaughterhouse Reel
|
What Does It Take to Set Up a Small Sausage Factory?
|
Fish Budget
|
What Material Is The Phone Made Of?
|
Waste Incinerators Medicines
|
Standard Operating Procedure for Vaccination Room
|
See Moteu Under Construction
|
How Much Does It Cost To Open A Fishing Boat?
|
Industrial Kitchen Business Plan
|
P2fbar Plant
|
3D Designs of Snack Bars
|
Building Construction Schedule
|
Hospital Floor Plan What Equipment Is Mandatory?
|
Paint Company Flowchart Template
|
Organization Chart of a Lingerie Factory
|
How to Set Up a Ball Factory
|
I want to open a PVC store
|
Opening a Block Factory Company
|
What You Need to Set Up a Sawmill
|
How to Open a Matchstick Industry
|
Cost of Setting Up a Mortar Industry
|
How to Set Up an Egg Carton Factory
|
How to Set Up a Successful Metalworking Shop
|
What is needed to assemble a zinc plating company?
|
Soil Analysis Form Template
|
Dairy Models
|
Preventive Maintenance and Equipment Calibration Pop Ready
|
Bodywork and Painting Layout
|
Smoked Quail Egg
|
Cooking Gas Company Phone Number Poços De Caldas
|
Barber Shop Models
|
Floor Plan of a Commercial Office
|
Consulting Office Floor Plan
|
Where to Find Products to Assemble a Large Chandelier
|
How to Start a Model Making Company
|
Pig Farming Project for Fattening
|
How to Set Up a Pizza Dough Business
|
Pamonha Machines
|
Microwave On Ground Floor
|
Wheat Milling Prevention
|
Soft Drink Production
|
Dog Hotel Production Capacity
|
Other projects ready:
How to start Factory to Produce Dough of Baked and Frozen Cheese Bread with capacity for 1.000 Kg/day.
Project Factory to Produce Costume Jewelry with capacity for 30.000 jewelries per day.
PDF Buffet with capacity for 1.000 people.
Plant and layout Factory to Produce Pepper Powder with capacity for 3.000 Kg/day.
Project Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 3.000 Kg per day.
Project Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 80.000 liters/day.
FeasibilityFactory to Produce Macaroni for Fresh Pasta with capacity for 10.000 kg/day.
Business plant Industrial Bakery to Produce French Bread with capacity for 3.000 Kg/day.
Project Family Health Program with an area of 500 m2.
How to start Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 10.000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US