Ready project Factory Aluminum Recycling with capacity for 10.000 kg/day.

CODE - IND-T-026

Ready project Factory Aluminum Recycling with capacity for 10.000 kg/day.

CODE - IND-T-026


Project ready with:

Industry with the following sections:
Reception Platform
Storage of Scraps
Storage for Pressed Sraps and Aluminum Alloys
Storage for Sand
Room to Mixture Sand
Molding
Demolding
Finish
Storage for Finished Products
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Aluminum Recycling

How to start Factory Aluminum Recycling with capacity for 10.000 kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Aluminum Recycling

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Deposit Template for Recycling | I Want to Set Up a Hardware Store | Layout For Perfume Stores | Financed Gas Station Projects | Espresso Coffee How to Assemble | How to Open a Landscaping Store | Setting Up Surfwear Store | Gingerbread Production Layout Example | Physical Manipulation Pharmacy Plant | Tire Factory Budget | Basic Cooking Course Project | Beef Deboning | Synthetic Football Business Plan | Equipment in a Radiology Clinic | Example of How to Create an Organizational Chart for a Medical Clinic | What is the initial investment for an industrial kitchen? | 70 M House Project | How to Finance a Flat | Pizzeria Opening Project | Layout of a Geriatric Clinic | Horse Stall Design in DWG | Business Plan to Set Up an Industry | Marble Works Budget Templates | How to Build a Small Wood Craft Factory Leyauty | How to Set Up a Bikini Industry | How to Start a Tennis Business | Inflatable Balloons Project | Barbecue Charcoal Tank | What Documents Are Required to Open a Lumberyard? | Brick Factory Floor Plan | Toy Car Projects | Buy Expanded Clay | Wood for Making Cages | How to Set Up a Quality Control Company | Dairy Equipment for Cheese Making | How to Open a Hospital Laundry | How Much Does It Cost to Set Up a Painting Shop | Skate Ramp Block Cad | Standard Operating Procedure Templates for Healthcare | Procedure in Refrigeration | Optical Laboratory Project | Inbound Tourism Business Plan | What Do I Need to Open a Construction Company? | How to Set Up an Authorized Electronics Workshop | Standard Operating Procedure Template for Mineral Salt Factory | Ceramic Tile Making Machine | Academic Work French Bread | Definition of Snacks Type Salty Foods | How to Grow Chanpignon in a Greenhouse | How to Set Up a Banana Chips Factory | Legislation for the Manufacture of Dog Biscuits |

 

Other projects ready:

How to start Mini-Factory to Produce Cashew Nut with capacity for 500 Kg/day.
Project Slaughterhouse Ovines with capacity to slaughter 800 animals/day.
PDF Factory to Produce Capsaicin with capacity for 500 Kg/day.
Plant and layout Factory to Produce Vegetal Coal with capacity for 3.000 Kg/day.
Project Factory to Produce Bala de Coco (Coconut Candy) with capacity for 500 Kg/day.
Project Factory to Produce Pastry Dough with capacity for 2.000 kg/day.
FeasibilityCowshed for Milk Cattles with capacity for 30 Cows, with Automatic Milking and Built area of 300 m² and Milk Packaging (TYPE A MILK).
Business plant Factory to Produce Scented Pillows with capacity for 1.000 pillows per day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Butter, with capacity of 6000 liters/day.
How to start Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters.

Project - how to start Factory Aluminum Recycling with capacity for 10.000 kg/day.