Ready project Factory for Pupunha Palm with capacity for 2.000 kg per day.

CODE - VEG-079

Ready project Factory for Pupunha Palm with capacity for 2.000 kg per day.

CODE - VEG-079


Project ready with:

Industry with the following sections:
Reception
Cleaning dos Talos
Cutting Room
Packages
Sterilization
Packing
Storage for Packed Products
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory for Pupunha Palm

How to start Factory for Pupunha Palm with capacity for 2.000 kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory for Pupunha Palm

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Palm Heart Factory Project | Pupunha Plant Drawings | Bndes for Pupunha | Equipment for preparing sanitary water | I Want a Blueprint to Build an Auto Parts Store | Extreme Sports Project Template | Bank Branch Floor Plan Template | How Much Does It Cost To Open A Candy Store | Supplement Store Templates | I Want to Open an Orthopedic Products Store | Paçoca Sweets Manufacturers | Bndes Credit | Ready-Made Music Projects | Chicken Slaughterhouse Model | Meat House Floor Plan | Build Stadiums | How to Set Up the Surgical Field | How to Set Up a Physiotherapy Clinic | Bndes Finances Construction of Gymnasium | Set up a beer factory | How to Set Up a Dance Academy | Equipment for Setting Up a Bowling Alley | Assemble a Car Wash Ramp | Cost of Building a 20-Room Hotel | Business Plan to Set Up a Laboratory for Microbiological and Physicochemical Analysis of Products | How to Set Fireworks | Tips for Setting Up a Knitting Shop | Disposable Clothing Company | Ready-Made Business Plan Regarding Disposable Cups | Set Up a Plastic Recycling Company | How to Make an Autoclave | How to Make a Precast Factory | Solar Heaters Diameters In DWG | Candy Mold Manufacturers | Construction Hardware Plant Drawings | Uht Plant Prices | Buggy Riding Law | What is the Operating Procedure for Being a Cosmetic Distributor? | Standard Operating Procedure Ready | Set up a 0800 number | Graphic Company Layout | How to Set Up a School Transportation Company Emprega Brasil | Ice Cream Factory Layout Drawing | How to Set Up a Pastry Industry | Financial Schedule Template for Mining Company | Business Viability2c French Fries | Fruit Syrup Manufacturing | Peanut Oil Flowchart | How to Set Up a Pet Cemetery Business Plan |

 

Other projects ready:

How to start Leather Tannery (just until Wet Blue) with capacity to Produce 1.000 leathers/day.
Project Medical Clinic with 1 Doctor`s Office.
PDF Factory to Produce Paper Coffee Strainer with capacity for 3.000 boxes/day.
Plant and layout Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 8000 liters/day.
Project Factory to Produce T-Shirts with capacity for 200 units por day.
Project Factory to Produce Wine, with capacity for 500.000 liters/year.
FeasibilityFactory to Produce Concrete Lamppost with capacity for 100 units/day.
Business plant Smoker with capacity to produce 50 Kg/day.
Project Factory to Produce Pallet Fodder for Fishes, Cats and Dogs with capacity for 20.000 Kg/day.
How to start Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 50 garments/day.

Project - how to start Factory for Pupunha Palm with capacity for 2.000 kg per day.