Ready project Factory Fruit Improvement with capacity for 10.000 Kg per day.

CODE - VEG-F-012

Ready project Factory Fruit Improvement with capacity for 10.000 Kg per day.

CODE - VEG-F-012


Project ready with:


Industry with the following sections:

Reception
Cleaning and Selection
Area para Washing
Cold Chamber for Stocking (02 units)
Processing Room
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Fruit Improvement

How to start Factory Fruit Improvement with capacity for 10.000 Kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Fruit Improvement

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Fruit Processing Unit Construction | How to Set Up a Microbrewery Project | Ready Work2c How to Set Up a Poultry Farm | Shampoo Legislation for Production | Raw Material Soap Stone | Names of electrical supply stores | How Much Does It Cost to Set Up an Oil Change Shop | Agricultural Store Facade | Steps to Setting Up a Retail Store | What Is The Investment To Open A Lingerie Store | I Want to Set Up a Chewing Gum Factory | How to Set Up a Meat and Sausage Distributor | Nursery Floor Plan Drawing | Dairy Farm.dwg | Reception of Meat in the Production Room | Hospital Model Dwg | Incineration in Other Countries - Hospital Waste | How to Make a Hospital Incinerator | Lan House Project | Raw Material for Supplying Marmitex | Basic Budget for Building a Gas Station | Snack Bar Assemblies | How to Set Up a Relaxing Massage Project | Syringe Assembly Machine | Marble Production Countries | Jeans Factories and Distributors | How to Set Up a Plaster Factory | Production Sector of a Plastic Cup Factory | Styrofoam Financial Aspects | Licensing for Briquette Factory | Project for Manufacturing Wooden Pallets | How to Set Up a Plaster Factory | How to Make Wet Wipes | How to Start an Aluminum Recycling Business | Gas cylinder manufacturing | Provision of Clinical and Pathological Analysis Laboratory | Countries That Produce the Most Cheese | Good Practices Manual for Drugstore | Automotive Paint Revitalization | Egg Manufacturers in Powder in Samta Catarina | Hospital Project Manual | How to Set Up a Gas Distributor | How Much Does It Cost to Build a Warehouse | Law Office Model Facade | Bathroom Plan Template With Exhaust Fan Autcad | Isotc3b4nico Production | Machines for Making Frozen French Bread Dough | Ostia Production | Flour Factory | Setting Up a Small Roastery | How to Set Up a Passion Fruit Juice Factory | Dog Hotel Models |

 

Other projects ready:

How to start Cowshed for Milk Cattles with capacity for 15 Cows, with Manual Milking and Built area of 110 m², for Type C Milk.
Project Barbecue Restaurant with capacity for 50 tables.
PDF Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Butter, Yogurt, Milk Beverages, packed Milk types B and C, with capacity of 2000 liters/day.
Plant and layout Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters.
Project Industrial Laundry with capacity for 500 kg of Clothes per day.
Project Cold Storage Room to Produce Fresh Fish and Fish Products with capacity for 1.000 Kg/day.
FeasibilityFactory to Produce Charque Dried Salted Meat (with Carcass Reception) with capacity for 5.000 Kg/day.
Business plant Factory to Produce Concentrated Fruit Pulp with capacity for 1.000 Kg/day.
Project Industry of Ice Production with capacity for 2.000 Kg/day, in bars or cubes, in a built area of 120 m².
How to start Factory for Manioc Fecula with capacity of 100.000 kg of Raw Material/day.

Project - how to start Factory Fruit Improvement with capacity for 10.000 Kg per day.