Ready project Factory Fruit Improvement with capacity for 10.000 Kg per day.

CODE - VEG-F-012

Ready project Factory Fruit Improvement with capacity for 10.000 Kg per day.

CODE - VEG-F-012


Project ready with:


Industry with the following sections:

Reception
Cleaning and Selection
Area para Washing
Cold Chamber for Stocking (02 units)
Processing Room
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Fruit Improvement

How to start Factory Fruit Improvement with capacity for 10.000 Kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Fruit Improvement

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Fruit Processing Unit Construction | How to Set Up a Microbrewery Project | Ready Work2c How to Set Up a Poultry Farm | Shampoo Legislation for Production | Raw Material Soap Stone | Names of electrical supply stores | How Much Does It Cost to Set Up an Oil Change Shop | Agricultural Store Facade | Steps to Setting Up a Retail Store | What Is The Investment To Open A Lingerie Store | I Want to Set Up a Chewing Gum Factory | How to Set Up a Meat and Sausage Distributor | Nursery Floor Plan Drawing | Dairy Farm.dwg | Reception of Meat in the Production Room | Hospital Model Dwg | Incineration in Other Countries - Hospital Waste | How to Make a Hospital Incinerator | Lan House Project | Raw Material for Supplying Marmitex | Basic Budget for Building a Gas Station | Snack Bar Assemblies | How to Set Up a Relaxing Massage Project | Syringe Assembly Machine | Marble Production Countries | Jeans Factories and Distributors | How to Set Up a Plaster Factory | Production Sector of a Plastic Cup Factory | Styrofoam Financial Aspects | Licensing for Briquette Factory | Project for Manufacturing Wooden Pallets | How to Set Up a Plaster Factory | How to Make Wet Wipes | How to Start an Aluminum Recycling Business | Gas cylinder manufacturing | Provision of Clinical and Pathological Analysis Laboratory | Countries That Produce the Most Cheese | Good Practices Manual for Drugstore | Automotive Paint Revitalization | Egg Manufacturers in Powder in Samta Catarina | Hospital Project Manual | How to Set Up a Gas Distributor | How Much Does It Cost to Build a Warehouse | Law Office Model Facade | Bathroom Plan Template With Exhaust Fan Autcad | Isotc3b4nico Production | Machines for Making Frozen French Bread Dough | Ostia Production | Flour Factory | Setting Up a Small Roastery | How to Set Up a Passion Fruit Juice Factory | Dog Hotel Models |

 

Other projects ready:

How to start Tire Recapping with capacity for 1.000 tires per day.
Project Charque factory with area of 541 m² (647 sq.yd).
PDF Cold Storage Room to Produce and Dry Shark Fin and Fishes Swim Bladder with capacity to Produce 10.000 Kg/day.
Plant and layout Factory for Corn Flour production with capacity of 8.000 kg/day and 400 m2 (478,4 sq.yd.) area.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with Blue mould (Roquefort, Gorgonzola), Cheese with White mould (Camembert, Brie), with capacity of 5000 liters/day.
Project Shed for Bovine Confinement (Milk Cattles) in a Confinement Regime, with capacity for 250 animals and area of 1.000 m² and Mecanic Milking for 12 animals (area with 200 m²).
FeasibilityClothing Industry to Produce Shirts with capacity for 200 garments/day.
Business plant Factory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 10.000 Kg per day.
Project Tanning Ostrich Skin with capacity to Produce 2.000 Skins per day.
How to start Slaughter area for Frog, with area of 200 m² (239,2 sq.yd) and capacity for 1.000 kg of Frogs/day.

Project - how to start Factory Fruit Improvement with capacity for 10.000 Kg per day.