Ready project Slaughterhouse Alligator with capacity for 100 animals per day.

CODE - FRE-021

Ready project Slaughterhouse Alligator with capacity for 100 animals per day.

CODE - FRE-021


Project ready with:


Industry with the following sections:

1º Floor:
Alligator Stunning
Evisceration
Inspection
Pre-Chamber
Freezing Tunnel
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Sector
Cold Chamber for Small Guts
Small Guts Packing
Guts and Small Guts Expedition
Lower Floor:
Rendering Reception Sector

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Alligator

How to start Slaughterhouse Alligator with capacity for 100 animals per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Alligator

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Alligator Slaughter Inspection | Alligator Stunning | Alligator Stunning | Alligator Evisceration | Investments for Jacare Cold Storage Plant | Alligator Stunning | Alligator Slaughter Inspection | Plants Warehouse Eggs | Lipstick Packaging | Goat Breeding | A Blueprint for a Feed Store | Tire Shop Financing | How to Set Up a Natural Gas Station | How to Open a Rotisserie | How to assemble an aluminum and acrylic shower enclosure | Shoe Store Project Description 28What It Is What It Does29 | Drug Distributor Production Table | Provision of basic food basket | Floor Plan School Models | Economic and Sanitary Manual for Refrigerators | Physical Design of a Hamburger Factory | Floor Plan of a Cold Room | How to Set Up a Birthing Waiting Room Lecture | Health Unit Floor Plan Template - PSF | Physical Plan of an Emergency Room Unit | Buffet Project Template | Guesthouse Room Design | C3b4nico Mexican Restaurant Project | Open a Nightclub | Physical Structure of a Car Wash | Organizational Chart in Children's Buffet | Production Flow in the Pharmaceutical Industry | Brita Flowchart | How to Make an Organizational Chart for a Clothing Factory | Cowhide Glove Manufacturing Process | How to Start a Sticker Business | Plastic Ruler Manufacturers | I Want to Make Toys | Drawing Templates for Writing on Wooden Car Bodies | Cement Artifacts Factory Floor Plan | I Want to Open a Kite Supply Store | Frame Production | Machining workshop | Dentalis Protetics - Dental Prosthesis Laboratory Program Torrent | Chocolate Production Machine | Good Laboratory Practices Manual for Dairy Products | .Hot Dog Carts | Food Recall Procedure Template | How to Make a Food Recall Pop | Florist Models | How to Start a Service Business | Game Development Business Plan | Accounting Office Plans | Example of Maintenance Pop in Fire Extinguishers | Layout of a Flower Company | Set Up Pig Farm | Cost of Setting Up a Cake Shop | Biscuit Factory Flowchart | Home Business Ideas | Cupuaçu Processing | Chili Sauce Factory Project | Bakery .dwg |

 

Other projects ready:

How to start Factory to Produce Cotton Yarn Bandage (with sterilized in autoclbird) with capacity for 100.000 bandages per day.
Project Slaughterhouse Turkey with capacity for 100 animals per day.
PDF Factory to Produce Wood Briquette with capacity for 3.000 Kg/day.
Plant and layout Educational and Psycho-Social Establishment Service (APAE), with an area of 1.200 m².
Project Pre-School with capacity for 500 children per day.
Project Self Service Restaurant with capacity for 50 meals per day.
FeasibilityFactory to Produce Pasteurized Liquid Egg with capacity for 1.000 liters/day.
Business plant Clothing Industry to Produce Lingerie with capacity for 50 garments/day.
Project Cold Storage Room for Frozen Fish and Fish Products with area of 260 m² (310,96 sq.yd) and capacity for 3.000 kg/day.
How to start Factory of Pickles with production capacity of 3.000 kg/day and 200m² (239,2 sq.yd.) area.

Project - how to start Slaughterhouse Alligator with capacity for 100 animals per day.