Ready project Factory Malt Roasting with capacity to produce 3.000 Kg per day.

CODE - VEG-155

Ready project Factory Malt Roasting with capacity to produce 3.000 Kg per day.

CODE - VEG-155


Project ready with:


Industry with the following sections:

Reception Platform
Storage of Raw Material
Toasting
Employees Entrance
Storage for Packages
Storage for Packed Product
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Malt Roasting

How to start Factory Malt Roasting with capacity to produce 3.000 Kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Malt Roasting

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Malt Roasting | Bar Soap Company Project | Layout for electrical stores | Oil Change Projects | Agricultural Store Design | Layout Company Commerce | Resale of Oriental Lighting | Lingerie Store Pre-Project | Raw Material Chewing Gum | How to Set Up a Cleaning Products Distributor | Daycare Building Floor Plan | How to Set Up a Small ETE Treatment Plant | Meat Warehouse Project | Fish Filleting Flowchart | How Much Does It Cost to Set Up a Hospital | How to Set Up an Incineration Company | How to Build an Incinerator | Financial Planning for a Motel | Floor Plan for Setting Up a Lan House | Supply of lunch boxes for construction sites | Convenience Store Layout | Cafeteria Design Template | Massage Space Opening Project | Concrete Syringe Model. | Synthetic Marble Factory | Business Plan for Opening a Jeans Manufacturing Company | Set up a plaster factory | How to Set Up a Plastic Cup Manufacturing Company | Sandblasting Project | I Want to See the Squeegee Factory | Board Production | How to make a vibrating table | Wet Wipes Manufacturing | Aluminum Manufacturing and Recycling | Gas Cylinder Factory in Caxias | I Want to Open a Clinical Analysis Laboratory | Laboratory Assembly for Dairy Products | Epis Budget Template | Material for Revitalizing Paintings | Canned Egg Producers | Company Operating Procedures Manuals | Activities of a Gas Distributor | Hydroponics Shed | Company Plan Administration | Ready Engineering Projects | Frames Workshop | Name for Cleaning Company | How to Make Isotonic | Bakery Flowchart and Layout | Production Capacity Of A Wafer Machine | Fruit Pulp Industry Floor Plan | Rice Flour Making Machinery | Orange Juice Manufacturers In Minas Gerais | How to Set Up a Dog Hotel |

 

Other projects ready:

How to start Factory to Produce Macaroni for Fresh and Dry Pasta with capacity for 500 kg/day.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 3.000 Kg/day.
PDF Swine Farm (with Overlapping Bed) with capacity to Produce 784 Matrix.
Plant and layout Slaughterhouse Horses with capacity for 10 animals per day.
Project Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 30.000 Kg/day.
Project Factory to Produce Chicken Sausages and Sliced Chicken with capacity for 3.000 Kg/day.
FeasibilitySlaughterhouse Ostrich Slaughter with capacity for 500 animals/day.
Business plant Comercial Laundry with capacity for 3.000 kg of Clothes per day.
Project Factory to Produce Grain Alcohol (Rice and Corn) with capacity for 10.000 liters/day.
How to start Café with capacity for 300 people.

Project - how to start Factory Malt Roasting with capacity to produce 3.000 Kg per day.