Ready project Factory Milk Powder Packing with capacity for 3.000 Kg/day.
CODE - LTC-094-B
Ready project Factory Milk Powder Packing with capacity for 3.000 Kg/day.
CODE - LTC-094-BProject ready with:
Industry with the following sections:
Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory Milk Powder Packing
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory Milk Powder Packing with capacity for 3.000 Kg/day.
- Business plan for Factory Milk Powder Packing with capacity for 3.000 Kg/day.
- 3D project of Factory Milk Powder Packing with capacity for 3.000 Kg/day.
Projects with other capacities
Factory Milk Powder Packing
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Ice Packing Room | Goat Farm | Photography Shop Project | Example of an Organizational Chart for a Tire and Service Store | Rotisserie Business Plan | Open a Plastering Company | How Much Does It Cost To Set Up A Fabric Store | Distributor Floor Plan | How to Set Up a Food Basket Business | How to Open a Driving School | Beef Cold Storage Plant Construction | Floor Plan 150m2 Cad | Multi-Sport Gym Project Model | Pop27s Template for Gynecology Office | Nursing Memorial Template | Emergency Care Model in UBS | Table Design For A Lunch For 200 People | Model of Inn Floor Plans | How to Set Up a Hospital Kitchen | How to Open a Dance Club | Buffet Project Template | A Pharmaceutical Industry Organizational Chart Template | Mattress Factory Layout | Clothing Manufacturing Organization Chart | Uniform Production Flowchart | How to Make Nonwoven Bags | Styrofoam Tray Manufacturers | School Models Production Factory | Wood Squaring Machine | Concrete Posts and Wire Mesh | Kite Making Machines | List of Equipment for Assembling Aluminum Windows | How to Assemble a Zinc Plating Plant | Typodont Prosthesis Laboratory Assembly | Yogurt Ice Cream Company | Pop Disinfestation | Setting Up an Alignment Company | Standard Operating Procedure in Marble Industry | Restaurant Standard Operating Procedures Manual | Layout Model Area 300 Square Meters | I Want to Open a Healthcare Service Company | Vehicle Rental Financing Project | How to Open a Machine Representation | Street Cleaning Service Quote Template | Farm Physical Layout | Project for a confectionery shop | Biscuit Factory Plant | Bean Cleaner and Sorter | Budget for Fruit Processing Unit | Making Hot Sauces | Organizational Chart for Pet Shop Company |
Other projects ready:
How to start Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 3.000 Kg per day.
Project Clothing Industry to Produce Upholstery with capacity for 50 garments/day.
PDF Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Concrete Lamppost with capacity for 100 units/day.
Project Photographic Studio with an area of 50 m2.
Project Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
FeasibilityFactory to Produce in Natura Pepper with capacity for 5.000 Kg/day.
Business plant Sports Gym (Polysportive) with capacity for 2.000 people, to be Built in Lean Land.
Project Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 1.000 Kg/day.
How to start Factory to Produce Cachaça (Liquor) made from Manioc with capacity for 1.000 liters/day.



