Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Alcohol Gel with capacity for 300 liters/day.
CODE - IND-070
Ready project Factory to Produce Alcohol Gel with capacity for 300 liters/day.
CODE - IND-070
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Milling
Fermentation
Distillation
Packages
Storage for Finished Products
Expedition
Office
Dressing Rooms
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Alcohol Gel
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Alcohol Gel with capacity for 300 liters/day.
Business plan for Factory to Produce Alcohol Gel with capacity for 300 liters/day.
3D project of Factory to Produce Alcohol Gel with capacity for 300 liters/day.
Projects with other capacities
Factory to Produce Alcohol Gel
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How to Set Up an Alcohol Company
|
Alcohol Industry Business Plan
|
How to Set Up an Alcohol Gel Industry
|
Alcohol Gel2c Porto Alegre2cfactory
|
How to Set Up a Factory to Produce Alcohol Gel
|
Microbrewery Plant
|
Flowchart for Opening a Farm
|
How to Make a Disinfectant Factory
|
How to Set Up a Soap Factory
|
Business Plan for an Electrical Supplies Store
|
How Much Does It Cost To Open A Lubricant Store?
|
How to Open a Celiac Products Company
|
I Want to Open a Retail Store2cHow to Open
|
How to Set Up a Pool Product Store
|
Name for Country Stores
|
Coconut Bullet Machine
|
How to Open a Meat Distribution Company
|
Hospital Nursery Laws
|
Mini Water Treatment Plant Dwg
|
Making Cracklings with Cracklings
|
Fish Refrigerator Technology
|
How to Open an APAE
|
What is the Investment Value to Open a Hospital Waste Collection Company?
|
Factory Of Insenadoras
|
Motel Floor Plan Pdf
|
Lan House Floor Plan
|
Marmitex Kitchen Assembly
|
Gas Stations Budget
|
Cafeteria Floor Plan With Layout
|
Model of a Massage Therapy Clinic Floor Plan
|
Ethylene Oxide Machines
|
Synthetic Marble Sinks
|
Raw Materials for Making Jeans
|
Plaster Mold Manufacturer
|
How to Set Up a Glass Factory
|
Styrofoam Production
|
Briquette Manufacturing
|
How to Start a Pallet Manufacturing Company
|
What It Takes to Set Up a Plaster Factory
|
Raw Material for Wet Wipes
|
aluminum tank model
|
Making a Gas Cylinder
|
How to Set Up Soil Analysis Laboratory
|
Floor Plans for Dairy Building
|
Good Manufacturing Practices Manual
|
Automotive Painting Plant
|
Egg Powder Factory
|
Pop Template For Hospitals
|
LPG Tanks In Dwg
|
How to Build a Shed in CAD
|
Open Exchange Agency
|
Law Firm Flowchart Template
|
Refrigerator Repair Shop Project
|
How to Set Up a Notary Office
|
Open an Energy Factory
|
Bakery Production Flow
|
How to Set Up a Tortilla Factory
|
How to Set Up a Palm Heart Bottling Factory
|
Cost to Set Up Coffee Roasting
|
Juice Industry Planning
|
Dog Hotel Plans
|
Other projects ready:
How to start Factory to Produce Humid handkerchiefs with capacity for 10.000 units per day.
Project Factory to Produce Mate Tea and other Teas, Bottled in Plastic Bottles PET and Plastic Cups with capacity for 5000 liters per day.
PDF Chinese Kitchen with capacity for 300 meals per day.
Plant and layout Factory to Produce Clothes Peg with capacity for 500 Kg/day.
Project Factory for Betterment and Drying of Rice with 1.000m² (1196 sq.yd.) area and capacity of 25.000 kg/day.
Project Factory to Produce Bran Fodder for Fishes, Cats and Dogs with capacity for 2.000 Kg/day.
FeasibilitySterilization Unit (by Ethylene Oxide) with capacity for 5.000 Units per day.
Business plant Factory to Produce Pasteurized Orange Juice with capacity for 15.000 liters per day.
Project Factory to Produce Cashew Nut with capacity for 10.000 Kg/day.
How to start Installations for Mushroom Cultivation (Champignon) with capacity for 3.000 Kg per day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US