Ready project Factory to Produce Alcohol Gel with capacity for 300 liters/day.

CODE - IND-070

Ready project Factory to Produce Alcohol Gel with capacity for 300 liters/day.

CODE - IND-070


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Milling
Fermentation
Distillation
Packages
Storage for Finished Products
Expedition
Office
Dressing Rooms
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Alcohol Gel

How to start Factory to Produce Alcohol Gel with capacity for 300 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Alcohol Gel

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Factory to Produce Alcohol Gel | How to Set Up an Alcohol Gel Industry | Alcohol Gel2c Porto Alegre2cfactory | Alcohol Industry Business Plan | How to Set Up an Alcohol Company | Microbrewery Plant | Flowchart for Opening a Farm | How to Make a Disinfectant Factory | How to Set Up a Soap Factory | Business Plan for an Electrical Supplies Store | How Much Does It Cost To Open A Lubricant Store? | How to Open a Celiac Products Company | I Want to Open a Retail Store2cHow to Open | How to Set Up a Pool Product Store | Name for Country Stores | Coconut Bullet Machine | How to Open a Meat Distribution Company | Hospital Nursery Laws | Mini Water Treatment Plant Dwg | Making Cracklings with Cracklings | Fish Refrigerator Technology | How to Open an APAE | What is the Investment Value to Open a Hospital Waste Collection Company? | Factory Of Insenadoras | Motel Floor Plan Pdf | Lan House Floor Plan | Marmitex Kitchen Assembly | Gas Stations Budget | Cafeteria Floor Plan With Layout | Model of a Massage Therapy Clinic Floor Plan | Ethylene Oxide Machines | Synthetic Marble Sinks | Raw Materials for Making Jeans | Plaster Mold Manufacturer | How to Set Up a Glass Factory | Styrofoam Production | Briquette Manufacturing | How to Start a Pallet Manufacturing Company | What It Takes to Set Up a Plaster Factory | Raw Material for Wet Wipes | aluminum tank model | Making a Gas Cylinder | How to Set Up Soil Analysis Laboratory | Floor Plans for Dairy Building | Good Manufacturing Practices Manual | Automotive Painting Plant | Egg Powder Factory | Pop Template For Hospitals | LPG Tanks In Dwg | How to Build a Shed in CAD | Open Exchange Agency | Law Firm Flowchart Template | Refrigerator Repair Shop Project | How to Set Up a Notary Office | Open an Energy Factory | Bakery Production Flow | How to Set Up a Tortilla Factory | How to Set Up a Palm Heart Bottling Factory | Cost to Set Up Coffee Roasting | Juice Industry Planning | Dog Hotel Plans |

 

Other projects ready:

How to start Normal Birth Center with an area of 250 m².
Project Arabic Kitchen with capacity for 300 meals per day.
PDF Slaughterhouse Cold Meat Production (sausage, cooked ham, jerked beef) with an area of 250 m² and capacity for 5000 kg/day - Carcass Reception
Plant and layout Factory Casting of Cinereous Iron with capacity for 500 Kg/day.
Project Factory to Produce Barbecue Coal with capacity for 500 Kg/day.
Project Milk and Dairy Industry Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas standard, Cobocó), Cheese with Blue mould (Roquefort, Gorgonzola), Cheese with White mould (Camembert, Brie), with capacity of 2000 liters/day.
FeasibilitySlaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
Business plant Factory to Produce Fresh Dough for Pizza with capacity for 1.000 Kg/day.
Project Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 50.000 Kg per day.
How to start Factory to Produce Pepper and Pepper Sauce (in Natura Pepper, Canned Pepper, Dry Pepper, Red Pepper Flakes Calabresa Pepper) with capacity for 5.000 Kg per day.

Project - how to start Factory to Produce Alcohol Gel with capacity for 300 liters/day.