Ready project Factory to Produce Caipirinha Drink with capacity for 5.000 liters/day.

CODE - AGR-013

Ready project Factory to Produce Caipirinha Drink with capacity for 5.000 liters/day.

CODE - AGR-013


Project ready with:

Industry with the following sections:

Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Caipirinha Drink

How to start Factory to Produce Caipirinha Drink with capacity for 5.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Caipirinha Drink

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Caipirinha Business Plan | How to Design a Company Cafeteria | Cream Factory | List for a Plumbing Shop | Proger Set Up Store | Design Templates for Setting Up Gas Stations | Flowchart of a Juice Bar | Single Price Stores 12c50 | Haberdashery Projects | Crispy Peanut Butter Production Line | Pharmacy Mockup Templates | How to recycle automotive oil | How to Set Up a Remote Study Room | Fish Freezing Tunnel | How Much Does It Cost to Set Up a Football Society? | Set up a Radiology Dentistry Clinic Price | Office Facade | Industrial Restaurant P2f Layout Template | Setting Up a Spa in a Hotel | Initial Cost of Setting Up a Pizza Delivery | How to Get Financing to Open a Nursing Home | How to Set Up a Retirement Home | Plants for the Pharmaceutical Industry | How to Set Up a Marble Shop | Citronella Essential Oil Distributor | Raw Material For Bikinis | How Much Does It Cost to Open a Shoe Factory | Manufacture Fiberglass Pool | Carpentry Budget Template | Block Manufacturing Projects | Barbecue Grill Projects Dwg | Install Industrial Flooring | Beer Can Maker | Budget and Microbiology Laboratory | I Want to Set Up a Cheese Factory Where Can I Buy the Machinery | Lean Laundry Project | Bodywork and Painting Supplies Stores | List of Construction Materials for Skate Park | Pop Pharmacy and Drugstore Ready | Hygiene Procedures in Industry | Podiatry Price List | Travel Agency Organization Chart | Artesian Stations Set Up Small Business Big Business | How to Set Up a Computer Workshop | Landscaping Company Organization Chart | What It Takes to Set Up a Pet Food Business | Flowchart of a Tile Factory | Equipment for Producing Sliced Bread | Snack Manufacturing Machinery | Mushroom Greenhouse Cleaning | Machine to Produce Banana Raisins | Pharmaceutical Industry Floor Plan Template |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups with a machine to make PET Bottles.
Project Factory to Produce Fresh Dough for Pizza, setting up for Pizza (Filled and Frozen) and Dough for Pastry with capacity for 3.000 Kg/day.
PDF Small Factory to Produce Cashew Nut with capacity for 700 Kg/day.
Plant and layout Slaughterhouse for bovines slaughter and Charque - 75 animals/day - area of 1.000 m² (1196 sq.yd).
Project Cold Meat Production (Bovines, Swines, Caprines, Ovines and Ostrich) with Deboned Meat Reception and capacity to produce 20.000 Kg/day
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Packed Milk types B and C, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day.
FeasibilityFactory to Produce Jelly Fruit with capacity for 5.000 Kg/day.
Business plant Factory to Produce Dough of Baked and Frozen Cheese Bread with capacity for 1.000 Kg/day.
Project Factory to Produce Pierced Bricks with capacity for 30.000 units per day.
How to start Milk and Dairy Industry to Produce Ultrafiltration Brie Cheese with capacity for 100.000 liters of Milk per day.

Project - how to start Factory to Produce Caipirinha Drink with capacity for 5.000 liters/day.