Ready project Factory Galvanoplasty with capacity for 5.000 Kg/day.

CODE - IND-T-014

Ready project Factory Galvanoplasty with capacity for 5.000 Kg/day.

CODE - IND-T-014


Project ready with:

Industry with the following sections:
Reception Platform
Storage of Raw Material
Unit Preparation
Galvanoplasty
Packages
Storage for Finished Products
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Galvanoplasty

How to start Factory Galvanoplasty with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Galvanoplasty

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Electroplating Layout | How to Set Up a Galvanizing Factory | How Much Does It Cost to Set Up an Electroplating Company? | Zinc Plating Laboratory Layout | Electroplating Company Project | How to Define a Layout for an Electroplating Laboratory | Electroplating Company Layout | Electroplating Schedule Layout | How to Set Up a Galvanizing Process | Electroplating Project | Zinc Plating Process Layout | Set Up a Business With 5,000 Reais | Electroplating Laboratory Assembly | What Is The Layout Of An Electroplating Company? | How to Set Up an Electroplating Laboratory | Layout Techniques for Factories | Electroplating Company Construction Project | Electroplating Costs | Process Layout of an Electroplating Company | Electroplating Laboratory | Layout of an Electroplating Company | Electroplating Laboratory Model | Electroplating Laboratory | P2f Electroplating Layout | Galvanizing Layout Template | Electroplating Laboratory | Electroplating Line Assembly Model | How to Make a Layout for Electroplating | Electroplating Plant Company | Electroplating Company Layout | Set Up Galvanizing Process Company | Electroplating Layout | Electroplating Laboratory | Assembly Process Electroplating | Electroplating Layout | Electroplating Laboratory Layout | How to Set Up a Galvanizing Factory | Electroplating Laboratory Layout Example | Pop Electroplating | Electroplating Layout | Electroplating Laboratory Layout | How to Set Up a Galvanizing Factory | Layout of an Electroplating Laboratory | Electroplating Projects | Galvanizing Company Layout | Project for Selling Artisanal Chocolates | Cleaning Products Industry Design Layout | Setting Up a Music Instrument Store Is Difficult | How to Start a Lubricant Resale Business | Tobacco Shop Floor Plan | Organizational Chart of a Company That Makes Snacks | Layout of a Utility Store | Investment Clothing Rental | Business Plan for a Fruit Pulp Distributor | Energy Drink Distributor Model | Business Plan for a Rubber Recycler | How to Set Up a Technical Course School | Meat Receiving Flowchart | Inspection of Horses at Slaughter | How to Set Up a Nursing Lab | Radiological Standard Operating Procedure | How to Set Up a Dental Clinic | What Do I Need to Set Up a Movie Theater Cost? | How to Open a Campsite | Online Gas Station Financing | Timeline for a Home to Set Up a Retirement Home | Dimensions of a Beauty Clinic Building | Wiring Factory Projects | Candle Factory Production Capacity | Materials for Making Stuffed Animals | How to Set Up an Underwear Factory | Designs for a Sandals Company | How to Assemble a Picture Frame | Toothpick Machine Project | Model Aircraft Manufacturers | Precast Slab Factory | Layout for Watch Manufacturing | How Much Does It Cost to Set Up a Pottery Factory? | Electroplating Equipment | Tips for Setting Up a Laboratory | Dairy Plant for Yogurts | Industrial Laundry Price List | Financing for Motorcycle Workshop | Golf Financing | Product Traceability and Recall Model | Setting up rodeo parks | Set Up a Sewing Studio | Start a Reforestation Company | How to Set Up a Theodolite | Cost of Materials to Set Up a Bicycle Repair Shop | Epoxy Installation | Fertilizer Factory Layout | Roof Tile Factories In China | How to Set Up a Cake Factory | Equipment for Setting Up a Coffee Roasting Plant | How to Start a Seasoning and Condiment Business | What You Need to Set Up a Farofa Factory | Budget for Setting Up a Veterinary Clinic |

 

Other projects ready:

How to start Industry to Produce Footwear with capacity for 50 pairs/day.
Project Factory to Produce Sparkling Wine, with capacity for 500.000 liters/year.
PDF Clothing Industry to Produce Coarse Linen Shorts (cotton and flax) with capacity for 500 garments/day.
Plant and layout Slaughterhouse for Bovines and Swines - 100 animals/day - area of 950 m² (1.136,2 sq.yd).
Project Factory to Produce Dehydrated Fruits with capacity for 500 Kg/day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 3.000 Kg/day.
FeasibilityHostel with capacity for 300 Alojamentos.
Business plant Factory to Produce Grape Juice, with capacity for 10.000 liters/day.
Project Industry Mineral Water Bottling with capacity for 40.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, with capacity of 6000 liters/day.

Project - how to start Factory Galvanoplasty with capacity for 5.000 Kg/day.