Ready project Factory to Produce Caramels with capacity for 3.000 Kg/day.

CODE - DC-013

Ready project Factory to Produce Caramels with capacity for 3.000 Kg/day.

CODE - DC-013


Project ready with:

Industry with the following sections:
Reception Platform for Raw Material and Ingredients
Storage for Raw Material
Storage for Ingredients
Manufacture Room
Packaging Room
Storage for Finished Products
Storage for Cleaning Material
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Caramels

How to start Factory to Produce Caramels with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Caramels

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Caramel Production | How to Set Up a Bar Soap Factory | Building Materials Store Layout Example | Oil Change Shop Installation Project | Set up an agricultural company | How to Set Up a Retail Store | Gas Cylinder Station Construction Plan | Lingerie Stores In Poços De Caldas | How to Make Dairy | How to Set Up a Daycare Center for Children | How to Make an Ete | How to Make Jerked Beef | Filleting Companies | Hospital Floor Plan and Project | How to Set Up a Radiology Company | Setting Up an Audiology Practice | Motels Under Construction | DWG Plan Of A Lan House | Marmitex Supply Company | Sebrae How to Set Up a Gas Station | Snack bar-projects | How to Start a Massage Business | Productive Flowchart of a Medicine Distributor | Synthetic Marble Factory In Sp | Jeans Manufacturing Email | Project to Set Up a Printing Shop | How to Set Up a Soda Straw Maker | Sandblasting Assembler Model | Clothespin Assembly Work From Home | Lowest Price Vibrating Table For Making Concrete Post | Wet Wipes 500 | Electroplating Laboratory | Description of the Gas Cylinder Manufacturing Process | What Equipment Is Needed to Set Up a Clinical Analysis Laboratory? | Cheese Making Machine | Setting Up an Epis Company | How to Open a Windshield Repair Shop | Canned Quail Manufacturing | Hospital Pop Development | What is needed to open a beauty center? | How to Set Up a Hydroponic Project | Condominium Management Company Organizational Chart Template | Engineering Office Floor Plan Template | Computer Printed Budget Template | Cleaning Service Provider Company | Soft Drink Factory Physical Arrangement | Bread Production Flowchart | Gnocchi Production Brazil | Dried Fruit Production | How Much Does It Cost To Open A Grain Packaging Factory | Juice Company How to Set Up Step by Step | Project to Build a Kennel |

 

Other projects ready:

How to start Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 30.000 Kg/day.
Project Factory to Produce Jelly with capacity for 500 Kg/day.
PDF Slaughterhouse Swines Slaughter and Cold Meat Production (Sausages, Hams, Cold Meat and Smoked Products) with capacity to Slaughter 300 animals/day.
Plant and layout Factory to ProProduce Fruit Sweet in Syrup with capacity for 3.000 Kg/day.
Project Factory to Produce Dry Coconut Grated with capacity for 3.000 Kg per day.
Project Factory to Produce Vinegar made from Banana with capacity for 500 liters/day.
FeasibilityConfectionery with capacity for 500 Kg/day.
Business plant Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 1 Block per Week.
Project Factory to Produce Fresh Dough for Pizza and setting up for Pizza (Filled and Frozen) with capacity for 3.000 Kg/day.
How to start Factory to Produce Organic Cheese for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela) and Yoghurt with an area of 200 m2 and capacity for 5.000 liters/day.

Project - how to start Factory to Produce Caramels with capacity for 3.000 Kg/day.