Ready project Factory to Produce Crystallized Candies with capacity for 5.000 kg/day.

CODE - DC-062

Ready project Factory to Produce Crystallized Candies with capacity for 5.000 kg/day.

CODE - DC-062


Project ready with:

Industry with the following sections:
Fruit Reception Platform
Processing (dirty area)
Room for Candy production (Clean area)
Storage for Finished Products
Reception for Useless products (rinds and seeds)
Cold Chamber
Ingredients Storage
Packaging Storage
Packaging
Expedition
Boiler
Offices
Room for the Inspector
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Crystallized Candies

How to start Factory to Produce Crystallized Candies with capacity for 5.000 kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Crystallized Candies

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Water Crystallization Models | Where to Buy Crystallized Sweets Online | How to Layout a Candy Company | Crystallized Sweets Factory | Crystallized Factory | How to Set Up a Crystallized Sweets Shop | Best Production Layout for a Confectionery | Candy Manufacturing Consulting | Where Do I Need to Register a Company for the Manufacture and Trade of Crystallized Sweets? | Layout of a Candy Company | Water Crystallization Model | Rice Powder Industry Projects | Open Mobile Store | What Do I Need to Set Up a Fishing Tackle Store? | Bank Agency Organization Chart | On Setting Up A Candy Store | Clothing Stores Projects | Peanut Technology | Consulting for Setting Up a Compounding Pharmacy | Milk Effluent Treatment | How to Set Up a Swim | Cost of assembling a pig slaughterhouse | Pie Machine | Campos Society Feasibility Study | Surgical Center Drawings | What Equipment Is Needed to Set Up a Physiotherapy Clinic | How to Draw a Gym Layout | Construction of a brewery | Physical Layout of a Gym | How Much Does It Cost to Set Up a Bowling Alley? | Car Wash Plant | How to Open a Chemical Analysis Company | Wax Crayon Manufacturing | How to Start a Computer Embroidery Business | How Beneficiation is Carried Out | Example of an Organizational Chart for a Plastic Company | Plants for Porcelain Factory | Sells Autoclave For Wood | Costs of Setting Up a Precast Factory | Projects with Slot Cars | Candy Mold Making Machine | Washer Production | Floor Plan of a Dulce de Leche Industry | Roquefort Cheese Production Flowchart | Project for manufacturing trunk | List of Materials for Popular Homes | Pop Medicine Industry | Standard Operating Procedures in Clinical Analysis Laboratories | Bus Company Business Plan | I would like to set up a fast delivery company | Restaurant Graphics | How to Set Up a Cleaning Project for a Company | Organizational Chart for Ice Cream Companies | Pastel Model Project | Materials for Assembling a Hydroponics Greenhouse | Automated Production Processes | How to Make Ice From Cocc3b4 Water | Food Company Business Plan | How to Set Up a Crematorium for Animals |

 

Other projects ready:

How to start Tanning for Ostrich Skin, with capacity for 10 to 20 Skins per day and built area of 300 m².
Project Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 100.000 Units per day.
PDF Factory to Produce Acerola Pulp (Barbados cherry) with capacity for 500 Kg per day.
Plant and layout Slaughterhouse Swines with capacity for 20 animals per day, to Produce Cold Meat and Lard.
Project Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 2 Blocks per Week.
Project Cold Meat Production (Bovines, Swines, Caprines, Ovines and Ostrich) with Deboned Meat Reception and capacity to produce 3.000 Kg/day
FeasibilitySlaughterhouse Ovines with capacity to slaughter 5 animals/day.
Business plant Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 50.000 Units per day.
Project Cosmetic Factory, with an area of 200 m², to Produce Cosmetics in General, Cologne, Shampoo and Deo Cologne.
How to start Natural Kitchen with capacity for 1.000 meals per day.

Project - how to start Factory to Produce Crystallized Candies with capacity for 5.000 kg/day.