Ready project Frog Meat Processing with capacity for 3.000 frogs per day.

CODE - FRIG-214

Ready project Frog Meat Processing with capacity for 3.000 frogs per day.

CODE - FRIG-214


Project ready with:


Industry with the following sections:

Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Frog Meat Processing

How to start Frog Meat Processing with capacity for 3.000 frogs per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Frog Meat Processing

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Meat Expedition | Meat Processing Project | Ra Processing | Frog Processing | Hair Dye Manufacturing Process Flow Chart | How to Start a Hardware Business | Ready-made Business Plan for Cosmetics Store | Equipment for Setting Up a Gas Station | How to Set Up a Juice Bar | Project to Open a Gardening and Landscaping Company | Sell Surf Shop | Gingerbread Flowchart | How Much Does It Cost to Set Up a Compounding Pharmacy | Rubber Powder Factory | Set up a children's space | Fish Freezing Tunnel | Campos Society Projects | Floor Plan Model of an X-ray Clinic | Model Dental Office | What is needed for an industrial kitchen? | Lottery Name | Pizza Dial Projects | Nursing Home Projects | Ceramic Manufacturers for Aromatherapy | Floor Plan Model of a Pharmaceutical Industry | Download Marble Cutter Project | Biscuit Dough Factory | Bikini Making Machine | Floor Plan of a Shoe Company | Cell Phone Case Suppliers | Registration for Environmental License for Charcoal Packaging | Woodworking Bed Designs | Concrete Block Manufacturing Project | Wood Oven and DWG | Machine To Make Ceramic Floors | Nursery Manufacturing | Cleaning of Food Industry Laboratories | Cheese Production Flowchart Template | How to Set Up a Jeans Factory | Build Skate Park | Pop De Farmacia Water Tank Cleaning | Ppho Registration Template 9 | Podiatry Room Model | Travel Agency Floor Plan | Well Construction | How to Set Up an Appliance Repair Shop | Set Up a Cleaning Company | Flowchart for Pet Food Manufacturing | Ceramic Brick Layout | First Company Financing Padaria2727 | Permabuco Corn Snack Factories | How to Grow Mushrooms | How to Set Up a Banana Raisin Factory5d | How to Set Up a Pharmaceutical Industry |

 

Other projects ready:

How to start Factory to Produce Cachaça (Liquor) made from Manioc with capacity for 3.000 liters/day.
Project Factory to Produce for Corn Juice with capacity for 1.000 liters per day.
PDF Tanning Cattle Hides with capacity for 300 Hides/day.
Plant and layout Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Project Industry Phytotherapical Products and Food Supplements with an area of 2.500 m².
Project Clothing Industry to Produce Shirts with capacity for 50 garments/day.
FeasibilityIce Cream Parlor with an area of 100 m2.
Business plant Slaughterhouse for Swine - 75 animals/day - area of 800 m² (956,8 sq.yd).
Project Factory to Produce Broom Handle with capacity for 13.000 units per day.
How to start Factory for Corn Snacks with 150m² (179,4 sq.yd.) area and capacity of 1.000 kg/day.

Project - how to start Frog Meat Processing with capacity for 3.000 frogs per day.