Ready project Frog Meat Processing with capacity for 3.000 frogs per day.

CODE - FRIG-214

Ready project Frog Meat Processing with capacity for 3.000 frogs per day.

CODE - FRIG-214


Project ready with:


Industry with the following sections:

Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Frog Meat Processing

How to start Frog Meat Processing with capacity for 3.000 frogs per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Frog Meat Processing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Ra Processing | Meat Processing Project | Frog Meat Expedition | Frog Processing | Hair Dye Manufacturing Process Flow Chart | How to Start a Hardware Business | Ready-made Business Plan for Cosmetics Store | Equipment for Setting Up a Gas Station | How to Set Up a Juice Bar | Project to Open a Gardening and Landscaping Company | Sell Surf Shop | Gingerbread Flowchart | How Much Does It Cost to Set Up a Compounding Pharmacy | Rubber Powder Factory | Set up a children's space | Fish Freezing Tunnel | Campos Society Projects | Floor Plan Model of an X-ray Clinic | Model Dental Office | What is needed for an industrial kitchen? | Lottery Name | Pizza Dial Projects | Nursing Home Projects | Ceramic Manufacturers for Aromatherapy | Floor Plan Model of a Pharmaceutical Industry | Download Marble Cutter Project | Biscuit Dough Factory | Bikini Making Machine | Floor Plan of a Shoe Company | Cell Phone Case Suppliers | Registration for Environmental License for Charcoal Packaging | Woodworking Bed Designs | Concrete Block Manufacturing Project | Wood Oven and DWG | Machine To Make Ceramic Floors | Nursery Manufacturing | Cleaning of Food Industry Laboratories | Cheese Production Flowchart Template | How to Set Up a Jeans Factory | Build Skate Park | Pop De Farmacia Water Tank Cleaning | Ppho Registration Template 9 | Podiatry Room Model | Travel Agency Floor Plan | Well Construction | How to Set Up an Appliance Repair Shop | Set Up a Cleaning Company | Flowchart for Pet Food Manufacturing | Ceramic Brick Layout | First Company Financing Padaria2727 | Permabuco Corn Snack Factories | How to Grow Mushrooms | How to Set Up a Banana Raisin Factory5d | How to Set Up a Pharmaceutical Industry |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 20 liters.
Project Factory to Produce Biomass of Banana with capacity for 1.000 Kg per day.
PDF Projetos de Fábrica para Produção de Broom Handle, Broom and Water Rakes (Complete) with capacity for 5.000 units per day.
Plant and layout Factory to Produce Corn Flour with capacity for 8.000 Kg per day.
Project Factory to Produce Liquid Chocolate with capacity for 20.000 liters por day.
Project Slaughterhouse Bovines, Swines and Ovines with capacity for 30 animals per day.
FeasibilityCachaça (Liquor) Factory, with capacity for 20.000 liters/day. (To be built in a flat land).
Business plant Hotel (Resort) and Convention Center with 100 apartaments.
Project Rendering with capacity for 150 tons/day.
How to start Factory to Produce Powder Cheese Bread with capacity for 3.000 Kg/day.

Project - how to start Frog Meat Processing with capacity for 3.000 frogs per day.