Ready project Microbrewery, with capacity for 2.000 liters/day.

CODE - AGR-077

Ready project Microbrewery, with capacity for 2.000 liters/day.

CODE - AGR-077


Project ready with:

Industry with the following sections:

Raw Material Reception
Processing - phase 1 (selection, cleaning, Drying)
Processing - phase 2 (maturation, wort)
Processing - phase 3 (filter, maturation)
Bottling
Storage for Finished Products
Storage for Ingredients
Storage for Raw Material
Storage for Packaging
Employees Hygiene
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Microbrewery

How to start Microbrewery, with capacity for 2.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Microbrewery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Physical Arrangement for a Brewery | Price to set up a 2000 liter brewery | How to Set Up a 2000 L Per Day Microbrewery | Physical Layout of a Brewery | Brewery Physical Arrangement | Physical Arrangement of a Brewery | Physical Layout of a Brewery | Beer Physical Arrangement | Physical Arrangement for Brewery | Brewery Physical Arrangements | Brewery Physical Arrangement | Brewery Physical Arrangements | Brewery Physical Arrangement | Microbrewery 2000 Liters Day | Microbrewery Arrangement Type | Physical Arrangement of Microbrewery | Brewery Physical Arrangement | Microbrewery Construction | Raw Material for Hair Dye Manufacturing | Hardware Store Floor Plan | Cosmetic Sales Projection | Fuel Station Feasibility Study | How to Create a Flowchart for a Juice Bar | I Want to Open a Landscaping Company | How to Set Up a Sarf Wear Store | What Equipment is Needed to Make Gingerbread? | I want to know what a compounding pharmacy layout looks like | Rubber Flowchart | I Want to Open a Children's Space | Shrimp Freezing Companies | Projects to Assemble Synthetic Society Field | Dental Radiology Clinic Financing Project Template | Planta Dental Clinic | Industrial Kitchen Utensils in Pocos De Caldas, Minas Gerais | Academic Work on Lottery House | How to Set Up a Nutritional Spa | Small Pizzeria Projects | Nursing Homes-projects | How to Open an Aromatherapy Factory | Pharmaceutical Area Floor Plan | How to Manage a Marble Factory | Biscuit Model | Machinery for Making Beachwear Bikinis | Footwear Factory Plant5c | Cell Phone Cover Making Machines | How to Open a Coal Production Company | Business Plan Template for Consulting Firms | Block Manufacturing Project | Barbecue Grill Model In Dwg | Flooring Production Organization | Wood Nurseries | Microbiology Quality Control | Dairy Plant Models | Laundry Business Plan Example | Car Workshop Plan | DWG Track Drawing | Pharmacy Clean Pop | Hygiene Project Templates | Cost of Opening a Podiatry Business | Project to Open a Travel Agency | Artesian Well How It Is Made | Technical Assistance Store Model | What is a Cleaning Company? | Feed Factory Projects | Ceramic Industry Organization Chart | How to Make a Cake Flowchart | Snack Factory | Mushroom Cultivation Installation | Making Banana Jam | Pharmaceutical Industry Schedule |

 

Other projects ready:

How to start Factory to Produce Banana Raisin with Chocolate Covering with capacity for 30.000 Kg/day.
Project Factory to Produce Fodder for Birds with an area of 133 m² and capacity for 5.000 kg/day.
PDF Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Pallet Fodder for Fishes, Cats and Dogs with capacity for 500 Kg/day.
Project Restaurant 1.000 meals per day.
Project Small House of Honey Production with an area of 60 m² and capacity for 200 liters/day.
FeasibilityIndustry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters and bottles of 1 and 2 liters.
Business plant Factory to Produce Concrete Blocks with capacity for 10.000 units per day.
Project Factory to Produce Ketchup with capacity for 5.000 Kg per day.
How to start Factory to Produce Vinegar made from Apple with capacity for 1.000 liters/day.

Project - how to start Microbrewery, with capacity for 2.000 liters/day.