Ready project Microbrewery, with capacity for 2.000 liters/day.

CODE - AGR-077

Ready project Microbrewery, with capacity for 2.000 liters/day.

CODE - AGR-077


Project ready with:

Industry with the following sections:

Raw Material Reception
Processing - phase 1 (selection, cleaning, Drying)
Processing - phase 2 (maturation, wort)
Processing - phase 3 (filter, maturation)
Bottling
Storage for Finished Products
Storage for Ingredients
Storage for Raw Material
Storage for Packaging
Employees Hygiene
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Microbrewery

How to start Microbrewery, with capacity for 2.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Microbrewery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Brewery Physical Arrangements | Physical Arrangement of Microbrewery | Microbrewery Construction | Brewery Physical Arrangement | Microbrewery Arrangement Type | Physical Arrangement of a Brewery | Physical Arrangement for a Brewery | Brewery Physical Arrangement | Brewery Physical Arrangement | Physical Layout of a Brewery | Price to set up a 2000 liter brewery | Beer Physical Arrangement | Brewery Physical Arrangements | Brewery Physical Arrangement | How to Set Up a 2000 L Per Day Microbrewery | Physical Layout of a Brewery | Physical Arrangement for Brewery | Microbrewery 2000 Liters Day | Raw Material for Hair Dye Manufacturing | Hardware Store Floor Plan | Cosmetic Sales Projection | Fuel Station Feasibility Study | How to Create a Flowchart for a Juice Bar | I Want to Open a Landscaping Company | How to Set Up a Sarf Wear Store | What Equipment is Needed to Make Gingerbread? | I want to know what a compounding pharmacy layout looks like | Rubber Flowchart | I Want to Open a Children's Space | Shrimp Freezing Companies | Projects to Assemble Synthetic Society Field | Dental Radiology Clinic Financing Project Template | Planta Dental Clinic | Industrial Kitchen Utensils in Pocos De Caldas, Minas Gerais | Academic Work on Lottery House | How to Set Up a Nutritional Spa | Small Pizzeria Projects | Nursing Homes-projects | How to Open an Aromatherapy Factory | Pharmaceutical Area Floor Plan | How to Manage a Marble Factory | Biscuit Model | Machinery for Making Beachwear Bikinis | Footwear Factory Plant5c | Cell Phone Cover Making Machines | How to Open a Coal Production Company | Business Plan Template for Consulting Firms | Block Manufacturing Project | Barbecue Grill Model In Dwg | Flooring Production Organization | Wood Nurseries | Microbiology Quality Control | Dairy Plant Models | Laundry Business Plan Example | Car Workshop Plan | DWG Track Drawing | Pharmacy Clean Pop | Hygiene Project Templates | Cost of Opening a Podiatry Business | Project to Open a Travel Agency | Artesian Well How It Is Made | Technical Assistance Store Model | What is a Cleaning Company? | Feed Factory Projects | Ceramic Industry Organization Chart | How to Make a Cake Flowchart | Snack Factory | Mushroom Cultivation Installation | Making Banana Jam | Pharmaceutical Industry Schedule |

 

Other projects ready:

How to start Industry to Produce Creams, Hair Conditioner, Hand and Body Cream, Suntan Lotion with capacity for 5.000 Kg/day.
Project Factory to Produce Pallet Fodder for Fishes, Cats and Dogs with capacity for 80.000 Kg/day.
PDF Projeto de Frigorífico para Abate de Bovinos (Abate pelo Método Kosher) with capacity for 1.200 animais por day.
Plant and layout Industry to Produce Soap with capacity for 5.000 Kg/day.
Project Factory to Produce Vinegar made from Apple with capacity for 1.000 liters/day.
Project Factory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 500 Kg per day.
FeasibilityFactory to Produce Expanded Clay with capacity for 1.000 Kg/day.
Business plant Factory to Produce Pasta and Frozen Ready Dishes with capacity for 30.000 Kg/day.
Project Hostel with capacity for 300 Alojamentos.
How to start Factory to Produce Perfume with capacity for 3.000 liters/day.

Project - how to start Microbrewery, with capacity for 2.000 liters/day.