Ready project Factory to Produce Energy Drinks with capacity for 3.000 liters/day.

CODE - REFR-021

Ready project Factory to Produce Energy Drinks with capacity for 3.000 liters/day.

CODE - REFR-021


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Energy Drinks

How to start Factory to Produce Energy Drinks with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Energy Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Energy Factory Organization Chart | Chicken Farm Business | Sample Gel Company Business Plan | What Does It Take to Open a Liquid Soap Factory? | Construction Materials Store Project | What Do I Need to Set Up an Oil Change? | Equipment for Agricultural Stores | Retail Business Plan | P20 Cylinder Prices | Material for setting up a lingerie store | Chewing Gum Process (factory) | Layout for Food Distributor | Project Template for Opening a Daycare Center | Office Room Layout Model | Equipment Used in the Charque Industry | Project for the construction of a pigsty | Example Of Hospital Chapel Cad | Dental Radiology Report | How to Set Up an Audiology Practice | Motel Construction Project Preparation | How to Set Up a Swimming Project for Public Schools | How to assemble a lunchbox | Ready Convenience Project | How to Set Up a Snack Bar Project | How to Set Up a Spray Tanning Room | Machinery and Equipment Used in the Production of Injectable Medications | How to Make Resin Marble2c Synthetic Marble | Jeans Making Layout | Set Up Factory Make Sock | Plastic Injection Company For Sale | How to Set Up a Sandblasting Company | Set Up Home Work Clothespin | Skateboard Manufacturing Process | How to Make a Concrete Post Form | Paper Model Plants | What It Takes to Set Up an Electroplating Shop | How to Make a Gas Cylinder | Project How to Set Up a Clinical Analysis Laboratory | Cheese and Yogurt Production Machine Manufacturers | I Want to Set Up a Safety Equipment Store | Mechanical Workshop Layout Model | Indoor Karting Business Plan | How to Set Up a Nursing Routine Standard Operating Procedure | Beauty Center Project | How to Set Up a Cartridge Recycling Facility | Step by Step Guide to Opening a Condominium Management Company | Engineering Office or Engineer | Computer Maintenance Flowchart Templates | I Want to Open a 24-Hour Towing Company | Equipment Used In Soft Drink Manufacturing | Instant Noodle Packaging Machines | Machines for producing sweets | Flour Cereals | How to Set Up a Micro Orange Juice Business | Kennel .dwg |

 

Other projects ready:

How to start Factory to Produce Water Rakes with capacity for 10.000 units per day.
Project Factory to Produce Cachaça (Liquor), Açúcar Mascavo (Brown Sugar), Rapadura and Melado, with capacity for 5.000 liters/day. (To be built in a flat land).
PDF Factory to Produce Ready Seasoning with capacity for 3.000 Kg per day.
Plant and layout Tannery Frog Skin with capacity to Produce 5.000 skins/day.
Project Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Clothing Industry to Produce Upholstery with capacity for 1.000 garments/day.
FeasibilityFactory to Produce Vinegar made from Wine with capacity for 1.000 liters/day.
Business plant Milk and Dairy Industry to be built in 2 phases: 1st phase: Milk Packaging, with 95 m2 (113,62 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Milk Packaging, Fresh Cheeses production, Yogurt and Milky Beverage, with 200 m2 (239,2 sq.yd.) area and capacity for 8000 liters/day.
Project Factory to Produce Wine, with capacity for 400.000 liters/year.
How to start Factory to Produce Bala de Coco (Coconut Candy) with capacity for 3.000 Kg/day.

Project - how to start Factory to Produce Energy Drinks with capacity for 3.000 liters/day.