Ready project Rendering with capacity for 150 tons/day.

CODE - FRIG-206

Ready project Rendering with capacity for 150 tons/day.

CODE - FRIG-206


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 150 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Blueprint for setting up a rendering plant | Rendering Projects | Rendering Project | See Rendering | Names of rendering companies | How to Set Up a Rendering Shop | Equipment for 150 | Floor Plan of Rendering Plant | How to Build a Rendering Plant | Rendering Plant | Design of a Rendering Plant | Floor Plan Drawing of a Rendering Plant | Rendering Project | Design of a Rendering Plant | Project for Rendering | Rendering Projects | Rendering Way to Build | How to Set Up a Rendering Plant | Work in rendering | Rendering Project | honeymoon | Beef Cattle Corral Project | Production Flow Industry Model | Sports Store Organizational Chart Template | Set up Vehicle Rental Company | Vehicle Resale Floor Plan | Food Mockup | Footwear Store Project | Tan Rabbit Leather | Standard Operating Procedure for Compounding Pharmacy | School Floor Plan Templates | How Boar Slaughter Is Done | Meat Boutique Equipment | Football Fields and Stadiums Projects | Pops Minor Surgery Room | Physiotherapy Clinic With Changing Room For Patients | Physical Plan of the Intensive Care Unit Room | Barbecue Restaurant Feasibility Study Model | Supermarket Plant | How Much Does It Cost To Build A Gym | Bowling Assembly Cost | Car Wash Business Plan | How to Set Up a Lunchbox | Pen Making Equipment | Vegatal Bushing Factory Rs | Loan for Micro Enterprise Faction | Cache Providerpc3b4 | How to Make Raincoats | Plastic Wood Industries Santa Catarina | MDF Toy Model | Block Factory Layout | Cincrete Plant | How to Set Up a Cardboard Box Workshop | .the Use of Aluminum in the Manufacture of Cookware | Mobile Terrace Covers | Dental Laboratory Administration | How to Set Up a Powdered Milk Factory | How to Assemble Flake and Cube Ice Maker | Automotive Battery Factory | Operational Layout Project | Pop Laboratory Standard | Project to Set Up a Real Estate Agency | Financial Planning for Setting Up a Nursery | Open a Blinds Assembly Company | Ready-made Websites Quick Graphics | Open Tachograph Store | Description of a Company Academic Work Assembly | Ice Cream Industry Business Plan | Pizzeria Production Plan | Grape Juice Equipment | Legislation and Processing of Brazil Nuts | Machines for Producing Tofu Cheese | How to Plan a Cemetery |

 

Other projects ready:

How to start Slaughterhouse Bovines, Swines and Caprines with capacity for 10 animals per day.
Project Factory to Produce Soft Drink with capacity for 20.000 liters/day.
PDF Slaughterhouse Wild Boar with capacity for 10 animals per day.
Plant and layout Factory to Produce Frozen Pre-Fried Cassava and Stick Cassava (Manioc) with capacity for 500 Kg per day.
Project Factory to Produce Pierced Bricks with capacity for 3.000 units per day.
Project Factory to Produce Seasoning and Condiments with capacity for 1.000 Kg/day.
FeasibilityFactory to Produce Pickles with capacity for 3.000 Kg per day.
Business plant Drugstore with an area of 50 m².
Project Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 3.000 Kg/day.
How to start Factory to Produce Sealing for Plates with capacity for 5.000 Kg/day.

Project - how to start Rendering with capacity for 150 tons/day.