Ready project Rendering with capacity for 150 tons/day.

CODE - FRIG-206

Ready project Rendering with capacity for 150 tons/day.

CODE - FRIG-206


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 150 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Names of rendering companies | Equipment for 150 | Floor Plan Drawing of a Rendering Plant | Design of a Rendering Plant | Rendering Project | Rendering Projects | Blueprint for setting up a rendering plant | Rendering Project | How to Set Up a Rendering Shop | Rendering Way to Build | Floor Plan of Rendering Plant | How to Set Up a Rendering Plant | See Rendering | Rendering Project | Design of a Rendering Plant | Work in rendering | Project for Rendering | Rendering Plant | Rendering Projects | How to Build a Rendering Plant | honeymoon | Beef Cattle Corral Project | Production Flow Industry Model | Sports Store Organizational Chart Template | Set up Vehicle Rental Company | Vehicle Resale Floor Plan | Food Mockup | Footwear Store Project | Tan Rabbit Leather | Standard Operating Procedure for Compounding Pharmacy | School Floor Plan Templates | How Boar Slaughter Is Done | Meat Boutique Equipment | Football Fields and Stadiums Projects | Pops Minor Surgery Room | Physiotherapy Clinic With Changing Room For Patients | Physical Plan of the Intensive Care Unit Room | Barbecue Restaurant Feasibility Study Model | Supermarket Plant | How Much Does It Cost To Build A Gym | Bowling Assembly Cost | Car Wash Business Plan | How to Set Up a Lunchbox | Pen Making Equipment | Vegatal Bushing Factory Rs | Loan for Micro Enterprise Faction | Cache Providerpc3b4 | How to Make Raincoats | Plastic Wood Industries Santa Catarina | MDF Toy Model | Block Factory Layout | Cincrete Plant | How to Set Up a Cardboard Box Workshop | .the Use of Aluminum in the Manufacture of Cookware | Mobile Terrace Covers | Dental Laboratory Administration | How to Set Up a Powdered Milk Factory | How to Assemble Flake and Cube Ice Maker | Automotive Battery Factory | Operational Layout Project | Pop Laboratory Standard | Project to Set Up a Real Estate Agency | Financial Planning for Setting Up a Nursery | Open a Blinds Assembly Company | Ready-made Websites Quick Graphics | Open Tachograph Store | Description of a Company Academic Work Assembly | Ice Cream Industry Business Plan | Pizzeria Production Plan | Grape Juice Equipment | Legislation and Processing of Brazil Nuts | Machines for Producing Tofu Cheese | How to Plan a Cemetery |

 

Other projects ready:

How to start Factory to Produce Garapa (Sugar Cane Juice), with capacity for 300 liters/day.
Project Slaughter area for Frog, with area of 100 m² (119,6 sq.yd) and capacity for 600 kg of Frogs/day.
PDF Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 1.000 Kg/day.
Plant and layout Slaughterhouse Bovines, Swines and Caprines with capacity for 500 animals per day.
Project Factory to Produce Pork Rinds (Torresmo) with an area of 250 m².
Project Factory to Produce Acerola Pulp (Barbados cherry) with capacity for 5.000 Kg per day.
FeasibilityRendering with capacity for 500 tons/day.
Business plant Cold Storage Room to Produce Salted and Dried Fishes and Fish Products with capacity for 20.000 Kg/day.
Project Farm to Produce Country Chicken (Frango Caipira) with capacity for 5.000 Chickens per day.
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, with capacity for 1000 liters/day.

Project - how to start Rendering with capacity for 150 tons/day.