Ready project Factory to Produce Energy Drinks with capacity for 30.000 liters/day.

CODE - REFR-025

Ready project Factory to Produce Energy Drinks with capacity for 30.000 liters/day.

CODE - REFR-025


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Energy Drinks

How to start Factory to Produce Energy Drinks with capacity for 30.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Energy Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Project for Energy Production | Energy Production | How to Build Sheds for Raising Goats | Print-Ready Floor Plan | Tire Shop Floor Plan Template | What Does It Cost To Open A Rotisserie? | How to Start a Plastering Services Business | Tennis Company Organization Chart | Floor Plan Distributors | Create a Basic Food Basket Company | Driving School Architectural Plan | Cattle Cold Storage Plants | Fish Flour Digester | Sports Gym Project Dwg | Organizational Chart for Setting Up a Medical Office | Family Health Program Funded | Emergency Room Floor Plan | Buffet Financial Physical Schedule Template | Floor Plan for a Guest House | Hospital Bread Supplies | How to Set Up Traveling Nightclubs | Internal Layout Lava Jato | Ready-made Children's Buffet Business Plan | Making Plaster Bandage | Mattress Manufacturing Flowchart | Organization Chart of a Clothing Company | Basic Model of How to Set Up a Uniform Factory | Manufacturing of non-woven bags | Guaramirim Styrofoam Factory | School Chairs and Tables Template for Model | Machines for Assembling a Wooden Door Factory | Mourões Online Store | .Kite Machines | Installing Aluminum Windows | How Much Does It Cost to Install Electroplating? | Mount Prosthesis Factory | Yogurt Ice Cream Making | Anvisa or Pops Good Practices Manual for Pest Control Companies | How to Build a Car Armored Vehicle | Operational Process of a Dairy | Restaurant Pop Template | How to Create an Organizational Chart and Flowchart for a Beauty Salon Project | Business Plan Training Company | What Do I Need to Set Up a Van Rental Company? | Office Physical Plan | Cleaning Supplies Company Layout | Rural Construction Planning Pigs | I Want to Set Up a Bakery | Cream Cracker Biscuit Factory | How to Make a Eucalyptus Oil Distiller | Acerola Ice Cream Flowchart | Sauce Industries | Petshop Cad Project |

 

Other projects ready:

How to start Grated Cheese factory with capacity of 6000 kg per day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Butter, with capacity of 1000 liters/day.
PDF Nursery and Day Care with capacity for 30 children.
Plant and layout Cold Storage Room to Produce Salted Fish and Fish Products with capacity for 5.000 Kg/day.
Project Cold Storage Room for Frozen Fish and Fish Products with area of 360 m² (430,56 sq.yd) and capacity for 3.000 kg/day, with frozen Fish Production and Breaded Fish.
Project Factory to Produce Paprika (grounded red) with capacity for 100 Kg/day.
FeasibilityFactory to Produce Energy Drinks with capacity for 30.000 liters/day.
Business plant Factory for Pupunha Palm with capacity for 2.000 kg per day.
Project Slaughterhouse Bovines and Swines with capacity to Slaughter 800 animals/day.
How to start Clothing Industry to Produce Shirts with capacity for 500 garments/day.

Project - how to start Factory to Produce Energy Drinks with capacity for 30.000 liters/day.