Ready project Factory to Produce Energy Drinks with capacity for 5.000 liters/day.

CODE - REFR-022

Ready project Factory to Produce Energy Drinks with capacity for 5.000 liters/day.

CODE - REFR-022


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Energy Drinks

How to start Factory to Produce Energy Drinks with capacity for 5.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Energy Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Factory Project for Energy Production with Capacity for 5,000 Liters/2day | How to Set Up an Energy Factory | Energy Drinks Flowchart Template | How to Create an Energy Drink Campaign Schedule | Energy Production Flowchart | Factory Project for Energy Production | Ready Apiary Project | Which Company Manufactures Biodigesters | Softener Production Flowchart | I Want to Build a Mini Market | How Much Does It Cost to Set Up a Surgical Supply Store | What Do I Need to Set Up a Cold Storage Store? | How to Make a Pie House | Business Plan for a Glass Shop | Ready Project Example Template | I would like to open a surgical shop | How to Set Up a Frozen Food Store | Set Up a Toy Library Business Plan | Slaughterhouse That Slaughters Sheep | Quail Slaughterers | Quara Cover Dwg | Medical Clinic Project Templates | List of Basic Ubs Equipment | How Much Does It Cost to Set Up an ICU? | Ready-Made Coffee Shop Business Plan | Supermarket Project Example Dwg | How to Make a Kitchen Model | Ready-made Business Plan for a Nightclub Business | Car Wash Box Design | List of Materials for Building a Party Hall | Pop For Hemodialysis Water | Small Business Stamps | What It Takes to Set Up a Denim Faction | Shirt Manufacturing Company Layout | Broom Making Machines With Pet Bottles | Sofa Construction Project | Making Percussion Stick | Budget for Setting Up a Carpentry Shop | Setting Up An Asphalt Plant 2012 | Cardboard Egg Trays | Aluminum Foil Factory | Disposable Aluminum Lunch Box | Steps to Open a Clinical Analysis Laboratory | Small Cheese Factory Project | Budget to Open a Mineral Water Factory | How I Opened a Parking Lot | Operational Project Model | Restaurants & Pop | Beauty Salon Flowchart Template | Greenhouse Floor Plans | Budget for Setting Up a Vehicle Tracking Company | How to Consult in a Company | Refrigeration Workshop Layout Template | Set up a Filming Studio | Ingredients for Making Popsicles | Start a Pasta Company | Brigadeiro Production Flowchart | Roasting Factory | Fruit Juice Company Name Ideas | Ketchup Factory Equipment | Veterinary Clinic Business Plan In Mg |

 

Other projects ready:

How to start Factory to Produce Clothes Peg with capacity for 1.000 Kg/day.
Project Gymnasium (with swimming pool, gymnastics room, body building area and other rooms) with capacity for 30 people.
PDF Marble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 4 Blocks per Week.
Plant and layout Family Health Program with an area of 300 m2.
Project Factory to Produce Ceramic Floors with capacity for 1.000 m2/day.
Project Factory to Produce Expanded Clay with capacity for 5.000 Kg/day.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Yogurt, Milky Beverages, with capacity of 6000 liters/day.
Business plant Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 200 garments/day.
Project Rendering with capacity for 5 tons/day.
How to start Factory Improvement and Packing of Cereals, Flours and Grains with capacity for 3.000 kg/day.

Project - how to start Factory to Produce Energy Drinks with capacity for 5.000 liters/day.