Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Isotonic Drinks with capacity for 1.000 liters/day.
CODE - REFR-011
Ready project Factory to Produce Isotonic Drinks with capacity for 1.000 liters/day.
CODE - REFR-011
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Isotonic Drinks
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Isotonic Drinks with capacity for 1.000 liters/day.
Business plan for Factory to Produce Isotonic Drinks with capacity for 1.000 liters/day.
3D project of Factory to Produce Isotonic Drinks with capacity for 1.000 liters/day.
Projects with other capacities
Factory to Produce Isotonic Drinks
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How to Set Up an Isotonic Drink Factory
|
Plants In Beverage Production
|
Manufacturer of packaging for isotonic drinks
|
Business Plan - Soft Drink Production
|
Lipstick Factory
|
Automotive Accessories Store Warehouse
|
How to Set Up a Fishing Tackle Store
|
What is the name of the company that sets up bank branches?
|
Sweet shop
|
How to Open a Men's Clothing Store
|
Machine for Making Pacoca
|
Pharmacy.dwg
|
How to Open a Swimming School
|
Values to Set Up a Refrigeration Company for Slaughtering Chicken
|
Cost To Make Sausage
|
How to Set Up Society Courts
|
How to Set Up a Veterinary Surgery Center
|
Physiotherapy Clinic Project
|
DWG Academy Machine
|
Beer Machine Project
|
Budget for Setting Up a Bodybuilding Gym
|
Where to Buy Equipment to Set Up a Bowling Alley
|
Low Car Wash Plant
|
Drive In Floor Plan
|
Article Construction of Analysis Laboratory
|
Fireworks Factory Plant
|
Disposable Clothing R24
|
Glass Candy Cup Manufacturer
|
Price to Set Up a Plastic Recycling Industry
|
Where to Buy Autoclave for Treating Wood
|
How to Set Up a Pre-molded Company
|
Solar Panel.dwg
|
Machinery for packaging factory for party sweets
|
Work with Iron Beams
|
Company Factory Flowchart
|
Dairy Layout
|
Projects to Build a Buggy
|
Two Bedroom Houses Projects
|
Ice Cream Shop Pop Template
|
Standard Operating Procedure Water Laboratory
|
Bus Garage Floor Plan
|
Set up an injection company
|
Call Center Project Template
|
Drawing of a Restaurant
|
I Want to Open a School Transportation Company
|
Ice Cream Factory Layout
|
Pastel Machines
|
Marble Granite Company Process Flowchart
|
Equipment Used For Production Of Frozen Pre-Fried Potatoes
|
Coconut Water Pasteurizer Machine
|
Machines to Produce Castor Oil
|
Crematorium Model
|
Other projects ready:
How to start Slaughterhouse Swines Slaughter and Cold Meat Production (Sausages, Hams, Cold Meat and Smoked Products) with capacity to Slaughter 600 animals/day.
Project Factory to Produce Injected Plastic with capacity for 20.000 Kg/day.
PDF Factory to Produce English Sauce and Shoyu Sauce with capacity for 1.000 liters per day.
Plant and layout Slaughterhouse Bovines and Swines and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) and Charque Processing with capacity to Produce 400 animals/day.
Project Factory to Produce Canned Eggs (Quail and Chicken) with capacity for 1.000 Kg/day.
Project Public Medical Clinic with an area of 400 m2.
FeasibilityFactory for Palmito de Pupunha (Pupunha Palm) with capacity of 12.000 kg/day.
Business plant Factory to Produce Red Pepper Flakes Pimenta Calabresa with capacity for 3.000 Kg per day.
Project Clothing Industry to Produce Cloth Strainer with capacity for 200 units/day.
How to start Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 5.000 Kg per day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US