Ready project Factory to Produce Isotonic Drinks with capacity for 10.000 liters/day.
CODE - REFR-014
Ready project Factory to Produce Isotonic Drinks with capacity for 10.000 liters/day.
CODE - REFR-014Project ready with:
Industry with the following sections:Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Isotonic Drinks
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Isotonic Drinks with capacity for 10.000 liters/day.
- Business plan for Factory to Produce Isotonic Drinks with capacity for 10.000 liters/day.
- 3D project of Factory to Produce Isotonic Drinks with capacity for 10.000 liters/day.
Projects with other capacities
Factory to Produce Isotonic Drinks
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Set up a Beverage Factory | Beverage Factory Plant | Beverage Industry Facade Plan | Isotc3b4nicas Drinks In English | Plant In Beverage Manufacturing | Cost of Setting Up a Beverage Factory | Isotonic Production Cost | How to Start a Beverage Manufacturing Company | Beverage Factory Plant | How to Set Up a Beverage Manufacturing Company | Beverage Factory Floor Plan | Isotonic Factory | Beverage Production Technology | Start Beverage Factory | Construction of Wooden Rabbit Cages | Soap Making Machines | Electrical Store Layout | What is Necessary to Perform an Oil Change | How to Set Up an Agricultural Business | What is needed to open a fruit business? | Company Sells Work Program | How Much Does It Cost to Open a Jewelry Store | How to Wrap Banana Candy | How to Set Up a Distribution Company | Opening a Nursery Business | Computer Schools and Equipment Layout | Sausage Factory Model | Floor Plan for Building Pig Pens | Radiology Is Good Business | Hospital Floor Plan With Ambulance Garage | How to Set Up a Motel Project | Swimming Project | How to Set Up a Marmitex Restaurant | Installation Project for a Convenience Store | Ready-made Business Plan for Snack Bar | Bndes Finances Aesthetic Equipment | Business Value of a Diaper Factory | Insecticide Industry in Brazil | Leather Production Process | Academic Works on Glass Industry | What It Takes to Set Up a Plastic Injection Company | Homework Assembly Cleats | Make Staple Fasteners For Home Work | How to Set Up a Skateboard Factory | Molds for Concrete Posts | Coffee Filter Manufacturing | Equipment for Setting Up an Electroplating Plant | Gas Cylinder Capacity | Biomedical Laboratory Floor Plans | Cheese Factory | Contaminated PPE Laundry | Workshop Layout Templates | How to Create a POP for a Company | Set up a beauty center | Optical Facades | How to Set Up a Condominium Management Project | Set up a Project Office | How to Open a Computer Maintenance | Towing Company For Sale | Soft Drink Industry Plant | Ceramic Block Dryer Quote | Pasta Manufacturing Process Flowchart | Making Banana Candy | Project to Set Up a Juice Factory | Designing a Kennel |
Other projects ready:
How to start Laundry for Jeans (Stone Wash) with capacity to wash 5.000 Kg/day.
Project Slaughterhouse Bovines with capacity to Slaughter 800 animals/day.
PDF Factory to Produce Baked Cheese Bread with capacity for 1.000 Kg/day.
Plant and layout Factory to Produce Aerosol with capacity for 5.000 bottles per day.
Project Factory to Produce Condensed Soy Milk with capacity for 10.000 liters/day.
Project Frog Meat Processing with capacity for 3.000 frogs per day.
FeasibilityFactory for toasted Chestnut industrialization with production capacity of 1.000 kg/day 250m2 (299 sq.yd.) area.
Business plant Factory to Produce Caffeine (Transform Coffee in Caffeine) with capacity for 300 liters/day.
Project Factory to Produce Gauze Compresses and Cotton Yarn Bandage (with Sterilization in Autoclbird) and capacity for 1.000.000 compresses (2.000 packages with 500 compresses) per day.
How to start Factory to Produce Macaroni for dry Pasta with capacity for 1.000 kg/day.



