Ready project Factory to Produce Isotonic Drinks with capacity for 30.000 liters/day.

CODE - REFR-016

Ready project Factory to Produce Isotonic Drinks with capacity for 30.000 liters/day.

CODE - REFR-016


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Isotonic Drinks

How to start Factory to Produce Isotonic Drinks with capacity for 30.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Isotonic Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Isotonic Drinks Production | Cad Project Of An Isotonic Company | Open a Business with 30,000 | How to Start a Business with $30,000 | Layout of a Candy Store | Toothpaste Manufacturer | How Much Does It Cost to Set Up a Plumbing Store? | Cosmetics Business Plan Work | What is needed to set up a gas station2c What is the budget for everything? | Juice Bar Model | Project Store 199 | How to Set Up a Shop and Haberdashery | Processing Peanuts in the Production of Paçoca | Beverage Distributor Business Plan | Recycling of Used Automotive Oils | Flowchart of a Dance School | Frozen Fish Processing Flow | How Much Does It Cost to Set Up a Futsal Court | Setting Up a Dental X-Ray Clinic | Financing for Dental Clinics | Industrial Kitchen Layout Projects | Equipment Needed for a Movie Theater | Organization of a Spa | Investment for Setting Up a Pizza Disk | How to Set Up a Retirement Home | Retirement Home Plan | Serum Industry Business Plan | Investment for Setting Up a Marble Factory | Palm Essential Oil | Assembly For Bikini Factory | Blueprint How To Make 1000 Pairs Of Shoes A Day | Fiberglass Pools Floor Plan Prices | Coal Production Flow | How to Set Up a Sawmill | A Business Plan for a Concrete Block Factory | How to Make a Wood Stove with a Barbecue | Ceramic Factory Profitability | Beverage Business Plan In Ready Table | Food Laboratory Floor Plan | Equipment for manufacturing dairy beverages | Art Environmental License Hospital Laundry | Body Shop Business Plan | Skate Track Model | Pop Drugstore Sanitation | How to Set Up a Business Selling Various Hygiene Products | Initial Investment in Podiatry | People Agency Enterprise | Floor Plan of an Artesian Well | How to Set Up a Sound Car for Advertising | ....... o Create a Physical and Financial Works Schedule | Machine for Production of Dog Food | Price to assemble a ceramics | Set Up a Bakery | Set up a Corn Snack Factory | Viability of Champignon Mushroom Production | How to Make Banana Raisins | Putting Together a Pharmaceutical Medication Schedule |

 

Other projects ready:

How to start Factory to Produce Furniture with an area of 700 m2.
Project Bakery with an area of 300 m2.
PDF Factory to Produce Fresh Dough for Pizza with capacity for 500 Kg/day.
Plant and layout Factory to Produce Banana Purée with capacity for 40.000 Kg/day.
Project Frog Area, for Frog Breeding, with specific areas (reproduction area, Greenhouse, Toads, Fattening Area).
Project Factory to Produce Truffles (Stuffed with Chocolate) with capacity for 500 Kg/day.
FeasibilityHospital Laundry with services for 100 beds.
Business plant Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 15.000 liters/day.
Project Laundry for Hotels with services for 100 rooms per day.
How to start Cold Storage Room to Produce and Dry Shark Fin, Fish Swim Bladder and Fish Hamburguers with capacity to Produce 1.000 Kg/day.

Project - how to start Factory to Produce Isotonic Drinks with capacity for 30.000 liters/day.