Ready project Factory to Produce Isotonic Drinks with capacity for 500 liters/day.

CODE - REFR-010

Ready project Factory to Produce Isotonic Drinks with capacity for 500 liters/day.

CODE - REFR-010


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Isotonic Drinks

How to start Factory to Produce Isotonic Drinks with capacity for 500 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Isotonic Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Write a Beverage Warehouse Business Plan | Chicken Shed Budget | Cosmetic Company Organization Chart | Raising Goats On A Farm | What You Need to Open a Print Shop | Tire Distributor Montar | To Open A Rotisserie | I Want to Open a Plastering Company What Do I Need? | How Much Does It Take to Open a Fabric Store? | Regulatory Standards for Distributing Medicines#sclient=psy | How to Set Up a Food Basket Business | Business Plan for School | Small Sheep Slaughterhouse Floor Plan | Frozen Fish Flowchart | Ideas for Starting a Sports-Related Business | medical clinic pop template | Layout of a PSF | Physical Plan Model for Emergency Care | Buffet Project 200 People | Inn Flowchart Template | How to Make Frozen Light Food | How Do I Open a Nightclub? | Lay Out The Lavarapido | Children's Buffet Project Template | Saline Serum Production Project | Spring Mattress Manufacturing Study | Organizational Chart Confec25c325a725c325a3o | Uniform Production Flow | How to Make Non-Woven Packaging | Styrofoam Tray Manufacturer | School Chair Assembly Flowchart | Layout for window frame factories | Concrete Post Price In Pocos De Caldas | Kite Making Machines | Layout for aluminum frames | How to Set Up a Galvanizing Company | Dental Prosthesis Laboratory Assembly | Yogurt Ice Cream Ebook | Proger Model Project | How to Assemble an Aligner Plan | Cme Standard Operating Procedure | Operational Manual for Restaurants | Financial Plan of a Florist | Floor Plan Projects for Service Provider Companies | Basic Vehicle Rental Project | Office Viability | Cleaning Service Provision Budget Templates | How to Set Up a Whitening Workshop | I Want to See Pig Farms | Confectionery Equipment Project | Cookie Factory Floor Plan | Sale of Bean Processing Company | Material for setting up a fruit processing plant | Hot Sauce Manufacturers | Organizational Chart of a Pet Shop Company |

 

Other projects ready:

How to start Milk and Dairy Industry to be built in 2 phases: 1st phase: Fresh Cheese production (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan, with 178 m2 (212,98 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Amplification to Produce Yoghurt and Milky Beverages, with 216 m2 (258,33 sq.yd.) of total area and capacity for 6000 liters/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Yogurt, Milky Beverages, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 8000 liters/day.
PDF Factory to Produce Frozen Açaí Pulp with capacity for 500 Kg per day.
Plant and layout Industry to Produce Body Soap, Shampoo, Creams, Gel with an area of 600 m² and capacity for 15.000 kg/day.
Project Factory to Produce Seasoning and Condiments with capacity for 5.000 Kg/day.
Project Factory to Produce Pasteurized Liquid Egg with capacity for 3.000 liters/day.
FeasibilityIndustry to Produce Shampoo, Creams and Gel with an area of 180 m² and capacity for 1.500 kg/day.
Business plant Factory for toasted Chestnut industrialization with production capacity of 400 kg/day and 150m2 (179,4 sq.yd.) area.
Project Chinese Kitchen with capacity for 500 meals per day.
How to start CyberCafé with an area of 50 m2.

Project - how to start Factory to Produce Isotonic Drinks with capacity for 500 liters/day.