Ready project Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day.

CODE - TRG-090

Ready project Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day.

CODE - TRG-090


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage for Raw Material
Cleaning
Mill
Production
Storage for Packages
Storage for Finished Products
Expedition
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Macaroni Rice

How to start Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Macaroni Rice

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Formula for Making Rice Noodles | Rice Noodle Factories | Rice Noodle Production | How to Set Up a Rice Factory | Rice Noodles Legislation | Rice Noodle Factory | Plant for a Rice Industry | Roll On Equipment Manufacturers | Computer Store Business Plan | What You Need to Open a Store in the Occupational Safety Area | Fuel Pumps Dwg | Equipment for setting up a juice bar 5b | Distributor of Disposable Products | Computerized Printing Machine | Crystallized Sweet Project | How to Set Up a Beverage Distributor | How Much Does It Cost To Open A Construction Deposit? | Computer School Project | Poultry Slaughter Pcmso Model | Soccer Society Changing Room Plan Dwg | Radiology Project in Dentistry | Dental Office Plan | Industrial Kitchen Assemblers | How to Set Up a Movie Theater in Your Apartment | Urban Spa Business Plan | Beer Disk Business Plan | What is needed to set up a nursing home for the elderly? | 0 What Do I Need to Set Up a Massage Room? | Companies That Manufacture Serum | Project for a Marble Factory | Shirts and Prints Design | How to Start a Curtain Factory | Flip-flop Strap Factory | Canvas Pool Models | Open a Barbecue Stick Business | Sawmill Telephone Number Poços De Caldas | Concrete Block Factory Model | Wood Oven How to Assemble | How Do I Open a Brick Ceramics Business? | Sieve Projects | Cytology Laboratory Business Plan | How the Yogurt Factory Works | Commercial Business Model | Motorcycle Workshop Facade | Skating Rink Plan | Pops Model Pharmacy | Restaurant Procedures Manual | Viability of a Podiatrist | Set Up an Electronic Security Company | Cylinder Capacity | In Design How to Set Up a Company | How to Run a Taxi Company | Feed Factory Project | Perforated Brick Factory | Bakery Layout | Juice Industry Equipment | Greenhouse Shitake Cultivation | Powdered Cellulose Factory | Construction of a laboratory for the production of soap, shampoo and creams |

 

Other projects ready:

How to start Factory to ProProduce Fruit Sweet in Syrup with capacity for 500 Kg/day.
Project Cold Storage Room Shrimp Processing with an area of 300 m² (358,8 sq.yd) and capacity for 3.000 kg/day. Reception area for Living Shrimps.
PDF Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 50 garments/day.
Plant and layout Pastry Shop with an area of 70 m2.
Project Factory to Process Corn on the Cob with capacity for 5.000 Kg per day.
Project Industrial Bakery to Produce French Bread with capacity for 500 Kg/day.
FeasibilityFactory to Produce Frozen Pre-Fried Potato with capacity for 20.000 Kg per day.
Business plant Clothing Industry to Produce Jeans Pants with capacity for 50 garments/day.
Project Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 1.000 garments/day.
How to start Bakery to Produce Dog Products (Panetoni, Cookie, Cracker, etc) with an area of 500 m2.

Project - how to start Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day.