Ready project Factory to Produce Sparkling Wine, with capacity for 400.000 liters/year.

CODE - UV-025

Ready project Factory to Produce Sparkling Wine, with capacity for 400.000 liters/year.

CODE - UV-025


Project ready with:

Industry with the following sections:

Grape Reception
Fermentation
Maturation
Bottling
Stocking
Baggage Room
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Sparkling Wine

How to start Factory to Produce Sparkling Wine, with capacity for 400.000 liters/year. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Sparkling Wine

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Plan of a Wine Factory | What is the layout of a wine factory? | Sparkling Wine Equipment | What is the investment to open a sparkling wine factory? | How to Set Up a Cleaning Materials Industry | How to Set Up a Small Soap and Detergent Factory | How Much Does It Cost To Open An Electrical Store? | How Much Does It Cost To Set Up An Oil Change | Celiac Products Store | Vignette for Fruit Retail | Gift Shop Porto Alegre | County Store Suppliers | Set up a candy factory | Cold Meat Distributor Facade | How to Open a Nursery Step by Step | Sewage Treatment Plant Floor Plan Template | Plan to Build a Pork Rind Factory | How to Assemble a Fish Fridge | How to Set Up a Psychopedagogical Clinic | Hospital Waste Incinerator Machine | Incinerator2fproject | Financial Project for Lan House | Assemble Marmitex to Sell | Business PlanConvenience Store | Construction Plan of a Snack Bar - Models | Products to Open Massage Room | Acetylene Oxide Sterilization | 2727factory Industrial Candles | What is the raw material used to make jeans? | P2f Plaster Mold Manufacturing | Glass Industry Flowchart | Styrofoam Granules Mg | Briquette Manufacturing Project | Plastic Pallet Manufacturers | Business Plan for a Plastering Company | Wet Wipes Factory | Aluminum Sand Recycling | Industry That Manufactures Gas Cylinders | How to Set Up a Soil Laboratory | What is the cost of opening a cheese factory with Sif? | How to Build a GMP Manual | How to Start a Car Repair Business | Egg Powder Machine | Pop Model for Hospital Admission Area | Flowchart of a LPG Gas Company for Delivery | Warehouse.dwg | How to Set Up an Exchange Agency | Setting Up a Collections Office | Washing Machine Repair Poços De Caldas City | Guaramil Energetic Manufacturer | Plants for Bakery Production Areas | How to Set Up a Bakery | Pupunha Factory Structure | Roasting Organization Chart | Business Plan for Juice Industry | Pet Hotel Project |

 

Other projects ready:

How to start Factory to Produce Crystallized Cashew with capacity for 500 Kg per day.
Project Poultry House with capacity for 10.000 Broiler Chickens and a Built area of 1.200 m².
PDF Gymnasium with capacity for 1.000 alunos per day.
Plant and layout Milk and Dairy Industry to Produce Organic Cheese and Goat Milk Cheese with an area of 130 m2 and capacity for 1.500 liters/day.
Project Basic Health Unit with an area of 1.500 m2.
Project Charque factory with area of 200 m² (239,2 sq.yd).
FeasibilityFactory for Condensed Milk production with capacity of 5.000 liters of milk per day.
Business plant Factory to Produce Pastry Dough with capacity for 500 kg/day.
Project Factory to Produce Coconut Fiber (Coconut Shredding) with capacity for 1.000 Kg/day.
How to start Industry to Produce Liquid Soap, Liquid Body Soap, Liquid Detergent, Desinfectant, Carpet-Cleaner and Glass-Cleaner with capacity for 1.000 liters/day.

Project - how to start Factory to Produce Sparkling Wine, with capacity for 400.000 liters/year.