Ready project Smoker with capacity to produce 10 Kg/day.

CODE - FRIG-187

Ready project Smoker with capacity to produce 10 Kg/day.

CODE - FRIG-187


Project ready with:


Industry with the following sections:

Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Smoker

How to start Smoker with capacity to produce 10 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Smoker

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

10kg Smoker | Micro Business Smoker | How Much Does It Cost to Set Up a Soap Factory? | How to Set Up a Screw Reseller | Oil Change Investment | How to Set Up a Rotisserie Chicken Shop | Bakery Project In DWG | How to Set Up an Awning Production Company | Clothing Store Flowchart | Produce Chocolates | Beverage Distributor Business Plan Template | Nursery Plant 30 | I Want to Know the Price of a Mini Water Treatment Plant | Machines for Making Cracklings | Budget for Construction of Fish Cold Storage Facility | Nutrition Service Floor Plan | Hospital Waste Incinerator Equipment | Incinerator Price List | How To Build A Motrl Project | Kitchen Floor Plan of a Bakery | Project to Sell Lunch Boxes | Setting Up a Sauna | Basic Design for a Snack Bar | How to Set Up a Video Rental Store Flowchart | How to Set Up an Immunology Laboratory | Glass Recycling Business Plan | Tencel Clothing Where to Buy | Raffia Bag Factory | How to Install PVC Linings | Styrofoam Brick Manufacturing | Briquetting Machine Project Name | How to Set Up a Pallet Manufacturing Company | Programs for Slab Factories | Machines for producing notebooks | Metalworking Quote Templates | What are the manufacturing processes for gas cylinders? | Soil Analysis Laboratory Setup | How to Make a Physical Production Arrangement for a Drug Distributor | Sisbi Good Practices Manual Template | How to Make a Kayak | Equipment Layout Egg Pasteurization Plant - Layout | Hospital Pop Up Templates To Copy | Gas Tank Floor Plan | Financing for BNDES Warehouse | Orange Juice Extractor Machine Project | Facades Law Firm | I Want to Open a Sofa Renovation Shop | Organizational Chart of a Balloon Decoration Company | Project of a Sirgaria | Setting Up a Mixing Factory | Project to Open a Confectionery Shop | Pupunha Palm Heart Projects | Soy Processing Project | Cajuina Factory Equipment | Dog Hosting Model |

 

Other projects ready:

How to start Factory to Produce Pies with capacity for 1.000 Kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with Blue Mould (Roquefort, Gorgonzola), with capacity of 8000 liters/day.
PDF Factory to Produce Freeze-Dried Powder Egg with capacity for 500 Kg/day.
Plant and layout Factory to Produce Sealing for Plates with capacity for 100 Kg/day.
Project Factory to Produce Chicken Sausages and Sliced Chicken with capacity for 5.000 Kg/day.
Project Small Factory of Cachaça (Liquor), Liqueur and Distilled (Cognaque), with an area of 200 m² and capacity for 500 liters/day. (To be built in a different level land).
FeasibilityIndustry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters.
Business plant Cachaça (Liquor) Factory, with capacity for 2.000 liters/day and a built area of 700 m². (To be built in a different level land).
Project Clothing Industry to Produce Stuffed Animal with capacity for 100 garments/day.
How to start Factory to Recycle Plastic with capacity for 3.000 Kg/day.

Project - how to start Smoker with capacity to produce 10 Kg/day.