Ready project Factory to Produce Wine, with capacity for 400.000 liters/year.

CODE - UV-016

Ready project Factory to Produce Wine, with capacity for 400.000 liters/year.

CODE - UV-016


Project ready with:

Industry with the following sections:
Grape Reception
Fermentation
Maturation
Bottling
Stocking
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Wine

How to start Factory to Produce Wine, with capacity for 400.000 liters/year. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Wine

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Academic Work on Wines | Sanitary Water Raw Materials Industry | Industrial Gases Business Plan | ATM - Capacity | Candy Store Templates | Legislation on Orthopedic Products | Peanut Candy Factory For Sale | How to Set Up a Drugstore Project | How to Start a Music School | How to Set Up a Poultry Refrigerator | Meat House Assembly | DWG Stadium Projects | Pre-Surgical Room Floor Plans | Physiotherapy Clinic Business Plan Ready | Party Area Project | Choperia Financial Plan | Dance Academy Layout | How to Start a Bowling Business | Car Wash Project Template | How to Open a Hotel for the Elderly | Laboratory Assembly for Bacteriological Analysis of Water | Raw Material for Buttons | Dyeing of Bras Fabrics | Raw Material for Disposable Clothing | Introduction of a Disposable Cup Factory Project | Plastic Recycling Industry Manufacturers | Wood Autoclave In Mg | Precast Blocks Dwg | Cement Plate Models | Buy Machine for Candy Molds | How to Set Up an Iron Beam Factory | Satellite Dish Production | UHT Equipment | Ice Factory Financial Plan | Business Plan for Battery Industry | Cosmetics Standard Operating Procedure | Lab Pops | How to Start a Bus Company | Set Up a Health Brokerage | How to Build Graphs | Business Plan for a School Transportation Company | Fruit Pulp Factory Layout | Facades for Pastry Dough Factory | How to Manage Sand Extraction | How to Start a French Fries Business | Guarana - Factory Project | Factory Project for the Production of Essential Oils Enge Tecno | Pet Cemetery Floor Plan |

 

Other projects ready:

How to start Leather Tannery (just until Wet Blue) with capacity to Produce 300 leathers/day.
Project Factory to Produce Cold Meat (with Deboned Meat Reception) with capacity for 3.000 Kg/day.
PDF Factory to Produce Synthetic Marble with Plastic Resin with capacity for 100 pieces per day.
Plant and layout Poultry House with capacity for 500 Broiler Breeders (to Produce Commercial Eggs and Selection of Eggs).
Project Laundry for Hotels with services for 100 rooms per day.
Project Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 15.000 Kg per day.
FeasibilityIndustry to Produce Body Soap and Soap in Bars with an area of 200 m² and capacity for 2.000 kg/day.
Business plant Factory to Produce Pequi Paste and Canned Pequi with capacity for 500 Kg per day
Project Factory to Produce Wax with capacity for 1.000 Kg/day.
How to start Clothing Industry to Produce Knitwear and Sweatshirts with capacity for 500 garments/day.

Project - how to start Factory to Produce Wine, with capacity for 400.000 liters/year.