Ready project Factory to Recycle Plastic with capacity for 3.000 Kg/day.

CODE - EFL-017

Ready project Factory to Recycle Plastic with capacity for 3.000 Kg/day.

CODE - EFL-017


Project ready with:

Project with the following sections:
Plastic Reception
Selection
Separation
Storage
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Recycle Plastic

How to start Factory to Recycle Plastic with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Recycle Plastic

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

OQ Plastic Factory | View a Complete Recycling Project | Recycling Industry Physical-Financial Schedule Template | Recycling Consulting Company | Financing for Plastic Recycling | Plant Model of a Recycling Factory | How to Set Up a Plastic Recycling Business | Ready-made Recycling Project Template | Plastic Assembly Process | Bndes Industry Recycling Financing | Ready Business Plan for Plastic Factory | See a Project Made About Recycling | Financing for Plastic Recycling Company Project | How to Set Up a Plastic Recycling Factory | Laying Shed Models | Names for Candy Store | Toothpaste Production Flowchart Raw Material Reception | Bra Quote From Store | Perfume Store Designs | Gas Stations DWG | What Do I Need to Buy to Set Up a Juice Bar? | Open a Disposable Company | Ready-made Projects for Haberdashery Stores | Coconut Opening Equipment | Beverage Business Plan | How to Open a Scrapyard | Business Plan for a School | Special Goat Cuts | Profitability of a Soccer Field | What Do I Need to Set Up a Dental Radiology Clinic? | Pop Template for Dental Office Ready | Example of a Commercial Kitchen Work Schedule | How to Open a Movie Theater | Spa Organization Chart | How to Set Up a Pizzeria for 50 People | Documentation to Open a Nursing Home | Nursing Home Layout | Marble Works Assemble | Biquine Shop Business Plan | Orthopedic Footwear | How Do I Set Up a Fiberglass Products Factory? | Charcoal Production | Mobile Sawmill Models | Concrete Production Process | Wood Stove Plan with Barbecue and Oven | Maromba Making Common Bricks | How to Create an Organizational Chart for a Steel Manufacturing Company | Cytology Laboratory Equipment | How to Set Up a Dairy Beverage Industry | Hospital Project Model | Floor Plan of Body Shop | Standards for the construction of a skate park | Ready-to-Drugstore Pops | Procedure for Setting Up a Business | How to Start a Podiatry Business | How to Create a Floor Plan for an Association | How to Set Up a Call Center with an Organizational Chart | Sound Workshop Open | How to Open a Translation Office | Feed Factory Layout | Layout of a Ceramic Industry | Bakery Design Templates | Snack Factory Buy | Palmito Organization Chart | Yam Flour Price | Pharmaceutical Tablet Industry Project |

 

Other projects ready:

How to start Slaughterhouse for Bovines and Swines and Cold Meat Production (salsage, hams, Cold Meat and curred food) and Charque Processing - 50 animals/day - area of 800 m² (956,8 sq.yd).
Project Slaughterhouse for Swine Slaughter and Cold Meat production (Sausages, Hams, Cold Meat and Cured Food) - 150 animals/day - area of 1.500 m² (3588 sq.yd).
PDF Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Premolded Rock Soil with capacity for 1.000 m2/day.
Project Factory to Produce Pastry Dough with capacity for 15.000 kg/day.
Project Factory to Produce Cachaça of Honey with capacity for 300 liters/day.
FeasibilityCold Storage Room to Produce Frozen and Threaded Fishes and Fish Products with capacity for 5.000 Kg/day.
Business plant Clothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 100 garments/day.
Project Factory to Produce Soft Drink with capacity for 40.000 liters/day.
How to start Milk and Dairy Industry for Sour Cheese production, with capacity of 3000 liters/day.

Project - how to start Factory to Recycle Plastic with capacity for 3.000 Kg/day.