Ready project Frog Meat Processing with capacity for 100 frogs per day.

CODE - FRIG-210

Ready project Frog Meat Processing with capacity for 100 frogs per day.

CODE - FRIG-210


Project ready with:


Industry with the following sections:

Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Frog Meat Processing

How to start Frog Meat Processing with capacity for 100 frogs per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Frog Meat Processing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Meat Processing Building | Goat Building Model | Financing for Feed Store | Open Tire Shop | Purchasing Equipment to Set Up a Rotisserie | Material for assembling acrylic and aluminum boxes | How to Set Up a Fabric Store for Decoration | Layout Design for Medication CD | I want to set up a basic food basket company | Public Schools Dwg Plans | Good Practices Manual Model for Refrigerators | Burger Making | Cats for Small Sausage Production | Set up Maternity | Psf Plant | Emergency Aid Project | Catering Business Plan | Guesthouse Bedroom Designs | Business Plan25c325b3cios Mexican Restaurant | Boate2c Business Plan | Ready-to-use car wash forms | Children's Buffet for 200 People | Pharmaceutical Industry Floor Plan Template | Small Production Crusher Price | Clothing Manufacturing Flowchart | Scrape for Glove Manufacturing | Physical arrangement of cafeteria | Platisca Ruler Manufacturing | Toys Wood Plants | How to Start a Wooden Car Body Factory | How to Make Concrete Posts for Sale | Pipe Factory How To Assemble | How to Manage an Aluminum Frame Factory | Machining Shop Sales | Expenses Setting Up Prosthetics Laboratory | Machines for Producing Liquid Chocolate Drinks | Location of the Clothing Area in Clinical Analysis Laboratories | Hot Dog Cart Business Plan | The No Dairy Pops | How to MakeStandard Operating Procedure | Physical Arrangement Floriculture | Setting Up a Software Development Company | Leault Accounting Office Project | Fire Project Budget Template | I Want to See Addresses of Pig Farms in MG | Confectionery Manufacturing | Cream Cracker Biscuits Additives | Annatto Doc | Jam Flowchart | How to Manufacture Pepper | Opening a Company - Panificadora2c Installation and Processing |

 

Other projects ready:

How to start Factory to Produce Fried Garlic and Grinded Garlic with capacity for 5.000 kg/day.
Project Animals Hotel with capacity for 100 animals.
PDF Factory to Produce Dehydrated Fruits with capacity for 300 Kg/day.
Plant and layout Factory to Produce Soft Drink with capacity for 40.000 liters/day.
Project Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 10.000 Kg per day.
Project Slaughterhouse Bovines, Swines and Ostrich with capacity for 10 animals per day.
FeasibilityImprovement Unit of Seeds used to Feed Livestock with capacity for 3.000 Kg/day.
Business plant Industry to Produce Creams, Hair Conditioner, Hand and Body Cream, Suntan Lotion with capacity for 3.000 Kg/day.
Project Factory to Produce Dehydrated Pepper with capacity for 5.000 Kg/day.
How to start Cold Storage Room to Process ALIVE and Stunned Shrimps and Fresh, Frozen and Breaded Fishes and Fish Hamburguers with capacity to Produce 10.000 Kg/day.

Project - how to start Frog Meat Processing with capacity for 100 frogs per day.