Ready project Gymnasium with capacity for 700 alunos per day.

CODE - HT-063

Ready project Gymnasium with capacity for 700 alunos per day.

CODE - HT-063


Project ready with:

Enterprise with the following sections:
Reception
Swimming Pool
Gym Room
Working Out Area
Dressing Rooms
Assessment Room
Office
Service Area
Parking Lot
Other Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Gymnasium

How to start Gymnasium with capacity for 700 alunos per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Gymnasium

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout Plan For Gym | Financial Feasibility Study Academia Gisnatica | Proger For Gym Equipment | Financial Feasibility Study of a Ready-Made Gym | Dwg Academy | Creation of a Weight Room Layout | Weight Room Layout | Dwg Academy Files | Bndes Finances a Gym | Gym Floor Plan | Open a Gym with BNDES | Gym Equipment by BNDES | Example of a Gym Layout | Consulting to Open a Gym | Financial Statements for a Bodybuilding Academy | Dwg Academy | How to Organize Equipment at the Gym | Business Creation by Students | Proger Gymnastics Academy Financing | Financed Gym Equipment | How to Finance Gym Equipment Through Proger | Proger Gymnastics Academy | Gym Floor Plan | Bodybuilding Academy Organize | How to Organize Equipment in a Gym | Gym Layout | Credit Bnds Gym Bodybuilding Sp | Gym Room Layout | Gym Layout | P2f Gymnastics Equipment Plant | Equipment in a Bodybuilding Gym | Weight Room In Dwg | How to Organize Gym Students | Credit Bodybuilding Academy | Gym Layout Template | Project to Set Up a Weight Training Room | How to Organize Your Weight Training Equipment | Gym Floor Plan Template | How to Organize Equipment at the Gym | Bndes Financing for Bodybuilding Academy | Proger Academy | How to Organize Equipment at the Gym | Gym Equipment Funded by Proger | How to Set Up a Project for an Apae School Academy | Gym Equipment .dwg | Investment Project for a Gym | Bndes Investment for Academy | Bodybuilding Gym Project for Financing | How to Organize Gym Equipment | Organize Gym Equipment | Introduction Model of a Paint Factory | 150,000 Computer Store Project | Investment for Exhaust Shop | Gas Station Investment Viability | Plants for Juice House | Quantities of Products to Open a Disposables Store | How to Set Up Haberdashery Stores | Making Jelly | How to Set Up a Drink Sales Scheme at Parties | Rubble Recycling Organization Chart | English Project Company | Feed with 3000 Chickens | Company Building Quadra Society R24 | How Much Does It Cost to Set Up a Dental Radiology Practice? | Project to Set Up a Dental Office | Industrial Kitchen 500 Meals | 6D Cinema Equipment | Spa Plant Drawings | Gas Station Flowchart | Nursing Home Floor Plans | Massage Projects | Production Parenteral Solutions Brazil | Ready Production Organization Chart | T-Shirt Printing Project | Open Underwear Manufacturing | Insole and Sole | Helmet Work Factory | Skewers Factory Model | Morumbi Shopping.dwg | Blocks Viability | Wood Stove and Barbecue Cad Block | Brick Factory Projects | Layout for Assembling Foundry | Clinical Laboratory Project Analysis | Yogurt Factory | Commercial Laundry Project | Setting Up a Motorcycle Workshop | Skate2c Ramp Design To Assemble | Standard Operating Procedure for Commercial Pharmacy Ready-to-Use Products | Pop Model In Pest Control | Ready-made Business Plan for Atelie | Ready-Made Agriculture Project | How to Set Up an Air and Road Transport Company | Upholstery Cleaning Business Tips | Equipment for Setting Up a Taxi Company | Fertilizer Production Organization Chart. | Milk Carton Tiles | Pop for French Bread Production | Juice Industry Plant | Shiitake Models | Corn Manufacturing Flowchart | Veterinary Clinic Floor Plan |

 

Other projects ready:

How to start Slaughterhouse Bovines, Swines and Ovines with capacity for 10 animals per day.
Project Deliverer of Gas Cylinder for Kitchen with capacity for 500 Cylinders per day.
PDF Factory to Produce Pepper Powder, Dehydrated Pepper, Pepper Paste, in Natura Pepper, Capsaicin and Pepper Oleoresin with capacity for 300 kg/day.
Plant and layout Industry to Produce Aerosol Products (Deodorant, Hairspray) with capacity for 5.000 Kg/day.
Project Slaughterhouse Ostrich Slaughter with capacity for 75 animals/day.
Project Factory to Produce Capsaicin with capacity for 1.000 Kg/day.
FeasibilityFactory to Produce Banana Ripe Nectar with capacity for 5.000 Kg/day.
Business plant Factory to Produce Freeze-Dried Powder Egg with capacity for 300 Kg/day.
Project Clothing Industry to Produce T-Shirts with Printing Sector and with capacity for 100 garments/day.
How to start Poultry House with capacity for 5.000 Broiler Chickens and a Built area of 700 m².

Project - how to start Gymnasium with capacity for 700 alunos per day.