Ready project Industrial Bakery to Produce Cakes with capacity for 3.000 Kg/day.

CODE - TRG-149

Ready project Industrial Bakery to Produce Cakes with capacity for 3.000 Kg/day.

CODE - TRG-149


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cooling Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industrial Bakery to Produce Cakes

How to start Industrial Bakery to Produce Cakes with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industrial Bakery to Produce Cakes

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Cake Making In Brazil Flowchart | How to Assemble Cakes in Production | How to Make a Cake Flowchart | Bakery Production Flowchart | Bakery Flowchart | Cake Design Templates | Flowchart of Materials Lists for a Cake | Cake Production Flowchart | How to Create an Industrial Company | Preparation and Production of Bakery Project | Cake Production Flowchart | Facade Cakes | Cake Production Flowcharts | Bakery Cake Production Flowchart | Cake Production Flowchart | Bakery Production Layout | Flowchart of Cake Production in Bakery | Model of an Industrial Project | Industrial Bakery Flowchart | Setting Up a Brewery | Broiler Farm Construction Project | It Pays to Set Up a Cleaning Products Factory | Machinery for Soap Making Bnds | How Much Capital Do I Need to Open a Screw Shop? | I Want To Do An Oil Change | Products for Diabetics and Hypertensive Patients | How to Open a Bakery | Gift Shop Installation Project | How to Set Up a Cantry Style Store | Equipment for the production of chocolates | Ready-made Cold Cuts Business Plan | Financing to Open a Nursery | Budget for Construction of Settling Pond | How to Set Up a Pork Rind Factory | Packaging for Smoked Shrimp | Tools for Setting Up an Occupational Therapy Office | Suppliers In Brazil Hospital Waste Incinerator | Incinerator Models | Pastry Study | What It Takes to Set Up a Lunchbox Business | How to Assemble Sauna Machines | Floor Plans for Snack Bars | Bndes Clinic Financing | Cost of Setting Up a Sterilization Center | Glass Recycling Factory | Lavanderia Industrial Jeans Sp | Where to Buy Ready-Made Mold for Plaster Making | Glass Company Organization Chart | How Much Does Granulated Styrofoam Cost? | How Briquettes Are Made | Descriptive Memorial of the Wooden Pallet Manufacturing Process | Gypsum Manufacturing Flowchart | Fabricacadern | How to Prepare a Metalworking Budget | Set up a Gas Cylinder Factory - 50 units per day | Gas Company Organizational Chart Template | Soil Laboratory Equipment | Who Makes the Cheeses | Model | Set up Electronic Injection Workshop | Egg Powder Work | Standard Operating Procedure Template for Hospitals | Warehouse Plan Templates | Ready-made Business Plan for Exchange Agency | Law Business Plan | Set Up A TV Repair Shop | Setting Up a Notary's Office | Project Ready for BNDES | How to Open a Cake Factory | How to Set Up a Bakery | Palm Heart Factories | Caffeine Factory | Equipment for Cajuina Production | How to Set Up a Dog Hosting Project |

 

Other projects ready:

How to start Factory to Produce Banana Sweet with capacity for 10.000 Kg per day.
Project Radiology Clinic and Dental Radiology with an area of 400 m2.
PDF Swine Farm (with Overlapping Bed) with capacity to Produce 1.120 Matrix.
Plant and layout Factory to Produce Fodder for Sharks with capacity for 1.000 Kg/day.
Project Clothing Industry to Produce Knitwear with Printing Sector with capacity for 200 garments/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 2000 liters/day.
FeasibilityFactory to Produce Sour Starch (produced with Manioc Starch) with capacity for 3.000 Kg per day.
Business plant Factory to Produce Fodder in Cans for Dogs and Cats with capacity for 20.000 Kg/day.
Project Factory to Produce Vinegar made from Banana with capacity for 100 liters/day.
How to start Factory to Produce Concrete Lamppost with capacity for 1.000 units/day.

Project - how to start Industrial Bakery to Produce Cakes with capacity for 3.000 Kg/day.