Ready project Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day.

CODE - FRA-004

Ready project Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day.

CODE - FRA-004


Project ready with:

Industry with the following sections:
Stunning area for Ostriches
Evisceration
Inspection Department
Cold Storage for Carcass
Carcass Expedition
Room for Plumes
Room for Leather
Cold Storage for Leather
Craws and Guts
Cold Storage for Small Guts
Room of Boneless Meat
Room for Bones
Freezing Tunnel
Cold Chamber for Meat
Expedition
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Ostrich Slaughter

How to start Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Ostrich Slaughter

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.Manure Projects | Chocolate Production Flow | Making Cotton Swabs | How to Set Up an Electrical Supplies Store | Storefront Oil Change | How to Open an Antenna Store | Materials for setting up a pamonharia | Multicoisas Suppliers | How to Set Up a Bed2c, Bath and Tableware Store | Flowchart of Equipment for the Production of Sweets and Jams | I Want to Open a Beverage Deposit | Budget-project for a tire recycling plant | Nursing Business Plan | Cattle Stunning Where to Buy | Corporate Nursing Room Preparation | Floor Plan of a Radiology Office | Dental Clinic Floor Plan | Motel Flowchart | Ready Project For Construction Of Cinema Room | Kitchen Assemblies Just for Serving Marmitex | Gas Station Project Template | How to Set Up Your Coconut Water Business | Clinical Viability of Physiotherapy and Aesthetics | Pop Disposable Diapers | Feasibility Project for a Toilet Paper Factory | Business Plan for Shirt Shop | How to Start a Handbag Business | Flip Flop Industry With Flowchart 28havaianas29 | Wooden Clothespin Manufacturer | How to Make a Pool Table | Vibrating Table for Feed | Satellite Dish Factory | Business Plan for a Brick Company | Wheelchair Wheel Factory | Clinical Analysis Laboratory Project Templates | Layout of a Dairy Yogurt Production Plant | Dyeing Installation Project | Mechanical Workshop Project | Preparation of Model Procedure Manual | Dwg | Equipment Needed to Set Up a Sculpture Studio | Pest Control Company Flowchart Template | How to Open Umj Dispatcher Office | Economic Viability Study of Vehicle | Organizational Chart of a Machinery Rental Company | Feed Factory Flowchart | Soil-cement tile | How to Set Up a Party Snack Factory | Pouvilho Biscuits Industry in Poços De Caldas | Spice Drawing | Veterinary Office Floor Plan |

 

Other projects ready:

How to start Factory to Produce Liquid Chocolate with capacity for 20.000 liters por day.
Project Center of Plagues and Insects Control with an area of 100 m2.
PDF Cachaça (Liquor) Factory, with capacity for 5.000 liters/day and a built area of 1.100 m². (To be built in a flat land).
Plant and layout Industrial Bakery to Produce French Bread with capacity for 500 Kg/day.
Project Factory to Produce Toasted Cashew Nut with capacity for 5.000 Kg per day.
Project Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 25.000 Kg per day.
FeasibilityIndustry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 20 liters.
Business plant Factory to Produce Pepper Oleoresin with capacity for 5.000 Kg/day.
Project Lan House with capacity for 50 computadores.
How to start Factory to Produce Costume Jewelry with capacity for 3.000 jewelries per day.

Project - how to start Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day.