Ready project Industrial Kitchen without Restaurant with capacity for 750 meals per day.

CODE - HT-016

Ready project Industrial Kitchen without Restaurant with capacity for 750 meals per day.

CODE - HT-016


Project ready with:

Enterprise with the following sections:
Reception Area for Raw Material
Selection and Cleaning of Raw Material
Storage of Raw Material
Initial Preparation
Cooking
Packaging
Expedition
Utensilis Cleaning
Storage of Utensilis
Service Area
Other Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industrial Kitchen

How to start Industrial Kitchen without Restaurant with capacity for 750 meals per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industrial Kitchen

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Industrial Cooking Plant | Industrial Kitchens Model for Construction | Summary of Industrial Kitchen Construction Standards | Non-Industrial Kitchen | Industrial Kitchen Floor Plan Model | Industrial Kitchen Construction Manual | Industrial Restaurant Consulting | Industrial Restaurant Construction Projects | Industrial Kitchen Construction Standard | Industrial Kitchen Construction Legislation | Industrial Kitchen Plan2cplant P2fconstruction | Pilot Kitchen Snack Plan Model | Industrial Kitchen Pl5cnta Template | Restaurant Model Construction | Regulations for the Construction of Industrial Kitchens | Legislation for Setting Up an Industrial Restaurant5d | Example of an Industrial Restaurant | Standards for Industrial Kitchen Construction | Basic Manual for Planning and Designing Restaurants and Industrial Kitchens | Kitchen Construction Standards | Industrial Kitchen Design Standards View Models | Legislation for the Construction of Kitchens and Restaurants | Rules for Kitchen Construction | Industrial Kitchen Legislation | How to Make an Industrial Kitchen Plan | Industrial Kitchen Construction Companies | How to Start a Restaurant | How to Design an Industrial Kitchen | Standards for the Construction of Industrial Kitchens | Industrial Kitchen Construction | Standards for Building an Industrial Kitchen | Standards for Construction of Industrial Kitchens | Restaurant Construction Legislation | How to Make a Restaurant Design | How to Design an Industrial Restaurant | Industrial Kitchen Standards | Industrial Kitchen Quality Control | Industrial Kitchen Project Floor Plan | Industrial Kitchen Design Plans | Kitchens for Micro Restaurants | Industrial Kitchen Construction Legislation | Basic Manual for Planning and Designing Restaurants and Industrial Kitchens | Regulations for the Construction of Industrial Kitchens | Industrial Kitchen Consulting | Rules for Building an Industrial Kitchen | Kitchen Layout Standards | Model of a Floor Plan of an Industrial Kitchen | How to Start a Commercial Kitchen | Kitchen Construction Standards | .Standards for Restaurant Construction | I Want to Set Up a Cleaning Products Factory | I Want to Set Up a Screw Material Store | Project to assemble an oil change | How to Open a Rotisserie Chicken Shop | How Do I Set Up a Fish Market? | Tempered Glass Poços De Caldas | Women's Clothing Store Timeline Template | Gummy Candy Project | Beverage Dispenser Layout | Business Plan for Setting Up a Nursery | Ostrich Project Template | How Much Cleaning Product Is Spent In A Sausage Factory | Shrimps Fish Processing | Company for Sterilization of Clothes | Hospital Business Plan | Vaccination Room Mobilization Project | Gym Equipment Bndes | Fish and Pay Business Plan | Lunch Box Business Plan Without Restaurant | List of Equipment for Setting Up a Bar | Snack Bar Projects | Residential Construction Schedule | Hematology Laboratory Plant | Set up an epoxy paint factory | Lingerie Factory Organization Chart | Ball Manufacturing Equipment | I want a PVC lining factory | Styrofoam Block In Bh | How to Set Up a Sawmill Project | How to Make Matchsticks | Equipment Needed to Set Up a Small Mortar Factory | Egg Carton Factory | How to Register a Metalworking Shop with Sebrae | Cold Galvanizing Products | Analysis Laboratory Business Plan | Set up a cheese factory | Bpf and Mbpf | Project Template for Setting Up a Body Shop | Smoked Quail Eggs Recipe | Pop Hospital Model | Cooking Gas Drawings | Barber Shop Models | Commercial Office Floor Plan | Office Facade Projects | How to Assemble a Chandelier Factory | Set Up a Model Factory | Pig Farming Fattening | How to Set Up a Pizza Dough Industry | Pamonhas for 100 | Packaged Popcorn | Oat Flakes Factories | Selling Powdered Juice Factory | How to Design a Cat Hotel |

 

Other projects ready:

How to start Sports Gym (Polysportive) with capacity for 3.000 people, to be Built in Flat Land.
Project Factory to Produce Banana Raisin with capacity for 50.000 Kg/day.
PDF Cold Storage Room to Process ALIVE and Stunned Shrimps and Frozen and Threaded Fishes with capacity to Produce 40.000 Kg/day.
Plant and layout Hotel with capacity for 20 rooms.
Project Cold Storage Room Shrimp Processing with an area of 400 m² (478,4 sq.yd) and capacity for 9.000 kg/day. Reception area for Stunned Shrimp.
Project Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 1.000 garments/day.
FeasibilityFactory to Produce Popsicles with capacity for 1.000 Kg/day.
Business plant Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 10.000 birds/day.
Project Shed to Cut Glass with capacity to Produce 1.000 m2/day.
How to start Cold Storage Room for Cured Fish production with area of 260 m² (310,96 sq.yd) and capacity for 3.000 kg/day.

Project - how to start Industrial Kitchen without Restaurant with capacity for 750 meals per day.