Ready project Industry to Produce Footwear with capacity for 100 pairs/day.

CODE - IND-D-014

Ready project Industry to Produce Footwear with capacity for 100 pairs/day.

CODE - IND-D-014


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Footwear

How to start Industry to Produce Footwear with capacity for 100 pairs/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Footwear

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.raw material for making shoes | Download Dwg Corral Plan | Shampoo Manufacturing Machinery Suppliers | How to Open a Sportswear Store | Tips for Setting Up a Car Rental Company | Design of a wine shop | Open Chocolate Shop | Epi Store Viability | Jewelry Store Layout | Leather Tanning Company in Franco and Region | How to Make a Drugstore Plant | How to Open a Music School | Meat Boutique Floor Plan | Football Field In Dwg | Operating Room Project | How to Set Up a Physiotherapy Clinic with Hydrotherapy | Utis Plants | Floor Plan for Hotel Projects with 30 Apartments | Hypermarket Floor Plates | Squash Court Construction Project | Bowling Suppliers | Car Wash Station Floor Plan | What do I need to sell lunch boxes? | Raw Material for Making Pens | Equipment for Vegetable Loofah | Knitwear and Sweatshirt Models | Assembling Bed Table Bath Making | Raincoat Manufacturing Process | Plastic Wood Making Machine | MDF Packaging In Florianopolis | Concrete Block Business Plan | Concrete Plants Assemblies | Set Up Paper Packaging Company | Pan Factory Layout | Barbecue and Roofing Plan Project | Planning to Set Up a Prosthesis Laboratory | Dairy Production Plant | Flake Ice Equipment Suppliers | Battery Factory Legislation | How to Make a Cosmetic Pop | Pop Clinic Model | Service Flow and Software Factory | Nursery Construction Project | Organizational Chart of a Container Rental Company | Quick Graphics Project | Speedometer Course | Ice Cream Factory Plant | Fresh Pasta Business | Grape Juice Company Floor Plan | Industry for Processing Brazil Nuts | Tofu Cheese Factory In Brazil | Set Up a Cemetery |

 

Other projects ready:

How to start Factory to Produce Concentrated Fruit Pulp with capacity for 500 Kg/day.
Project Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 40.000 Kg per day.
PDF Factory to Produce Cashew-nut Candy in Syrup, Durina Candy in Syrup and Mangaba Candy in Syrup, with an area of 180 m² (215,28 sq.yd.) and capacity for 2.000 kg/day.
Plant and layout Factory to Produce Mass for Soap and Body Soap with capacity for 700 kg/hour.
Project Factory to Produce Jerked Beef (Salted Fresh Meat), with Deboned Meat Reception, and capacity for 10.000 Kg/day.
Project Factory to Produce Dry Coconut Grated with capacity for 10.000 Kg per day.
FeasibilityQuality Control Laboratory for Food Industries with an area of 300 m².
Business plant Factory to Produce Sour Starch (produced with Manioc Starch) with capacity for 1.000 Kg per day.
Project Factory to Produce Mattress with capacity for 300 mattress per day.
How to start Lottery Agency with an area of 30 m2.

Project - how to start Industry to Produce Footwear with capacity for 100 pairs/day.