Ready project Industry to Produce Footwear with capacity for 100 pairs/day.

CODE - IND-D-014

Ready project Industry to Produce Footwear with capacity for 100 pairs/day.

CODE - IND-D-014


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Footwear

How to start Industry to Produce Footwear with capacity for 100 pairs/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Footwear

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.raw material for making shoes | Download Dwg Corral Plan | Shampoo Manufacturing Machinery Suppliers | How to Open a Sportswear Store | Tips for Setting Up a Car Rental Company | Design of a wine shop | Open Chocolate Shop | Epi Store Viability | Jewelry Store Layout | Leather Tanning Company in Franco and Region | How to Make a Drugstore Plant | How to Open a Music School | Meat Boutique Floor Plan | Football Field In Dwg | Operating Room Project | How to Set Up a Physiotherapy Clinic with Hydrotherapy | Utis Plants | Floor Plan for Hotel Projects with 30 Apartments | Hypermarket Floor Plates | Squash Court Construction Project | Bowling Suppliers | Car Wash Station Floor Plan | What do I need to sell lunch boxes? | Raw Material for Making Pens | Equipment for Vegetable Loofah | Knitwear and Sweatshirt Models | Assembling Bed Table Bath Making | Raincoat Manufacturing Process | Plastic Wood Making Machine | MDF Packaging In Florianopolis | Concrete Block Business Plan | Concrete Plants Assemblies | Set Up Paper Packaging Company | Pan Factory Layout | Barbecue and Roofing Plan Project | Planning to Set Up a Prosthesis Laboratory | Dairy Production Plant | Flake Ice Equipment Suppliers | Battery Factory Legislation | How to Make a Cosmetic Pop | Pop Clinic Model | Service Flow and Software Factory | Nursery Construction Project | Organizational Chart of a Container Rental Company | Quick Graphics Project | Speedometer Course | Ice Cream Factory Plant | Fresh Pasta Business | Grape Juice Company Floor Plan | Industry for Processing Brazil Nuts | Tofu Cheese Factory In Brazil | Set Up a Cemetery |

 

Other projects ready:

How to start Milk and Dairy Industry for Packed Milk production types B and C, with capacity of 1000 liters/day.
Project Slaughterhouse for bovines slaughter and Charque - 125 animals/day - area of 1.300 m² (1554,8 sq.yd).
PDF Slaughterhouse Quail with capacity for 10.000 animals per day.
Plant and layout Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 500 garments/day.
Project Factory to Produce Ice Lolly Stick with capacity for 100 Kg/day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 10.000 Kg/day.
FeasibilityFactory to Process Grated Coconut, Coconut Water and Coconut Milk (Dwarf Coconut), with capacity for 3.000 kg per day and area of 375 m².
Business plant Leather Tannery (just until Wet Blue) with capacity to Produce 500 leathers/day.
Project Industrial Laundry with capacity for 3.000 kg of Clothes per day.
How to start Factory to Produce Soy Milk with capacity for 10.000 liters per day.

Project - how to start Industry to Produce Footwear with capacity for 100 pairs/day.