Ready project Slaughterhouse Ovines with capacity to slaughter 500 animals/day.

CODE - FRC-043

Ready project Slaughterhouse Ovines with capacity to slaughter 500 animals/day.

CODE - FRC-043


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Ovines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Antechamber
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Section for Small Guts
Cold Chamber for Small Guts
Small Guts Packaging
Small Guts and Guts Expedition
Lower Floor:
Rendering Reception Section
Horn and Leather Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Offices
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Ovines

How to start Slaughterhouse Ovines with capacity to slaughter 500 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Ovines

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Sheep Farming Ready Projects | - Frc 043 | Construction Project for Capril | Structure for Feed House | Ready-made Business Plan | Roast Chicken Resale | Fishmonger Equipment Suppliers | Belly Dance Clothes For Sale | Drug Distribution Flowchart | What Materials Do I Use to Assemble Commemorative Baskets? | How to Set Up a Daycare Project | Names for Male Calf | Frozen Food Financing | How to Start a Pig Slaughtering Plant | Maternity Ward Physical Plan | Square Meters Psf | How to Manage an Emergency Room | Financing to Open a Guest House | How to Develop a Kilo Restaurant Project | Ready-Made Nightclub Project | How to Make a Car Wash | How to Set Up an Art Exhibition | Tablet Production Room | What is the area to open a retreading shop? | Clothing Industry Model | Glove Making Mold | Mini Bag Factory | What You Need In A Makeup Room | How to Set Up a Sustainable Toy Factory | Design and Construction of Wooden Kayaks | Fireplace Floor Plan | Economic Viability of Feed Factory | Factory Keys | Set up a machining workshop | Documentation Required to Open a Prosthesis Laboratory | How to Organize a Company in the Dairy Industry | Good Manufacturing Practices for Cafeterias | All About Sales of Rubber Products | Download Pop Cross Contamination Prevention Pharmacy | Standard Operating Procedures Template for Veterinary Practice | Photography Studio Company Organization Chart | Manicure Room Project | Motorcycle Dealership Project | View 3d Model Of Accounting Office Design | Fire Extinguisher Refilling Machine | Cost of Setting Up a Pig Farm | Equipment for Cake Making Company | How to Set Up Sandwich Production | Shredded Coconut Manufacturing | Grain Warehouse Project Dwg | Leather Dog Bone Factory |

 

Other projects ready:

How to start Factory to Produce Ice Cream Syrup with capacity for 3.000 Kg/day.
Project Café with capacity for 70 people.
PDF Factory of Crystallized Banana Candy, with capacity for 3.000 kg/day and an area of 2.00 m² (239,2 sq.yd.).
Plant and layout Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters and bottles of 1 and 2 liters.
Project Footwear Industry to Produce Sneakers with capacity for 1.000 pairs/day.
Project Bakery to Produce Dog Products (Panetoni, Cookie, Cracker, etc) with an area of 50 m2.
FeasibilityIce Cream Parlor with an area of 300 m2.
Business plant Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 500 Kg per day.
Project Factory to Produce Paper Coffee Strainer with capacity for 300 boxes/day.
How to start Rendering with capacity for 100 tons/day.

Project - how to start Slaughterhouse Ovines with capacity to slaughter 500 animals/day.