Ready project Industry to Produce Footwear with capacity for 200 pairs/day.

CODE - IND-D-015

Ready project Industry to Produce Footwear with capacity for 200 pairs/day.

CODE - IND-D-015


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Footwear

How to start Industry to Produce Footwear with capacity for 200 pairs/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Footwear

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Footwear FactoryManufacturing Process | Footwear Production Layout | Investment to Set Up a Soap Factory | How to Make Liquid Soap Flowchart5d | Projects for Electrical Material Stores | To Set Up Oil Change Shop | Financing for Agricultural Stores | Physical Arrangement Layout of an Electronics Company | Gas Store Project | Underwear Store Business Plan | Where Chewing Gum Is Made | What is needed to set up a food distributor? | Ready-made Budget for Nursery | P2f Office Rooms and Projects | Financing for Sausage Factory | Pigsty Projects | Small Hospital Model | The Radiology Organization Chart Model | Audiology Clinic Material | Motel Floor Plan Idea | How to Start a Swimming School | Kitchen to prepare lunch boxes | Convenience Store Projects for Gas Stations | Small Lobby Bar Constructions | Financial Management of a Massage Clinic | Construction of Injection Room | Resin Sink Manufacturers | Jeans Sewing Factory Layout | Want to Set Up a Sock Factory | Project Straw | How to Set Up a Sandblasting Company | I Want to Work From Home Making Clothes Pegs | Skateboards Production Daily | Pole Factory For Sale | Who Makes Coffee Filter Paper? | Products for Assembling a Galvanization | Gas Cylinder Floor Plan | Clinical Analysis Laboratory Assembly Project | Provolone Cheese Processing Flowchart | How to Set Up an Epi Material Company | Mechanical Workshop Layout | Aesthetic Center Projects | Recycling Workshop Plan | Business Plan Condominium Administrator | Open Engineering Office | What is needed to set up a computer maintenance workshop? | Create Provider | Soft Drink Production Layout | Bread Production Flow | I want to set up a gnocchi factory | Small Banana Candy Factory | Mg Packaging Industry | Viability of Orange Juice | Financing to Set Up a Kennel |

 

Other projects ready:

How to start Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 1.000 garments/day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Carcass Reception) with capacity for 5.000 Kg/day.
PDF Factory to Produce Hydrophilic Cotton with capacity for 1.000 packages per day.
Plant and layout Radiology Clinic and Dental Radiology with an area of 1.000 m2.
Project Factory to Produce Paint with capacity for 1.000 liters/day.
Project Restaurant 500 meals per day.
FeasibilityBreastfeeding with a Collection capacity for 10 donation chairs.
Business plant Factory to Produce T-Shirts with capacity for 100 units por day.
Project Factory to Produce Essential Oils (Mint Leaf, Eucalyptus Leaf, etc.) with capacity for 500 liters/day.
How to start Factory to Produce Freeze-Drying Food with capacity for 500 Kg/day.

Project - how to start Industry to Produce Footwear with capacity for 200 pairs/day.