Ready project Industry to Produce Footwear with capacity for 50 pairs/day.

CODE - IND-D-013

Ready project Industry to Produce Footwear with capacity for 50 pairs/day.

CODE - IND-D-013


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Footwear

How to start Industry to Produce Footwear with capacity for 50 pairs/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Footwear

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Setting Up a Cattle Confinement Structure | How to Set Up Cosmetics Packaging Factory | How to Open a Cell Phone Store | Fishing Shop Projects | Bank Branch Floor Plan | Sweet Company Project | Set Up a Menswear Store | How to Set Up a Candy and Jelly Factory | Homeopathy Mount | Ebook Wastewater Treatment | How to Set Up a Room for Private Lessons | Goat Slaughter Equipment | How to Set Up a Pie Industry | Financing for Social Courts | Surgical Center Flowchart | How Much Do I Need to Set Up a Physiotherapy Practice? | Dwg Project For Health Academy | Beer Manufacturing Flowchart | Weight Training Equipment Drawing | How Much Does It Cost to Set Up a Bowling Alley? | Car Wash Plants | Cost of setting up a physical chemistry laboratory | Raw Material for Making Crayons | How to Start a Computerized Embroidery Business | Costs in Dyeing | Plastic Packaging Factory Layout | What Does It Take to Set Up a Porcelain Factory? | Wood Autoclave Assembly | Equipment Required to Assemble a Precast Factory | Slot Car Layout Plan | Machine for Making Paper Cups for Sweets | How to Open an Acrylic Company | How to Set Up a Milk Factory | Equipment for Making Cottage Cheese | Moto Home Projects | Popular Two Bedroom House Plan Model | Ready Pop About Water Potability | Operational Process in Laboratory | Bus Floor Plan | Setting Up A Rapid Delivery Company | Business Plan for a Printing Company | Pool Cleaning Quote | .motorcycle autoparts | Fruit Production Technology | Cost of Opening a Tapioca Flour Factory | Organic Garden Economic Viability | Potato Washer - Manufacturers & Suppliers | Coconut Ice Factory | Food Business Plant Models | How to Set Up a Crematorium |

 

Other projects ready:

How to start Poultry House with capacity for 1.000 Broiler Chickens.
Project Factory to Produce Fresh Dough for Pizza with capacity for 15.000 Kg/day.
PDF Clothing Industry to Produce Jeans Pants with capacity for 50 garments/day.
Plant and layout Factory to Produce Tomato Extract and Tomato Pulp with capacity for 50.000 Kg per day.
Project Slaughterhouse for Swine - 20 animals/day - area of 300 m² (358,8 sq.yd).
Project Factory to Produce Vinegar made from Cane Bagasse with capacity for 1.000 liters/day.
FeasibilityFactory to Produce Powder Soup with capacity for 3.000 Kg/day.
Business plant Factory to Produce Sour Starch (produced with Manioc) with capacity for 500 Kg per day.
Project Factory to Produce Popsicles with capacity for 1.000 Kg/day.
How to start Factory to put Cachaça (Liquor) in bottles, with capacity for 500 liters/day.

Project - how to start Industry to Produce Footwear with capacity for 50 pairs/day.