Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Industry to Produce Footwear with capacity for 50 pairs/day.
CODE - IND-D-013
Ready project Industry to Produce Footwear with capacity for 50 pairs/day.
CODE - IND-D-013
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Industry to Produce Footwear
OPTIONAL SERVICES:
Financial Feasibility Study of Industry to Produce Footwear with capacity for 50 pairs/day.
Business plan for Industry to Produce Footwear with capacity for 50 pairs/day.
3D project of Industry to Produce Footwear with capacity for 50 pairs/day.
Projects with other capacities
Industry to Produce Footwear
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
|
Setting Up a Cattle Confinement Structure
|
How to Set Up Cosmetics Packaging Factory
|
How to Open a Cell Phone Store
|
Fishing Shop Projects
|
Bank Branch Floor Plan
|
Sweet Company Project
|
Set Up a Menswear Store
|
How to Set Up a Candy and Jelly Factory
|
Homeopathy Mount
|
Ebook Wastewater Treatment
|
How to Set Up a Room for Private Lessons
|
Goat Slaughter Equipment
|
How to Set Up a Pie Industry
|
Financing for Social Courts
|
Surgical Center Flowchart
|
How Much Do I Need to Set Up a Physiotherapy Practice?
|
Dwg Project For Health Academy
|
Beer Manufacturing Flowchart
|
Weight Training Equipment Drawing
|
How Much Does It Cost to Set Up a Bowling Alley?
|
Car Wash Plants
|
Cost of setting up a physical chemistry laboratory
|
Raw Material for Making Crayons
|
How to Start a Computerized Embroidery Business
|
Costs in Dyeing
|
Plastic Packaging Factory Layout
|
What Does It Take to Set Up a Porcelain Factory?
|
Wood Autoclave Assembly
|
Equipment Required to Assemble a Precast Factory
|
Slot Car Layout Plan
|
Machine for Making Paper Cups for Sweets
|
How to Open an Acrylic Company
|
How to Set Up a Milk Factory
|
Equipment for Making Cottage Cheese
|
Moto Home Projects
|
Popular Two Bedroom House Plan Model
|
Ready Pop About Water Potability
|
Operational Process in Laboratory
|
Bus Floor Plan
|
Setting Up A Rapid Delivery Company
|
Business Plan for a Printing Company
|
Pool Cleaning Quote
|
.motorcycle autoparts
|
Fruit Production Technology
|
Cost of Opening a Tapioca Flour Factory
|
Organic Garden Economic Viability
|
Potato Washer - Manufacturers & Suppliers
|
Coconut Ice Factory
|
Food Business Plant Models
|
How to Set Up a Crematorium
|
Other projects ready:
How to start Clothing Industry to Produce Cloth Strainer with capacity for 50 units/day.
Project Factory to Produce Pepper Powder with capacity for 100 Kg/day.
PDF Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 500 Kg/day.
Plant and layout Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Project Factory to Produce Dough of Baked and Frozen Cheese Bread with capacity for 10.000 Kg/day.
Project Factory to Produce Fruit Juice with capacity for 300 liters/day.
FeasibilityFactory to Produce in Natura Pepper with capacity for 5.000 Kg/day.
Business plant Factory to Produce Costume Jewelry with capacity for 5.000 jewelries per day.
Project Factory to Produce Rum with capacity for 1.000 liters/day.
How to start Factory to Produce Pepper Sauce with capacity for 1.000 Kg per day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US