Ready project Leather Tanning with capacity to Produce 500 Leathers per day.

CODE - CTM-008

Ready project Leather Tanning with capacity to Produce 500 Leathers per day.

CODE - CTM-008


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Leather Tanning

How to start Leather Tanning with capacity to Produce 500 Leathers per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Leather Tanning

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Leather Drawing | Tannery Plant | Equipment for Setting Up a Chicken Shed | Truffle Making | Cosmetics Financing | I Want to Set Up a Hardware Store What Should I Do? | Leayot Cosmetic Store | Gas Station Feasibility Analysis | Assemble Espresso Coffee | How to Start a Gardening and Landscaping Business | What Does It Take to Open a Surfware Store? | Gingerbread Making Machine | Plant for Pharmacy | Recycling Leftover Tires | Language School Business Plan Example | Cattle Slaughter Flowchart Template | Football Society Plant | Clinical Feasibility Study Radiology | Office Organizational Chart Template | Academic Works on Restaurants | Facade of a 70m2 house | Flat Flowchart | Project to set up a pizzeria | Nursing Home Business Plan Suppliers | Fas Equine Therapy Project | Open a Phytotherapy Company | De2f Marble Works Organization Chart | Craft Shop Organization Chart Template | Making a Bikini | Shoe Factory With Assembly | How to Make Cell Phone Covers | Coal Packaging Factory | Cement Block Factory Layout | 3D Beer Refrigerator Electrical Diagram | Clay Production Equipment Manufacturers | Cage Manufacturing Machines | Microbiological Quality Control Laboratory Costs | Gruyere Cheese Making | Hospital Area Financial Flowchart Template | I Want to Open a Car Painting Shop | How to Create a Skate Park Project | Pharmacy Pops Models | Which Companies Perform The Ppho Procedure | How to Create a Business Plan for an Optical Store | Financial Project for Tourism Agency | To Set Up a Construction Company | Home Appliance Workshop Business | How Should I Open a Cleaning Agency? | Mineral Supplement Business Plan | Floor Plan Templates for Brick Factories | Production Cost Kg French Bread | Equipment for Manufacturing Snacks | Mushrooms2cproduction2c And Installations7ees | Banana Chips Factory |

 

Other projects ready:

How to start Factory for automatic processing of Fruit compote with an area of 500 m² (598 sq.yd.) and capacity for 7.500 kg/day.
Project Cold Storage Room to Produce Salted Fish and Fish Products with capacity for 3.000 Kg/day.
PDF Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 50.000 birds/day.
Plant and layout Pastry Shop with an area of 300 m2.
Project Factory to Produce Cachaça (Liquor), Açúcar Mascavo (Brown Sugar), Rapadura and Melado, with capacity for 5.000 liters/day. (To be built in a flat land).
Project Factory to Produce Banana Raisin with capacity for 30.000 Kg/day.
FeasibilitySlaughterhouse Turkey with capacity for 1.000 animals per day.
Business plant Factory to Produce Aerosol with capacity for 1.000 bottles per day.
Project Cold Storage Room to Produce and Dry Shark Fin and Fishes Swim Bladder with capacity to Produce 500 Kg/day.
How to start Factory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) Assados e Fritos (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 500 Kg/day.

Project - how to start Leather Tanning with capacity to Produce 500 Leathers per day.