Ready project Living Center for Elderlies with capacity for 200 beds.

CODE - ESC-018

Ready project Living Center for Elderlies with capacity for 200 beds.

CODE - ESC-018


Project ready with:

Project with the following sections:
Reception
Rooms
Pharmacy
Admission Office
Social Worker
Canteen
Storeroom
Kitchen
Pantry
Women's Bathrooms
Men's Bathrooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Living Center for Elderlies

How to start Living Center for Elderlies with capacity for 200 beds. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Living Center for Elderlies

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Senior Citizens Coexistence .dwg | Facades of Senior Citizens' Community Center | Community Center Floor Plan | I want to set up a Mine Market. What are the costs? | Letter Block Equipment#q=Signage Equipment Stores | I Want to Open a Hospitality Products Business | How to Set Up a Cold Store | Materials for Assembling a Pie House | What is the profitability of a glass shop? | Project Templates - Commerce | Assembly Company Distribution Surgical Materials | Frozen Foods How to Set Up a Business | Planning for a toy library | Sheep slaughterhouse plant | Quail Slaughterhouse | How to Open a Sports Court Business | Setting up a Children's Clinic | Basic Health Unit Project | How Much Does ICU Equipment Cost? | Plans for Setting Up a Coffee Shop | DWG Model Layout Of Supermarkets | How to Set Up an Experimental Kitchen in Pdf | Nightclub Business Plan | Drainage Project for Car Wash | Event House Project Template | Water P Cphd | Jeans Fabrication Project | Ways to Assemble a Polo Shirt | Machines for Producing Brooms | Upholstery Factory Projects | Factory With Capacity For Drumsticks | Floor Plan for Carpentry | Organizational Chart of an Asphalt Plant | Buy Egg Tray Factory | Aluminum Foil Brands | Aluminum Lunch Boxes Factories | Clinical Analysis Laboratory Business Plan | Written Project of a Cheese Factory | Design and Budget for the Assembly of a Distributor and Bottling of Mineral Water | How to Open Car Parking | Ready-made Standard Operating Procedure Template | Academic Work About Restaurant | Beauty Salon Organization Chart Template | Design and Construction of Greenhouses for Vegetable Gardens | Vehicle Tracking Business Plan | How to Create an HR Organizational Chart | Refrigeration Budget Templates | Setting Up a Small Filming Studio | Popsicle Factory Legislation | Pasta Drying Projects | Tapioca starch biscuit from Minas Gerais | Pulp Manufacturing Technology | Ketchup Manufacturing | Pet Shop Business Plan |

 

Other projects ready:

How to start Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 10.000 Kg per day.
Project Factory to Produce Wine, with capacity for 10.000 liters/year.
PDF Clothing Industry to Produce Jeans Pants with capacity for 1.000 garments/day.
Plant and layout Café with capacity for 300 people.
Project Factory to Produce Banana Sweet with capacity for 5.000 Kg per day.
Project Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
FeasibilityFactory to Produce Cachaça (Liquor) made from Manioc with capacity for 3.000 liters/day.
Business plant Factory to Produce Açúcar Mascavo (Brown Sugar), Rapadura and Melado, with capacity for 20.000 kg/day.
Project Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 20 liters.
How to start Factory to Produce Mead with capacity for 3.000 liters/day.

Project - how to start Living Center for Elderlies with capacity for 200 beds.