Ready project Rendering with capacity for 100 tons/day.

CODE - FRIG-205

Ready project Rendering with capacity for 100 tons/day.

CODE - FRIG-205


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 100 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How Much Does It Cost to Set Up a Rendering Shop? | How Much Will It Cost to Set Up a Grease Shop? | Grease Assembly | Cost of Assembly of Grease Plant | Small Farm Biodigester Plant | Multi-use Cleaner Industries | I Want to Set Up a Mini Market Where I Can Buy Products | Sale Signaling Equipment | I want to open a medical-hospital supplies store | Budget to Open a Cold Cuts and Wine Shop | Pie House Assembly | Glassworks | Set up an Intimate Fashion Distributor | Set Up a Surgical Materials Company | How to Start a Home-Based Food Business | Ready-made business plan for a toy library | View Refrigerator Business Plan | Quail Slaughterhouses | How to Assemble a Multi-Sports Court Plan | Set up a Medical Clinic | Ready Dwg File Executive Hotel | How Much Does It Cost to Set Up an Apiary | 3d Cafeteria Design | List of Materials and Equipment for Setting Up a Supermarket | Apae Experimental Kitchen | Business Plan for a Company - Nightclub | Lava Jato Financing Project | House Models for Events | How to Set Up an Online Restaurant Reservation Company | How to Set Up a Cement Glue Factory | How to Organize a Faction | Raw Material for Building a Polo Shirt | Raw Material for Making Brooms | Concrete Sofa | Carpentry Plant | Floor Plan of an Asphalt Plant | How to Produce Aluminum Foil | Disposable Lunch Box | Clinical Analysis Laboratory Business Plan | Cheese Factory Project | How Water Is Bottling Done | Template*Standard Operating Procedure | Pop Analysis | Beauty Salon Financial Business Plan Template | Ready School Garden Project | Vehicle Tracking Project | How to Set Up an HR | How to Open a Refrigeration Company | Setting Up a Filming Company | Factory Project Schedule Template | Pasta Factories in Brazil | Mariola Factory | How to Start a Tapioca Biscuit Manufacturing Business | Layout for Juice and Pulp Industry | Financing to Open Industry | Pet Shop Business Plan |

 

Other projects ready:

How to start Factory to Produce Rum with capacity for 500 liters/day.
Project Factory to Produce Freeze-Dried Powder Egg with capacity for 500 Kg/day.
PDF Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 100 Kg/day.
Plant and layout Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 300 garments/day.
Project Slaughterhouse Swines, Caprines, Ovines with capacity for 10 animals per day.
Project Slaughterhouse Ostrich Slaughter, to Produce Cold Meat (Sausages, Ham, Cold Meat and Smoked Products) and Special Cuts with capacity for 200 animals/day and area of 3.100 m².
FeasibilityFactory to Produce Dough of Frozen Cheese Bread with capacity for 1.000 Kg/day.
Business plant Hospital Waste Incinerator with capacity for 10.000 Kg/day.
Project Tanning Ovine Skin with capacity to Produce 2.000 skins per day.
How to start Factory to Produce Teas with capacity for 10.000 liters/day, Packed on Plastic Cup and PET Bottles.

Project - how to start Rendering with capacity for 100 tons/day.